Loading...
HomeSearchMy WebLinkAboutA010.0 - HAM 37 - 10 Roof 9.13.21A010.1 - HAM 37 - 1 Elevation Front & Rear 9.13.21A010.2 - HAM 37 - 2 Elevation Left & Right 9.13.21C010.0 - HAM 37 - Stamped Truss DrawingsC010.1 - HAM 37 - TriCo Sewer Permit JG37C010.2 - HAM 37 - TSI APPROVED (AS DESIGNED)E100.0 - HAM 37 - 7 Electrical First Floor 9.13.21E200.0 - HAM 37 - 8 Electrical Second Floor 9.13.21E300.0 - HAM 37 - 9 Electrical Sun Rm Terrace 9.13.21GN010.0 - HAM 37 - Full Set 9.13.21GN010.1 - HAM 37 - ARB APPROVED Final ReviewGN010.2 - HAM 37 - ARB HOA letter of approvalS001.0 - HAM 37 - 3 Foundation 9.13.21S100.0 - HAM 37 - 4 Floor Plan First Floor 9.13.21S200.0 - HAM 37 - 5 Floor Plan Second Floor 9.13.21S300.0 - HAM 37 - 6 Floor Plan Sun Rm Terrace 9.13.21SPP010.1 - HAM 37 PLOT PLANSPP010.2 - HAM 37 - TriCo Plot Plan JG37SPP010.3 - HAM 37 - ARB APPROVED Plot Plan