Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
Search
My WebLink
About
AD101 DEMOLITION ARCHITECTURAL PLANS
AD102 DEMOLITION REFLECTED CEILING PLANS
AE001 Architectual Symbols and Abbreviations
AE002 Wall Types
AE100 THIRD FLOOR PARTIAL OVERALL ARCHITECTURAL PLAN
AE101 THIRD FLOOR PLAN & REFLECTED CEILING PLAN
AE102 FOURTH FLOOR OVERALL ARCHITECTURAL PLAN
AE103 FOURTH FLOOR REFLECTED CEILING PLAN
AE601 DOOR WINDOW SCHEDULES & DETAILS
AI101 THIRD & FOURTH FLOOR INTERIOR FINISH PLANS
AI201 INTERIOR FINISHES ELEVATIONS AND ENLARGED PLANS
AI202 INTERIOR FINISHES ELEVATIONS AND ENLARGED PLANS
AI501 INTERIOR FINISHES DETAILS
AI502 CASEWORK DETAILS
AI601 FINISHES SCHEDULE
Architectural
Construction Design Release 445534 - 5-9-24
E001 ELECTRICAL LEGENDS
E101 LEVEL 3 ELECTRICAL
E102 LEVEL 4 ELECTRICAL
ED101 ELECTRICAL DEMOLITION
IUH North Hospital - LDRP Specifications - 4-11-24
M001 MECHANICAL LEGENDS
M101 MECHANICAL DEMOLITION
M203 LEVEL 3 MECHANICAL
M204 LEVEL 4 MECHANICAL
M601 MECHANICAL SCHEDULES
M901 MECHANICAL CONTROLS
NFPA 101 LIFE SAFETY PLANS
NFPA 101 LIFE SAFETY PLANS 2
NFPA EXIT ANALYSIS
NFPA EXIT ANALYSIS 2
P001 PLUMBING LEGENDS
P101 SECOND FLOOR PLUMBING
P102 THIRD FLOOR PLUMBING
P103 FOURTH FLOOR PLUMBING
P202 THIRD FLOOR MED GAS
P300 SANITARY WASTE DIAGRAM
P500 PLUMBING SCHEDULES
PD101 PLUMBING DEMOLITION
Sheets_ GC101 - THIRD FLOOR INFECTION CONTROL PLAN
Sheets_ GC102 - FOURTH FLOOR INFECTION CONTROL & PHASING PLANS
Sheets_ GI101 - LIFE SAFETY PLAN