Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
Search
My WebLink
About
170187000_NorthEndSecondaryPlat.CDs_Rev4.2020-11-25
170187000_NorthEndSecondaryPlat.CDs_Rev5.2021-01-06
18-0128 - NORTH END - SECONDARY PLAT DRAIN REPORT
18-0128 - NORTH END - SECONDARY PLAT O&M MANUAL
18-0128 - North End Phase 1 - C1.0 COVER
18-0128 - North End Phase 1 - C1.0_COVER (2)
18-0128 - North End Phase 1 - C1.1 SITE DEVELOPMENT PLAN
18-0128 - North End Phase 1 - C1.1_SITE DEVELOPMENT PLAN (2)
18-0128 - North End Phase 1 - C1.2 GRADING & DRAINAGE PLAN
18-0128 - North End Phase 1 - C1.2_GRADING & DRAINAGE PLAN (2)
18-0128 - North End Phase 1 - C1.3 PRE-CONSTRUCTION SWPPP
18-0128 - North End Phase 1 - C1.3_PRE-CONSTRUCTION SWPPP (2)
18-0128 - North End Phase 1 - C1.4 POST-CONSTRUCTION SWPPP
18-0128 - North End Phase 1 - C1.4_POST-CONSTRUCTION SWPPP (2)
18-0128 - North End Phase 1 - C1.5 UTIL COORD PLAN
18-0128 - North End Phase 1 - C1.5_UTIL COORD PLAN (2)
18-0128 - North End Phase 1 - C1.6_EMERGENCY FLOOD ROUTING
18-0128 - North End Phase 1 - C2.0 STREET P-P
18-0128 - North End Phase 1 - C2.1 STREET P-P
18-0128 - North End Phase 1 - C2.1_STREET P-P (2)
18-0128 - North End Phase 1 - C2.2 STREET P-P
18-0128 - North End Phase 1 - C2.2_STREET P-P (2)
18-0128 - North End Phase 1 - C2.3 STREET P-P
18-0128 - North End Phase 1 - C2.3_STREET P-P (2)
18-0128 - North End Phase 1 - C2.4 STREET P-P
18-0128 - North End Phase 1 - C2.4_STREET P-P (2)
18-0128 - North End Phase 1 - C2.5 STREET P-P
18-0128 - North End Phase 1 - C2.5_STREET P-P (2)
18-0128 - North End Phase 1 - C2.6 STREET P-P
18-0128 - North End Phase 1 - C2.6_STREET P-P (2)
18-0128 - North End Phase 1 - C2.7 STREET P-P
18-0128 - North End Phase 1 - C2.7_STREET P-P (2)
18-0128 - North End Phase 1 - C3.0 MOT
18-0128 - North End Phase 1 - C3.0_MOT (2)
18-0128 - North End Phase 1 - C3.1_INT DETAILS
18-0128 - North End Phase 1 - C3.2_INT DETAILS
18-0128 - North End Phase 1 - C3.3_INT DETAILS
18-0128 - North End Phase 1 - C3.4_TRAFFIC CTRL & LIGHTING
18-0128 - North End Phase 1 - C4.0 SAN P-P
18-0128 - North End Phase 1 - C4.0_SAN P-P (2)
18-0128 - North End Phase 1 - C4.1 SAN P-P
18-0128 - North End Phase 1 - C4.1_SAN P-P (2)
18-0128 - North End Phase 1 - C4.2 SAN P-P
18-0128 - North End Phase 1 - C4.2_SAN P-P (2)
18-0128 - North End Phase 1 - C6.0 STORM P-P
18-0128 - North End Phase 1 - C6.0_STORM P-P (2)
18-0128 - North End Phase 1 - C6.1 STORM P-P
18-0128 - North End Phase 1 - C6.1_STORM P-P (2)
18-0128 - North End Phase 1 - C6.2 STORM P-P
18-0128 - North End Phase 1 - C6.2_STORM P-P (2)
18-0128 - North End Phase 1 - C6.3 STORM P-P
18-0128 - North End Phase 1 - C6.3_STORM P-P (2)
18-0128 - North End Phase 1 - C6.4 STORM P-P
18-0128 - North End Phase 1 - C6.4_STORM P-P (2)
18-0128 - North End Phase 1 - C6.5 STORM P-P
18-0128 - North End Phase 1 - C6.5_STORM P-P (2)
18-0128 - North End Phase 1 - C6.6 STORM P-P
18-0128 - North End Phase 1 - C6.6_STORM P-P (2)
18-0128 - North End Phase 1 - C6.7 STORM P-P
