Loading...
HomeSearchMy WebLinkAboutA-001 - GENERAL NOTES, SYMBOLS, AND STANDARD MOUNTING HEIGHTSA-002 - INTERIOR PARTITION TYPES AND STANDARD PARTITION DETAILSA-101 - FIRST FLOOR PLANA-101G - GARAGE FIRST FLOOR PLANA-102 - SECOND FLOOR PLANA-102G - GARAGE SECOND FLOOR PLANA-103 - THIRD FLOOR PLANA-103G - GARAGE THIRD FLOOR PLANA-104 - FOURTH FLOOR PLANA-104G - GARAGE FOURTH FLOOR PLANA-105 - FIFTH FLOOR PLANA-105G - GARAGE FIFTH FLOOR PLANA-106 - ROOF PLANA-106G - GARAGE ROOF PLANA-131 - FIRST FLOOR REFLECTED CEILING PLANA-131G - FIRST FLOOR REFLECTED CEILING PLANA-133 - THIRD FLOOR REFLECTED CEILING PLANA-135 - FIFTH FLOOR REFLECTED CEILING PLANA-136 - LIGHT FIXTURE SCHEDULEA-156 - FINISH SCHEDULEA-201 - EXTERIOR ELEVATIONSA-201G - GARAGE EXTERIOR ELEVATIONSA-202 - EXTERIOR ELEVATIONSA-202G - GARAGE EXTERIOR ELEVATIONSA-301 - BUILDING SECTIONSA-301G - GARAGE BUILDING SECTIONSA-321 - WALL SECTIONSA-321G - GARAGE WALL SECTIONSA-322 - WALL SECTIONSA-323 - WALL SECTIONSA-350 - EXTERIOR SECTION DETAILSA-350G - GARAGE EXTERIOR DETAILSA-351 - EXTERIOR SECTION DETAILSA-352 - EXTERIOR SECTION DETAILSA-355 - EXTERIOR PLAN DETAILSA-355G - GARAGE EXTERIOR PLAN DETAILSA-356 - EXTERIOR PLAN DETAILSA-401 - ENLARGED PLANS -PEDESTRIANWALKWAYA-402 - ENLARGED PLANS -PEDESTRIANWALKWAYA-403 - ENLARGED PLANS SOFFITSA-411 - ENLARGED RESTROOM PLANSA-421 - STAIR AND ELEVATOR PLANS AND SECTIONSA-421G - GARAGE STAIR AND ELEVATOR PLANS AND SECTIONSA-422 - STAIR AND ELEVATOR PLANS AND SECTIONSA-422G - GARAGE STAIR AND ELEVATOR PLANS AND SECTIONSA-423 - STAIR 03 PLANS AND SECTIONSA-501 - INTERIOR ELEVATIONSA-601 - DOOR SCHEDULE AND DETAILSA-601G - GARAGE DOOR SCHEDULE AND DETAILSA-602 - DOOR SCHEDULE AND DETAILSA-621 - WINDOW ELEVATIONS AND DETAILSA-621G - GARAGE WINDOW ELEVATIONS AND DETAILSA-622 - WINDOW ELEVATIONS AND DETAILSA-623 - WINDOW ELEVATIONS AND DETAILSA-650 - FINISH SCHEDULE AND FINISH DETAILSA-901 - 3D REPRESENTATIONSA-901G - GARAGE 3D REPRESENTATIONSA-902 - 3D REPRESENTATIONSC000-TITLE SHEETC100-SV-1-BOUNDARY RETRACEMENT SURVEYC100-SV-2-TOPOGRAPHIC SURVEYC100-SV-3-TOPOGRAPHIC SURVEYC101-DEMOLITION PLANC102-SITE GRADING PLANC103-SITE GRADING PLANC400-OVERALL DRAINAGE PLANC401-DRAINAGE PLANC402-DRAINAGE PLANC403-STORM SEWER PROFILEC404-STORM SEWER PROFILEC405-STORM SEWER TABLESC406-FLOOD ROUTING PLANC500-UTILITY PLANC501-UTILITY PLANC502-UTILITY PLANC800-SITE DETAILSC801-SITE DETAILSC802-SITE DETAILSC803-SITE DETAILSC804-SITE DETAILSC805-SITE DETAILSC806-SITE DETAILSC807-SITE DETAILSC808-SITE DETAILSC900-STORMWATER POLLUTION AND PREVENTION PLANC900-TEMP.STORMWATER POLLUTION PREVENTION PLANC901-PERMANENT STORMWATER POLLUTION AND PREVENTION PLANC901-STORMWATER POLLUTION PREVENTION NOTESC902-STORMWATER POLLUTION AND PREVENTION DETAILSC902-STORMWATER POLLUTION PREVENTION DETAILSC903-STORMWATER POLLUTION AND PREVENTION NOTESC903-STORMWATER POLLUTION PREVENTION DETAILSG-001 - CoverG-002 - SHEET INDEXG-003 - LIFE SAFETY PLANS AND CODE SUMMARYG-004 - LIFE SAFETY PLANS AND CODE SUMMARYG-004G - GARAGE LIFE SAFETY