Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
Search
My WebLink
About
19 0731_COMcheck Report_Mech
19 0801_COMcheck Report_Elec
19 0802_Structural Calc Package
A00.00 - DRAWING INDEX, LIFE SAFETY AND PROJECT INFORMATION
A00.10 - GENERAL NOTES AND TYPICAL MOUNTING HEIGHTS
A00.11 - ACCESSIBILITY INFORMATION
A00.20 - WALL PARTITION TYPES
A00.30 - DOOR TYPES, DOOR SCHEDULE AND HARDWARE
A00.31 - EQUIPMENT, FINISH AND MILLWORK SCHEDULES
A00.32 - MERRILL LYNCH DOOR, EQUIPMENT AND FINISH SCHEDULE
A00.33 - HARDWARE SCHEDULES
A00.33 6 - HARDWARE SCHEDULES
A00.50 - SITE PLAN
A02.01 - CONSTRUCTION PLAN
A02.02 - ROOF PLAN
A03.01 - POWER AND COMMUNICATION PLAN
A04.01 - REFLECTED CEILING PLAN
A05.01 - FINISH PLAN
A06.01 - FURNITURE PLAN
A09.00 - EXTERIOR ELEVATIONS
A09.01 - EXTERIOR ELEVATIONS
A09.10 - WALL SECTIONS
A09.11 - WALL SECTIONS
A09.12 - WALL SECTIONS
A09.21 - ENVELOPE DETAILS
A09.22 - ENVELOPE DETAILS
A09.23 - ENVELOPE DETAILS
A09.24 - ENVELOPE DETAILS
A10.00 - ATM & PAD PIT DETAILS
A11.00 - ENLARGED PLANS AND INTERIOR ELEVATIONS
A11.01 - ENLARGED PLANS AND INTERIOR ELEVATIONS
A11.02 - ENLARGED PLANS AND INTERIOR ELEVATIONS
A11.03 - ENLARGED PLANS AND INTERIOR ELEVATIONS
A11.04 - ENLARGED PLANS AND INTERIOR ELEVATIONS
A11.05 - ENLARGED PLANS AND INTERIOR ELEVATIONS
A11.05 6 - ENLARGED PLANS AND INTERIOR ELEVATIONS
A12.01 - MILLWORK - MW01
A12.02 - MILLWORK - MW05, MW06A, MW07
A12.03 - MILLWORK - MW08,MW11
A12.04 - MILLWORK - MW12, MW13
A12.05 - DETAILS
A12.06 - HIDDEN TELLER
A12.06 6 - HIDDEN TELLER
A12.09 - DOOR & OFFICE FRONT DETAILS
A12.10 - AIRLOCK DETAILS
A12.14 - TRASH ENCLOSURE
A12.14 6 - TRASH ENCLOSURE
A12.21 6 - MILLWORK DETAILS
A12.30 - CEILING DETAILS
A12.40 - FINISH DETAILS
BOA Carmel - Additional Details - 10.21.19
BOA Carmel Storm report
BoA Zionsville_Issue for Permit_ELEC_Specs_Combined
BoA Zionsville_Issue for Permit_MECH_Specs_Combined
BOA_Zionsville,IN_Project Manual-ARCH_Permit
C-1
C-10
C-2
C-3
C-4
C-5
C-6
C-7
C-8
C-9
City Response letter
COMcheck Report_Arch_062019
COVER PAGE
E00.00 - ELECTRICAL COVER SHEET
E00.50 - ELECTRICAL SITE PLAN
E01.01 - ELECTRICAL FIRST FLOOR RCP -LIGHTING
E02.01 - ELECTRICAL FIRST FLOOR PLAN -POWER & SYSTEMS
E02.02 - ELECTRICAL ROOF PLAN
E03.01 - ELECTRICAL FIRST FLOOR PLAN -FIRE ALARM
E05.00 - ELECTRICAL DETAILS
E06.00 - ELECTRICAL SCHEDULES
E06.01 - ELECTRICAL SCHEDULES
L-1 - Planting Plan
L-2 - DETAILS
M0.0 - MECHANICAL COVER SHEET
M1.1 - FIRST FLOOR PLAN - MECHANICAL
M1.2 - ROOF PLAN - MECHANICAL
M2.0 - MECHANICAL DETAILS
M3.0 - MECHANICAL SCHEDULES
M4.0 - MECHANICAL CONTROLS WIRING DIAGRAMS
M4.1 - MECHANICAL CONTROLS WIRING DIAGRAMS
P1.0 - UNDERFLOOR PLUMBING PLAN
P1.1 - FIRST FLOOR PLAN - PLUMBING
P1.2 - ROOF PLAN - PLUMBING
P2.0 - PLUMBING DETAILS
P2.1 - PLUMBING RISERS
P3.0 - PLUMBING SCHEDULES
plan_design_release04292005_Updated
S00.01 - GENERAL NOTES
S00.02 - GENRAL NOTES, SYMBOLS AND ABBREVIATIONS
S01.01 - FOUNDATION PLAN
S01.02 - ROOF FRAMING PLAN
S02.01 - CONCRETE DETAILS
S03.01 - STEEL DETAILS
S03.02 - STEEL DETAILS
S04.01 - BRACED FRAME ELEVATIONS