Loading...
HomeSearchMy WebLinkAbout100 TITLE SHEET1000 MISCELLANEOUS SITE DETAI1001 MISCELLANEOUS UTILITY DETA1100 SPECIFICATIONS1200 Street Tree Planting Plan200 TOPOGRAPHICAL SURVEY AND DEMOLITION PLAN300 SITE DIMENSION PLAN400 UTILITY PLAN401 WATER PLAN500 GRADING PLAN501 ROAD PLAN AND PROFILE600 DRAINAGE PLAN700 STORM PLAN AND PROFILE701 STORM PLAN AND PROFILE702 STORM PLAN AND PROFILE703 STORM PLAN AND PROFILE704 STORM PLAN AND PROFILE705 STORM PLAN AND PROFILE706 STORM PLAN AND PROFILE800 RETAINING WALL PLAN AND PROFILE801 RETAINING WALL PLAN AND PROFILE802 RAMP AND STEP DETAILS900 PRE-CONSTRUCTION EROSION CONTROL PLAN901 POST-CONSTRUCTION EROSION CONTROL PLAN902 STORMWATER POLLUTION PREVENTION PLANA001 - FIRST FLOOR CODE PLANA002 - SECOND FLOOR CODE PLANA003 - THIRD FLOOR CODE PLANA004 - FOURTH FLOOR CODE PLANA011 - SPECIFICATIONSA012 - SPECIFICATIONSA021 - FLOOR AND ROOF ASSEMBLIESA022 - WALL ASSEMBLIESA031 - UL RATED ASSEMBLIESA032 - UL RATED ASSEMBLIESA033 - UL RATED ASSEMBLIESA034 - UL RATED ASSEMBLIESA037 - UL RATED ASSEMBLIESA041 - ACCESSIBILITY DETAILSA051 - WINDOW SCHEDULE & DETAILSA052 - WINDOW SCHEDULE & DETAILSA061 - DOOR SCHEDULE & DETAILSA111 - FIRST FLOOR PLANA112 - SECOND FLOOR PLANA113 - THIRD FLOOR PLANA114 - FOURTH FLOOR PLANA115 - ROOF PLANA116 - SECOND FLOOR PLAN OPTIONA131 - ENLARGED ELEVATOR PLANS & DETAILSA132 - ENLARGED STAIR PLANS & DETAILSA133 - ENLARGED STAIR PLANS & DETAILSA171 - PLAN DETAILSA211 - OVERALL EXTERIOR ELEVATIONSA212 - OVERALL EXTERIOR ELEVATIONSA301 - WALL SECTIONSA311 - INTERIOR WALL SECTIONSA351 - SECTION DETAILSA381 - SECTION DETAILSA400 - TYPICAL UNIT DETAILSCFD Response letterConstruction Stormwater - Notice of Sufficiency INRA08174Construction Stormwater CertificationE111 - OVERALL FIRST FLOOR ELECTRICAL PLANE112 - OVERALL SECOND FLOOR ELECTRICAL PLANE113 - OVERALL THIRD FLOOR ELECTRICAL PLANE114 - OVERALL FOURTH FLOOR ELECTRICAL PLANE115 - OVERALL ROOF ELECTRICAL PLANE211 - BUILDING ELECTRICAL SCHEDULES & DETAILSFull CDRG000 - COVER SHEETG001 - SHEET INDEXG002 - SITE PLANM001 - MECHANICAL NOTES & SCHEDULESM100 - LEVEL 01 - MECHANICALM101 - LEVEL 02 - MECHANICALM102 - LEVEL 03 - MECHANICALM103 - LEVEL 04 - MECHANICALM104 - ROOF - MECHANICALM500 - MECHANICAL DETAILSM501 - MECHANICAL DETAILSMagnolia LP stamped approvedP100 - PLUMBING NOTES & SCHEDULESP100-A - BLDG 1, 2, 4, 5 & 6 FOUNDATION - SANITARY & STORMP100-B - BUILDING 3 FOUNDATION - SANITARY & STORMP101 - LEVEL 01 - SANITARY & STORMP102 - LEVEL 02 - SANITARY & STORMP103 - LEVEL 03 - SANITARY & STORMP104 - LEVEL 04 - SANITARY & STORMP105 - ROOF - SANITARY & STORMP300 - FOUNDATION - WATER & GASP301 - LEVEL 01 - WATER & GASP302 - LEVEL 02 - WATER & GASP303 - LEVEL 03 - WATER & GASP304 - LEVEL 04 - WATER & GASP305 - ROOF - WATER & GASP400 - SANITARY ISOMETRICP401 - STORM ISOMETRICP402 - WATER & GAS ISOMETRICP403 - WATER ENLARGED VIEWSP500 - PLUMBING DETAILS - DWVP501 - PLUMBING DETAILS - WATER & GASProjectFlow - Changemarks - Studio M ResponsesSW-2021-00021 Magnolia Condominiums Phase 1