Loading...
HomeSearchMy WebLinkAboutA10 Proposed 2nd Floor DimensionsA11 Foundation StructuralA12 1st and 2nd Floor StructuralA5 Proposed Foundation PlanA6 Proposed Foundation PlanA7 Proposed 1st Floor PlanA8 Proposed 1st Floor DimensionsA9 Proposed 2nd Floor PlanC010.0E001.0E002.0E100.0E101.0E200.0E201.0Elctrical General NotesElectrical KeyElectrical Oneline Riser and DiagramElectrical SchematicsGeneral Electrical SpecificationsGN010.0Grease InceptorKitchen Equipment for MaplesM000.1 (description key)M000.2 (description key)M000.3 (description key)M000.4 (mechanical schedule)M001.0M100.0M200.0Maples 1000 gallon GCD changeoutMaples CD StampedMaples Hood SpecsMaples State Structural ReleaseNorth End Maple House LP stamped approvedP000.1 (Plumbing key)P000.2 (Plumbing Key pg 2)P001.0P100.0P200.0Plumbing DetailsPlumbing IsometricsPlumbing ScheduleS101 Foundation PlanS102 1st and 2nd Framing PlanS103 Wall Sections and DetailsSPP010.0Stamped TrussesT1.2 Cover SheetTrudoor TDE-2000R Series Rim Exit Device Cutsheet