Loading...
HomeSearchMy WebLinkAboutA001 Accessibility ReferenceA101 Floor Plan and Life SafetyA102 Roof Plans and DetailsA201 ElevationsA202 Enlarged ElevationsA301 Wall SectionsA501 DetailsA601 Window and Door SchedulesC0.0 Cover SheetC01 ALTA NSPS Land Title SurveyC1.0 General NotesC2.0 Existing Conditions & Demolition PlanC3.0 Site PlanC4.0 Pre-Construction Erosion Control PlanC4.1 Post-Construction Erosion Control PlanC4.2 Erosion Control DetailsC4.3 SWPPPC5.0 Grading and Drainage PlanC6.0 Utility PlanC6.1 Utility ProfilesC7.0 Construction DetailsC7.1 Construction DetailsC7.2 Construction DetailsC7.3 Construction DetailsC7.4 Construction DetailsC7.5 City of Carmel Paving PolicyC7.6 City of Carmel Curbing PolicyC8.0 Photometric PlanE001 Symbol LegendsE100 Electrical Site PlanE200 Lighting PlansE300 Electrical Power and SystemE301 Kitchen Equipment and DetailsE400 Single Lines DiagramF100 Foundation PlanF200 Foundation NotesF201 Foundation DetailsFull Release Cover SheetFull State ReleaseL1.0 Landscape PlanL1.1 Landscape DetailsM201 HVACM301 HVAC Schedule and LegendsP201 Plumbing PlansP301 Plumbing Schedule and DetailsS100 Roof Framing PlanS200 Typical FramingS201 Typical FramingS202 Framing DetailsS203 Typical Metal Stud Framing