18-0128 - North End Phase 1 - C6.7_STORM P-P (2)
18-0128 - North End Phase 1 - C6.8_SSD & SUMP PUMP PLAN
18-0128 - North End Phase 1 - C7.0 WATER DIST PLAN
18-0128 - North End Phase 1 - C7.0_WATER DIST PLAN (2)
18-0128 - North End Phase 1 - C8.0 SWPPP NOTES
18-0128 - North End Phase 1 - C8.0_SWPPP NOTES (2)
18-0128 - North End Phase 1 - C8.1 SWPPP DETAILS
18-0128 - North End Phase 1 - C8.1_SWPPP DETAILS (2)
18-0128 - North End Phase 1 - C8.2 CONST DETAILS
18-0128 - North End Phase 1 - C8.2_CONST DETAILS (2)
18-0128 - North End Phase 1 - C8.3 CONST DETAILS
18-0128 - North End Phase 1 - C8.3_CONST DETAILS (2)
18-0128 - North End Phase 1 - C8.4 HCSO DETAILS
18-0128 - North End Phase 1 - C8.4_HCSO DETAILS (2)
18-0128 - North End Phase 1 - C8.5 CARMEL WATER SPECS
18-0128 - North End Phase 1 - C8.5_CARMEL WATER SPECS (2)
18-0128 - North End Phase 1 - C8.6 CARMEL WATER DETAILS
18-0128 - North End Phase 1 - C8.7 CARMEL SEWER DETAILS
18-0128 - North End Phase 1 - C8.8 CARMEL SEWER SPECS
18-0128 - North End Phase 1 - C8.8_CARMEL SEWER SPECS (2)
18-0128 - North End Phase 1 - C8.9_CARMEL PAVING & CURBING (2)
18-0128 - North End Phase 1 - L0.1 LA DEV OVERALL PLAN
18-0128 - North End Phase 1 - L0.1_LA DEV OVERALL PLAN (2)
18-0128 - North End Phase 1 - L0.2 LA DEV GEN NOTES & SCHEDULE
18-0128 - North End Phase 1 - L0.3 TREE PRESERVATION PLAN
18-0128 - North End Phase 1 - L0.4 LANDSCAPE DETAILS
18-0128 - North End Phase 1 - L0.4_LANDSCAPE DETAILS (2)
18-0128 ALTA_Topo-1
18-0128 ALTA_Topo-2
18-0128 ALTA_Topo-3
18-0128 ALTA_Topo-4
18-0128 ALTA_Topo-5
18-0128 ALTA_Topo-6
18-0128 ALTA_Topo-7
18-0128_North End Phase 1 - C1.0 COVER
18-0128_North End Phase 1 - C1.1 SITE DEVELOPMENT PLAN
18-0128_North End Phase 1 - C1.2 GRADING AND DRAINAGE PLAN
18-0128_North End Phase 1 - C1.3 PRE-CONSTRUCTION SWPPP
18-0128_North End Phase 1 - C1.4 POST-CONSTRUCTION SWPPP
18-0128_North End Phase 1 - C1.5 UTIL COORD PLAN
18-0128_North End Phase 1 - C1.6 EMERGENCY FLOOD ROUTING
18-0128_North End Phase 1 - C2.0 STREET P-P
18-0128_North End Phase 1 - C2.1 STREET P-P
18-0128_North End Phase 1 - C2.2 STREET P-P
18-0128_North End Phase 1 - C2.3 STREET P-P
18-0128_North End Phase 1 - C2.4 STREET P-P
18-0128_North End Phase 1 - C2.5 STREET P-P
18-0128_North End Phase 1 - C2.6 STREET P-P
18-0128_North End Phase 1 - C2.7 STREET P-P
18-0128_North End Phase 1 - C2.8 STREET P-P
18-0128_North End Phase 1 - C3.0 MOT
18-0128_North End Phase 1 - C3.1 INT DETAILS
18-0128_North End Phase 1 - C3.2 INT DETAILS
18-0128_North End Phase 1 - C3.3 INT DETAILS
18-0128_North End Phase 1 - C3.4 TRAFFIC CTRL & LIGHTING
18-0128_North End Phase 1 - C4.0 SAN P-P
18-0128_North End Phase 1 - C4.1 SAN P-P
18-0128_North End Phase 1 - C4.2 SAN P-P
18-0128_North End Phase 1 - C4.3 SAN P-P
18-0128_North End Phase 1 - C6.0 STORM P-P
18-0128_North End Phase 1 - C6.1 STORM P-P
18-0128_North End Phase 1 - C6.2 STORM P-P
18-0128_North End Phase 1 - C6.3 STORM P-P
18-0128_North End Phase 1 - C6.4 STORM P-P
