Loading...
HomeSearchMy WebLinkAboutA010.0 ELEVATIONS A-1 Revised 2021-2-7E001.0 Electrical Basement Revised 2-2-22E100.0 Electrical First floor Revised 2-2-22E200.0 Electrical Second floor Revised 2-2-22Energy Audit Cerrificate 2022-01-27HOA Final Review (2) Plan ApprovalHOA letter of approval (2)S001.0 BASEMENT CONSTRUCTION A-2 - 2021-12-18S100.0 MAIN FLOOR CONSTRUCTION A-3 - 2021-12-18S200.0 SECOND FLOOR CONSTRUCTION A-4 - 2021-12-18SPP010.0 PLOT PLAN PG1 1-25-22 (2)SPP010.1 PLOT PLAN PG2 1-25-22 (1)TRICO SEWER PERMIT 2022-01-26