Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
Search
My WebLink
About
1 Cover Sheet
10 G4.2 Erosion Control Plan
11 G4.3 Erosion Control Details
12 G4.4 Erosion Control Details ASI3
13 G4.5 SWPPP
14 G6.1 Site Details ASI3
15 GD1.0 Demolition Plan
16 GD1.1 Demolition Plan
17 L1.1 Landscape Plan - North
18 L1.2 Landscape Plan - South
19 L1.3 Landscape Details
2 INDEX
20 SU1.2 Site Utilities Plan ASI3
21 SU1.3 Site Utilities Plan ASI3
22 SU2.1 Utility Details
23 SU2.2 Utility Details
24 SU2.3 Utility Details
25 SU2.4 Utility Details ASI3
26 SU2.5 Utility Details
27 SU3.1 Utility Details
28 SU4.1 Utility Details
29 SU4.2 Utility Details
3 G1.0 General Notes
30 S0.01 General Notes
31 S0.02 General Notes
32 S1.01 Unit A - Foundation Plan ASI1
33 S1.02 Unit B - Foundation Plan ASI1
34 S1.03 Unit B - First Floor Slab and Basement Plan
35 S1.04 Unit B - 2nd Floor Framing and Slab Plan
36 S3.01 Foundation Details ASI1
37 S3.02 Foundation Details
38 S3.03 Foundation Details
38.5 S3.04 Foundation Details ASI1
39 S4.01 Masonry Details
4 G2.1 Site Layout Plan South ASI3
40 S4.02 Masonry Details
41 S4.03 Masonry Details
42 S5.01 Framing Details
43 A0.01 Code Plans
44 A1.01 First Floor Architectural Plan ADD1
45 A1.02 Second Floor Plan & Enlarged Plan & Details ADD1
46 A1.03 Wall Types, Enlarged Plans and Details ADD1
47 A2.01 Roof Plan ADD1
48 A3.01 Building Elevations ADD1
49 A5.01 Sections & Details ADD1
5 G2.2 Site Layout Plan North ASI3
50 A5.02 Wall Sections
51 A5.03 Wall Sections
52 A6.01 Door and Frame Schedule ADD1
53 A6.02 Frame Details
54 A7.01 Equipment Plan ADD3
55 A7.02 Interior Room Signs
56 A7S.01 Equipment Details
57 A8.01 Finish Plans
58 A8.02 Court Layouts ADD1
59 A8S.01 List of Finishes
6 G3.1 Grading Plan
60 A9.01 First Floor Reflected Ceiling Plan
61 A10.01 Vertical Circulation
62 P1.01 Symbols & Abbreviations
63 P2.01 Foundation Plumbing Plan
64 P2.02 First Floor Plumbing Plan
65 P2.03 Second Floor Plumbing Plan
66 P3.01 Plumbing Schedules and Details
67 P3.02 Plumbing Isometric
68 P4.01 Enlarged Plumbing Plans
69 PFP2.01 First Floor Fire Protection Plan
7 G3.2 Grading Plan ASI3
7.5 G3.3 Emergency Flood Routing Plan ASI3
70 PFP2.02 Second Floor Fire Protection Plan
71 M1.01 Symbols & Abbreviations
72 M2.01 First Floor Mechanical Plan
73 M2.02 1st Floor Enlarged Plans and 2nd Floor Mechanical Plan
74 M5.01 Mechanical Schedules
75 M5.02 Mechanical Details
76 E1.01 Electrical Symbols Legend
77 E1.02 Electrical Details
78 E2.01 Electrical Site Plan ADD3
79 E2.02 Electrical Site Plan ADD3
8 G3.4 Pad Grading Plan
80 E3.01 Unit A - First Floor Technology Rough in Plan ADD2
81 E3.02 Technology Rough In Details
82 E3.03 Technology Rough In Details
8-26-20 plat
83 E4.01 First Floor Field Lighting Plan
84 E4.02 First Floor North Court Lighting Plan
85 E4.03 First Floor South Court Lighting Plan
86 E5.01 First Floor Field Power Plan ADD2
87 E5.02 First Floor North Courts and Mezzanine Power Plan ADD2
88 E5.03 First Floor South Courts Power Plan
89 E6.01 First Floor Field Fire Alarm Plan
9 G4.1 Erosion Control Plan ASI3
90 E6.02 First Floor Courts and Mezzanine Fire Alarm Plan
91 E7.01 Single Line
92 E8.01 Luminaire Schedules ADD2
93 E8.02 Panelboard Schedules ADD2
94 T1.01 Technology Details
95 T1.02 Technology Details
96 T2.01 Technology Site Plan
97 T2.02 Technology Site Plan
98 T3.01 Unit A First Floor Technology Plan
Badger Fieldhouse LP stamped approved
Badger Indoor Facility - Use Occupancy Analysis 11.10.2020
e2.01
L1.1-Landscape Plan
plan_design_release04292005_modified
Plumbing Drawings
T3.01 Unit A - First Floor Technology Plan ADD2
Technology Drawings