Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
Search
My WebLink
About
220120.03 CHS GAC - CDR Fully Executed 436308
3d view of screen walls
BZA Letter of Grant 3-28-23
CHS Stadium Buildings LP stamped approved
Page-10-GD1.0-OVERALL SITE DEMOLITION PLAN
Page-11-GD1.3-DEMOLITION PLAN NORTH
Page-12-GD1.5-DEMOLITION PLAN NORTHEAST
Page-13-G1.0-SITE PLAN
Page-14-G1.3-SITE PLAN NORTH
Page-15-G1.5-SITE PLAN NORTHEAST
Page-16-G2.0-GRADING AND DRAINAGE PLANS
Page-17-G2.3-GRADING PLAN NORTH
Page-18-G2.5-GRADING PLAN NORTHEAST
Page-19-G3.0-EROSION CONTROL PLANS
Page-1-CO1-COVER SHEET
Page-20-G3.3-EROSION CONTROL PLAN NORTH
Page-21-G3.5-EROSION CONTROL PLAN NORTHEAST
Page-22-G3.6-SWPP PLAN
Page-23-G3.7-EROSION CONTROL DETAILS
Page-24-G4.1-SITE DETAILS
Page-25-G4.2-SITE DETAILS
Page-26-G4.3-SITE DETAILS
Page-27-G4.4-SITE DETAILS
Page-28-G5.2-ENLARGED SITE PLAN NORTH
Page-29-SU1.0-SITE UTILITY PLAN
Page-2-INDEX-ABBREVIATIONS AND CODE PLAN
Page-30-SU1.3-SITE UTILITY PLAN NORTH
Page-31-SU1.5-SITE UTILITY PLAN NORTHEAST
Page-32-SU2.1-SITE UTILITY DETAILS
Page-33-SU2.2-SITE UTILITY DETAILS
Page-34-SU2.3-SITE UTILITY DETAILS
Page-35-SU2.4-SITE UTILITY DETAILS
Page-36-SU3.1-STORM PLAN PROFILES
Page-37-SU3.2-STORM PLAN PROFILES
Page-38-SU3.3-STORM PLAN PROFILES
Page-39-L1.0-OVERALL LANDSCAPE PLAN
Page-3-TOPO-1-TOPOGRAPHIC SURVEY
Page-40-L1.3-LANDSCAPE PLAN NORTH
Page-41-L1.5-LANDSCAPE PLAN NORTHEAST
Page-42-L2.0-LANDSCAPE DETAILS
Page-43-S0.01-GENERAL NOTES
Page-44-S1.01-FOUNDATION PLAN
Page-45-S1.02-FIRST FLOOR SLAB AND MASONRY PLAN
Page-46-S3.01-FOUNDATION DETAILS
Page-47-S3.02-FOUNDATION DETAILS
Page-48-S3.03-FOUNDATION DETAILS
Page-49-S4.01-MASONRY DETAILS
Page-4-TOPO-2-TOPOGRAPHIC SURVEY
Page-50-S4.02-MASONRY DETAILS
Page-51-S4.03-MASONRY DETAILS
Page-52-S5.01-FRAMING ELEVATION AND DETAILS
Page-53-A1.01-FIRST FLOOR OVERALL PLAN
Page-54-A1.02-ENLARGED PLANS
Page-55-A1.03-ENLARGED PLANS AND DETAILS
Page-56-A2.01-ROOF PLAN
Page-57-A3.01-BUILDING ELEVATIONS
Page-58-A4.01-BUILDING SECTIONS
Page-59-A5.01-WALL SECTIONS
Page-5-TOPO-3-TOPOGRAPHIC SURVEY
Page-60-A5.02-SECTIONS & DETAILS
Page-61-A6.01-DOOR FRAMES SCHEDULE & DETAILS
Page-62-A7.01-FIRST FLOOR EQUIPMENT PLAN
Page-63-A7.02-EQUIPMENT ELEVATIONS & DETAILS
Page-64-A8.01-FIRST FLOOR FINISH PLAN
Page-65-A8.02-FIELD LAYOUT & FLOORING DETAILS
Page-66-A8.03-INTERIOR ELEVATIONS
Page-67-A8S.01-LIST OF FINISHES
Page-68-A9.01-REFLECTED CEILING PLAN
Page-69-PFP.01-FIRST FLOOR FIRE PROTECTION PLANS
Page-6-TOPO-4-TOPOGRAPHIC SURVEY
Page-70-P1.01-SYMBOLS & ABREVIATIONS
Page-71-P2.00-OVERALL FOUNDATION PLUMBING PLAN
Page-72-P2.01-FOUNDATION PLUMBING PLAN
Page-73-P2.02-OVERALL FIRST FLOOR PLUMBING PLAN
Page-74-P3.01-PLUMBING SCHEDULES & DETAILS
Page-75-P3.02-PLUMBING ISOMETRICS
Page-76-P4.01-ENLARGED PLUMBING PLANS
Page-77-M1.01-SYMBOLS & ABBREVIATIONS
Page-78-M2.01-FIRST FLOOR MECHANICAL PLAN
Page-79-M5.01-MECHANICAL SCHEDULES
Page-7-TOPO-5-TOPOGRAPHIC SURVEY
Page-80-M5.02-MECHANICAL DETAILS
Page-81-E1.1-ELECTRICAL SYMBOL LEGEND
Page-82-E1.2-ELECTRICAL DETAILS & LUMINAIRE SCHEDULE
Page-83-E2.1-SITE ELECTRICAL PLAN
Page-84-E2.2-SITE TECHNOLOGY PLAN
Page-85-E3.01-FIRST FLOOR TECHNOLOGY ROUGH-IN PLAN
Page-86-E3.17-TECHNOLOGY ROUGH-IN DETAILS
Page-87-E3.18-TECHNOLOGY ROUGH-IN DETAILS
Page-88-E4.1-LIGHTING PLAN
Page-89-E5.1-POWER PLAN
Page-8-TOPO-6-TOPOGRAPHIC SURVEY
Page-90-E6.1-FIRE ALARM PLAN
Page-91-E7.1-RISER DIAGRAM & SCHEDULES
Page-92-T1.01-TECHNOLOGY DETAILS
Page-93-T1.02-TECHNOLOGY DETAILS
Page-94-T3.01-FIRST FLOOR TECHNOLOGY PLAN
Page-9-GD0.1-GENERAL NOTES