PLANS AND CODE SUMMARYL-001 GENERAL INFORMATIONL-201 SITE FEATURES PLANL-202 SITE FEATURES PLANL-301 SITE GRADING PLANL-302 SITE GRADING PLANL-501 SITE PLANTING PLANL-502 SITE PLANTING PLANL-503 PLANTING DETAILSL-511 SOILS PLACEMENT PLANL-512 SOILS PLACEMENT PLANL-701 SITE DETAILSL-702 SITE DETAILSL-703 SITE DETAILSL-704 SITE DETAILSS-100 - GENERAL STRUCTURAL NOTESS-110 - LOADING DIAGRAMSS-201 - OFFICE - FOUNDATION _ SLAB-ON-GROUND PLANS-201G - GARAGE -FOUNDATION _ SLAB-ON-GROUND PLANS-202 - OFFICE - SECOND FLOOR FRAMING PLANS-202G - GARAGE - SECOND FLOOR FRAMING PLANS-202GPT-GARAGE-SECOND-FLOOR-POST-TENSION--MILD-REINFORCING-PLANS-202MB - OFFICE - SECOND FLOOR MILD REINFORCING PLAN -BOTTOMS-202MT - OFFICE - SECOND FLOOR MILD REINFORCING PLAN -TOPS-202PT - OFFICE - SECOND FLOOR POST-TENSION PLANS-203 - OFFICE - THIRD FLOOR FRAMING PLANS-203G - GARAGE - THIRD FLOOR FRAMING PLANS-203GPT-GARAGE-THIRD-FLOOR-POST-TENSION--MILD-REINFORCING-PLANS-203MB - OFFICE - THIRD FLOOR MILD REINFORCING PLAN - BOTTOMS-203MT - OFFICE - THIRD FLOOR MILD REINFORCING PLAN - TOPS-203PT - OFFICE - THIRD FLOOR POST-TENSION PLANS-204 - OFFICE - FOURTH FLOOR FRAMING PLANS-204G - GARAGE - FOURTH FLOOR FRAMING PLANS-204GPT-GARAGE-FOURTH-FLOOR-POST-TENSION--MILD-REINFORCING-PLANS-204MB - OFFICE - FOURTH FLOOR MILD REINFORCING PLAN -BOTTOMS-204MT - OFFICE - FOURTH FLOOR MILD REINFORCING PLAN -TOPS-204PT - OFFICE - FOURTH FLOOR POST-TENSION PLANS-205 - OFFICE - FIFTH FLOOR FRAMING PLANS-205G - GARAGE - FIFTH FLOOR FRAMING PLANS-205GPT-GARAGE-FIFTH-FLOOR-POST-TENSION--MILD-REINFORCING-PLANS-205MB - OFFICE - FIFTH FLOOR MILD REINFORCING PLAN - BOTTOMS-205MT - OFFICE - FIFTH FLOOR MILD REINFORCING PLAN - TOPS-205PT - OFFICE - FIFTH FLOOR POST-TENSION PLANS-206 - OFFICE - ROOF FRAMING PLANS-206MB - OFFICE - ROOF MILD REINFORCING PLAN -BOTTOMS-206MT - OFFICE - ROOF MILD REINFORCING PLAN -TOPS-206PT - OFFICE - ROOF POST-TENSION PLANS-207-OFFICE-MECHANICAL-SCREEN-WALL-PLAN,-SECTIONS--DETAILSS-208.1-OFFICE-BRIDGE-CONNECTOR-FRAMING-SECTIONS--DETAILSS-208-OFFICE-BRIDGE-CONNECTOR-FRAMING-PLANS--ELEVATIONSS-209G-GARAGE-STAIR-TOWER-PLANS,-SECTIONS--DETAILSS-301 - TYPICAL FOUNDATION DETAILSS-302 - OFFICE - FOUNDATION DETAILSS-302G - GARAGE -FOUNDATION DETAILSS-310 - OFFICE - CONCRETE WALL DETAILSS-311 - OFFICE - CONCRETE WALL DETAILSS-312 - TYPICAL CONCRETE FRAMING DETAILSS-401 - OFFICE - COLUMN DETAILS SCHEDULE AND DETAILSS-401G - GARAGE - COLUMN SCHEDULE AND DETAILSS-501 - TYPICAL POST-TENSION DETAILS - 01S-502 - TYPICAL POST-TENSION DETAILS - 02S-503 - OFFICE -POST-TENSION AND MILD REINFORCED BEAM SCHEDULES-503G - GARAGE -POST-TENSION AND MILD REINFORCED BEAM SCHEDULESS-601 - TYPICAL STEEL FRAMING DETAILSS-602 - OFFICE - FRAMING DETAILS - 01S-602G - GARAGE - FRAMING DETAILS - 01S-603 - OFFICE - FRAMING DETAILS - 02S-603G - GARAGE - FRAMING DETAILS - 02S-604 - OFFICE - FRAMING DETAILS - 03S-604G - GARAGE - FRAMING DETAILS - 03S-701 - TYPICAL MASONRY DETAILSSV-1-BOUNDARY RETRACEMENT SURVEYSV-2-TOPOGRAPHIC SURVEYSV-3-TOPOGRAPHIC SURVEY