Loading...
HomeSearchMy WebLinkAboutA00_CO1 - COVER SHEETA05_A3.01 - BUILDING ELEVATIONSBadger Fieldhouse LP stamped approvedC01_SU1.2_Site Utility PlanC02_SU1.3_Site Utility PlanC03_SU2.1_Storm DetailsC04_SU2.2_Storm DetailsC05_SU2.3_Storm DetailsC06_SU2.4_Storm DetailsC07_SU2.5_Storm DetailsC08_SU3.1_Sanitary Sewer DetailsC09_SU4.1_Water DetailsC10_SU4.2_Water DetailsE1 - ELECTRICAL SITE PLANG0_General NotesG01_G1.0_General NotesG02_G2.1_Site PlanG03_G2.2_Site PlanG04_G3.1_Grading PlanG05_G3.2_Grading PlanG06_G3.4_Pad Grading PlanG07_G4.1_Erosion Control PlanG08_G4.2_Erosion Control PlanG09_G4.3-Erosion Control DetailsG1_Overall Site PlanG10_G4.4_Erosion Control DetailsG11_G4.5_SWPPPG11_Site DetailsG12_Emergency Flood Routing PlanG12_G6.1_Site DetailsG13_GD1.0_Demo PlanG14_GD1.1_Demo PlanG2_Site PlanG3.5_Grading PlanG3_Grading PlanG4.5_Emergency Flood Routing PlanG4_Erosion Control PlanG5 - Erosion Control DetailsG5_Erosion Control PlanG6-SWPPPG7_Site PlanG8 - Erosion Control DetailsGD1.0_Demo Plan-Demo PlanL1_Landscape PlanL15_L1.1-Landscape PlanL16_L1.2-Landscape PlanL17_L1.3-Landscape DetailsL2_Landscape PlanL3-Landscape DetailsS1_ALTA 1S2_ALTA 2S3_ALTA 3S4_ALTA 4SU1_Storm Sewer PlanSU10_Water DetailsSU11_Water DetailsSU2_Site Utility PlanSU3_Sanitary Sewer DetailsSU4_Site Utility PlanSU5_Storm DetailsSU6_Storm DetailsSU7_Storm DetailsSU8_Storm DetailsSU9_Storm DetailsSUPP1 - Field Lighting Analysis and FixtureSUPP2 - Exterior RenderingSUPP4 - Traffic MemoSUPP5 - Fire Protection Memo