Loading...
HomeSearchMy WebLinkAbout220120.03 CHS GAC - CDR Fully Executed 4363083d view of screen wallsBZA Letter of Grant 3-28-23CHS Stadium Buildings LP stamped approvedPage-10-GD1.0-OVERALL SITE DEMOLITION PLANPage-11-GD1.3-DEMOLITION PLAN NORTHPage-12-GD1.5-DEMOLITION PLAN NORTHEASTPage-13-G1.0-SITE PLANPage-14-G1.3-SITE PLAN NORTHPage-15-G1.5-SITE PLAN NORTHEASTPage-16-G2.0-GRADING AND DRAINAGE PLANSPage-17-G2.3-GRADING PLAN NORTHPage-18-G2.5-GRADING PLAN NORTHEASTPage-19-G3.0-EROSION CONTROL PLANSPage-1-CO1-COVER SHEETPage-20-G3.3-EROSION CONTROL PLAN NORTHPage-21-G3.5-EROSION CONTROL PLAN NORTHEASTPage-22-G3.6-SWPP PLANPage-23-G3.7-EROSION CONTROL DETAILSPage-24-G4.1-SITE DETAILSPage-25-G4.2-SITE DETAILSPage-26-G4.3-SITE DETAILSPage-27-G4.4-SITE DETAILSPage-28-G5.2-ENLARGED SITE PLAN NORTHPage-29-SU1.0-SITE UTILITY PLANPage-2-INDEX-ABBREVIATIONS AND CODE PLANPage-30-SU1.3-SITE UTILITY PLAN NORTHPage-31-SU1.5-SITE UTILITY PLAN NORTHEASTPage-32-SU2.1-SITE UTILITY DETAILSPage-33-SU2.2-SITE UTILITY DETAILSPage-34-SU2.3-SITE UTILITY DETAILSPage-35-SU2.4-SITE UTILITY DETAILSPage-36-SU3.1-STORM PLAN PROFILESPage-37-SU3.2-STORM PLAN PROFILESPage-38-SU3.3-STORM PLAN PROFILESPage-39-L1.0-OVERALL LANDSCAPE PLANPage-3-TOPO-1-TOPOGRAPHIC SURVEYPage-40-L1.3-LANDSCAPE PLAN NORTHPage-41-L1.5-LANDSCAPE PLAN NORTHEASTPage-42-L2.0-LANDSCAPE DETAILSPage-43-S0.01-GENERAL NOTESPage-44-S1.01-FOUNDATION PLANPage-45-S1.02-FIRST FLOOR SLAB AND MASONRY PLANPage-46-S3.01-FOUNDATION DETAILSPage-47-S3.02-FOUNDATION DETAILSPage-48-S3.03-FOUNDATION DETAILSPage-49-S4.01-MASONRY DETAILSPage-4-TOPO-2-TOPOGRAPHIC SURVEYPage-50-S4.02-MASONRY DETAILSPage-51-S4.03-MASONRY DETAILSPage-52-S5.01-FRAMING ELEVATION AND DETAILSPage-53-A1.01-FIRST FLOOR OVERALL PLANPage-54-A1.02-ENLARGED PLANSPage-55-A1.03-ENLARGED PLANS AND DETAILSPage-56-A2.01-ROOF PLANPage-57-A3.01-BUILDING ELEVATIONSPage-58-A4.01-BUILDING SECTIONSPage-59-A5.01-WALL SECTIONSPage-5-TOPO-3-TOPOGRAPHIC SURVEYPage-60-A5.02-SECTIONS & DETAILSPage-61-A6.01-DOOR FRAMES SCHEDULE & DETAILSPage-62-A7.01-FIRST FLOOR EQUIPMENT PLANPage-63-A7.02-EQUIPMENT ELEVATIONS & DETAILSPage-64-A8.01-FIRST FLOOR FINISH PLANPage-65-A8.02-FIELD LAYOUT & FLOORING DETAILSPage-66-A8.03-INTERIOR ELEVATIONSPage-67-A8S.01-LIST OF FINISHESPage-68-A9.01-REFLECTED CEILING PLANPage-69-PFP.01-FIRST FLOOR FIRE PROTECTION PLANSPage-6-TOPO-4-TOPOGRAPHIC SURVEYPage-70-P1.01-SYMBOLS & ABREVIATIONSPage-71-P2.00-OVERALL FOUNDATION PLUMBING PLANPage-72-P2.01-FOUNDATION PLUMBING PLANPage-73-P2.02-OVERALL FIRST FLOOR PLUMBING PLANPage-74-P3.01-PLUMBING SCHEDULES & DETAILSPage-75-P3.02-PLUMBING ISOMETRICSPage-76-P4.01-ENLARGED PLUMBING PLANSPage-77-M1.01-SYMBOLS & ABBREVIATIONSPage-78-M2.01-FIRST FLOOR MECHANICAL PLANPage-79-M5.01-MECHANICAL SCHEDULESPage-7-TOPO-5-TOPOGRAPHIC SURVEYPage-80-M5.02-MECHANICAL DETAILSPage-81-E1.1-ELECTRICAL SYMBOL LEGENDPage-82-E1.2-ELECTRICAL DETAILS & LUMINAIRE SCHEDULEPage-83-E2.1-SITE ELECTRICAL PLANPage-84-E2.2-SITE TECHNOLOGY PLANPage-85-E3.01-FIRST FLOOR TECHNOLOGY ROUGH-IN PLANPage-86-E3.17-TECHNOLOGY ROUGH-IN DETAILSPage-87-E3.18-TECHNOLOGY ROUGH-IN DETAILSPage-88-E4.1-LIGHTING PLANPage-89-E5.1-POWER PLANPage-8-TOPO-6-TOPOGRAPHIC SURVEYPage-90-E6.1-FIRE ALARM PLANPage-91-E7.1-RISER DIAGRAM & SCHEDULESPage-92-T1.01-TECHNOLOGY DETAILSPage-93-T1.02-TECHNOLOGY DETAILSPage-94-T3.01-FIRST FLOOR TECHNOLOGY PLANPage-9-GD0.1-GENERAL NOTES