Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
Search
My WebLink
About
0000 - Cover Sheet
A101 - Level 1 Floor Plan
A102 - Level 2 Floor Plan
A103 - Level 3 Floor Plan
A104 - Level 4 Floor Plan
A201 - Elevations
A202 - Elevations
A301 - Stair Tower Sections
A302 - Stair Tower Sections
A303 - Wall Sections
A304 - Wall Sections
A305 - Sign Details
A401 - Southwest Stair Tower Plans
A402 - Northeast Stair Tower Plans
A403 - Dimensioned Plan South - Level 1
A404 - Dimensioned Plan North - Level 1
A405 - Dimensioned Plan South - Level 2
A406 - Dimensioned Plan North - Level 2
A407 - Dimensioned Plan South - Level 3
A408 - Dimensioned Plan North - Level 3
A601 - Schedules
A602 - Fence Elevations
A603 - Door Details
A604 - Window Details
E001 - Symbols and Abbreviations
E002 - Photometric Plan
E101 - Electrical Site Plan
E201 - Level 1 Electrical Plans
E202 - Level 2 Electrical Plans
E203 - Level 3 Electrical Plans
E204 - Level 4 Electrical Plans
E205 - Roof Level Electrical Plans
E401 - Enlarged Plans
E501 - One Line Diagram
E601 - Schedules
E701 - Details
G001 - Life Safety Plans
M001 - Mechanical General
M100 - Overall Mechanical Floor Plans
M101 - Overall Mechanical Floor Plans
M500 - Mechanical Schedules and Details
P000 - Plumbing Symbols and Abbreviations
P100 - Foundation and First Floor Plumbing Plan
P101 - Second and Third Floor Plumbing Plan
P500 - Plumbing Schedules and Details
S000 - General Notes
S001 - Typical Section and Details
S101 - Foundation Plan and Level 1 Floor Plan
S102 - Level 2 Plans
S103 - Level 3 Plans
S202 - Ramp Section and Cross Sections
S401 - Southwest Stair Tower Framing Plans
S402 - Northeast Stair Tower Framing Plans
S403 - Stair Tower Framing Details
S404 - Stair Tower Framing Details
S501 - Foundation Details
S502 - Details
S601 - Column Schedule and Details
S602 - Post-Tensioned Slab Schedule and Details
S603 - Post-Tensioned Slab Schedule and Details
S604 - Post-Tensioned Beam Details