Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
Search
My WebLink
About
0-Taco Bell - 08.06.2021 - T1.0 Title Sheet
0-Taco Bell - 08.06.2021 - T2.0 Fire-Life Safety Plan
1-Taco Bell - 08.06.2021 - D1.0 Demo Floor Plan
1-Taco Bell - 08.06.2021 - D1.1 Demo Clg Plan
2-Taco Bel - 08.06.2021 - A0.2 Site Details
2-Taco Bell - 08.06.2021 - A0.0 Site Plan
2-Taco Bell - 08.06.2021 - A0.1 Site Details
3-Taco Bell - 08.06.2021 - A1.0 Floor Plan
3-Taco Bell - 08.06.2021 - A1.1 Door-Wdw Schedules
3-Taco Bell - 08.06.2021 - A2.0 Seating-Equip Plan
3-Taco Bell - 08.06.2021 - A2.1 Equip Schedule
3-Taco Bell - 08.06.2021 - A3.0 Roof Plan
3-Taco Bell - 08.06.2021 - A4.0 Ext Elevations
3-Taco Bell - 08.06.2021 - A4.1 Ext Elevations
3-Taco Bell - 08.06.2021 - A6.0 Details-Roof
3-Taco Bell - 08.06.2021 - A6.1 Details-Doors-Wdws
3-Taco Bell - 08.06.2021 - A6.3 Finish Details
3-Taco Bell - 08.06.2021 - A6.4 Ceiling Details
3-Taco Bell - 08.06.2021 - A7.0 Finish Floor Plan
3-Taco Bell - 08.06.2021 - A7.1 Ceiling Plan
3-Taco Bell - 08.06.2021 - A7.2 Finish Schedule
3-Taco Bell - 08.06.2021 - A8.0 Int Elevations-Dining
3-Taco Bell - 08.06.2021 - A8.1 Enlarged Plan-Elevations
3-Taco Bell - 08.06.2021 - A8.2 Int Elevations-Kitchen
3-Taco Bell - 08.06.2021 - A8.3 Int Elevations-Kitchen
4-Taco Bell - 08.06.2021 - M1.0 Mechanical Schedule
4-Taco Bell - 08.06.2021 - M2.0 Duct-Diffuser Plan
4-Taco Bell - 08.06.2021 - M2.1 Mechanical Roof Plan
4-Taco Bell - 08.06.2021 - M3.0 Mechanical Details
5-Taco Bell - 08.06.2021 - P1.0 Plumbing Schedules
5-Taco Bell - 08.06.2021 - P2.0 Waste-Vent Plan
5-Taco Bell - 08.06.2021 - P3.0 Water-Gas Plan
5-Taco Bell - 08.06.2021 - P4.0 Plumbing Details
6-Taco Bell - 08.06.2021 - E2.0 Riser Diagram and Legend
6-Taco Bell - 08.06.2021 - E2.1 Panel Schedules and Load Summary
6-Taco Bell - 08.06.2021 - E2.2 Electrical Schedules
6-Taco Bell - 08.06.2021 - E3.0 Floor Power Plan
6-Taco Bell - 08.06.2021 - E3.1 Enlarged Power Plan-Details
6-Taco Bell - 08.06.2021 - E3.2 Roof Power Plan
6-Taco Bell - 08.06.2021 - E4.0 Lighting Plan and Schedules
6-Taco Bell - 08.06.2021 - E5.0 Communications Plan
6-Taco Bell - 08.06.2021 - E6.0 Electrical Details
6-Taco Bell - 08.06.2021 - E6.1 Electrical Details
6-Taco Bell - 08.06.2021 - E7.0 Electrical Details
COMCHECK.pdf-ss
Taco Bell Carmel, IN - Permit-Bid - 08.06.2021