18-0128_North End Phase 1 - C6.5 STORM P-P
18-0128_North End Phase 1 - C6.6 STORM P-P
18-0128_North End Phase 1 - C6.7 STORM P-P
18-0128_North End Phase 1 - C6.8 SSD & SUMP PUMP PLAN
18-0128_North End Phase 1 - C7.0 WATER DIST PLAN
18-0128_North End Phase 1 - C8.0 SWPPP NOTES
18-0128_North End Phase 1 - C8.1 SWPPP DETAILS
18-0128_North End Phase 1 - C8.2 CONST DETAILS
18-0128_North End Phase 1 - C8.3 CONST DETAILS
18-0128_North End Phase 1 - C8.4 CONST DETAILS
18-0128_North End Phase 1 - C8.5 CONST DETAILS
18-0128_North End Phase 1 - C8.6 CONST DETAILS
18-0128_North End Phase 1 - C8.7 CONST DETAILS
18-0128_North End Phase 1 - C8.8 CONST DETAILS
18-0128_North End Phase 1 - C9.0 HCSO DETAILS
18-0128_North End Phase 1 - C9.1 CARMEL WATER SPECS
18-0128_North End Phase 1 - C9.2 CARMEL WATER DETAILS
18-0128_North End Phase 1 - C9.3 CARMEL SEWER DETAILS
18-0128_North End Phase 1 - C9.4 CARMEL SEWER SPECS
18-0128_North End Phase 1 - C9.5 CARMEL PAVING AND CURBING
18-0128_North End Phase 1 - COMMON AREA PLAN
18-0128_North End Phase 1 - L0.1 LA DEV OVERALL PLAN
18-0128_North End Phase 1 - L0.2 LA DEV GEN NOTES & SCHEDULE
18-0128_North End Phase 1 - L0.3 TREE PRESERVATION PLAN
18-0128_North End Phase 1 - L0.4 LANDSCAPE DETAILS
18-0128_North End Phase 1 - Parking Exhibit
C0.0 COVER SHEET
C0.1 GENERAL NOTES
C0.2 GENERAL SPECIFICATIONS
C0.3 CARMEL SPECIFICATIONS
C0.4 TYPICAL ROAD SECTIONS
C0.5 TYPICAL ROAD SECTIONS
C1.0 OVERALL EXISTING CONDITIONS
C1.1 EXISTING CONDITIONS & DEMOLITION PLAN
C1.2 EXISTING CONDITIONS & DEMOLITION PLAN
C10.0 MAINTENANCE OF TRAFFIC PLAN
C2.0 OVERALL SITE PLAN
C2.1 SITE PLAN
C2.2 SITE PLAN
C3.0 EROSION CONTROL PLAN
C3.1 SWPPP
C3.2 EROSION CONTROL DETAILS
C4.1 GRADING & DRAINAGE PLAN
C4.2 GRADING & DRAINAGE PLAN
C4.3 OFFSITE GRADING & DRAINAGE PLAN
C5.0 ROAD PLAN AND PROFILE
C5.1 ROAD PLAN AND PROFILE
C5.2 ROAD PLAN AND PROFILE
C5.3 ROAD PLAN AND PROFILE
C5.4 ROAD PLAN AND PROFILE
C5.5 ROAD PLAN AND PROFILE
C5.6 ROAD PLAN AND PROFILE
C5.7 ROAD PLAN AND PROFILE
C6.0 OVERALL UTILITY PLAN
C6.1 UTILITY PLAN
C6.2 UTILITY PLAN
C6.3 STRUCTURE DATA TABLES
C7.0 STORM PLAN AND PROFILE
C7.1 STORM PLAN AND PROFILE
C7.10 STORM PLAN AND PROFILE
C7.2 STORM PLAN AND PROFILE
C7.3 STORM PLAN AND PROFILE
C7.4 STORM PLAN AND PROFILE
C7.5 STORM PLAN AND PROFILE
C7.6 STORM PLAN AND PROFILE
C7.7 STORM PLAN AND PROFILE
C7.8 STORM PLAN AND PROFILE
C7.9 STORM PLAN AND PROFILE
C8.0 SANITARY PLAN AND PROFILE
C8.1 SANITARY PLAN AND PROFILE
C8.2 SANITARY PLAN AND PROFILE
C9.0 CONSTRUCTION DETAILS
C9.1 CONSTRUCTION DETAILS
C9.2 CONSTRUCTION DETAILS
C9.3 CONSTRUCTION DETAILS
C9.4 CONSTRUCTION DETAILS
C9.5 CONSTRUCTION DETAILS
C9.6 CONSTRUCTION DETAILS
C9.8 CONSTRUCTION DETAILS
GRADING & DRAINAGE PLAN - INLET OVERFLOW-EXHIBIT
L1.0 OVERALL LANDSCAPE PLAN
L1.1 LANDSCAPE PLAN
L1.2 LANDSCAPE PLAN
L1.3 LANDSCAPE DETAILS
L1.3 LANDSCAPE PLAN
L1.4 LANDSCAPE DETAILS
LS-20-5135 R2-E101-Photometric Plan
North_End_Section_1_Secondaray Plat