Loading...
HomeSearchMy WebLinkAboutLarge formatRelated: 22-91 DP/ADLS, 75-93, 45-96 bank, 39-01 gas07-404_L10107-404_L102Aerial Photo with Site OverlayApplicationBike RackBuilding elevationsBuilding Renderingcarmel drive retail ELEVS-7carmel drive retail plan-7Colored Landscape PlanCorrespondenceCorrespondence - TACCorrespondence (2)Dept Report 11-20-07Dept Report 11-29-07Dept Report 12-18-07Development Plan 110607Development Plan (full engineering)DP & Landscape Plan 09-28-07DP & Landscape Plan 09-28-07 (2)Drainage CalculationsElevation & Landscaping commentsEnlarged view of Photometric PlanFindings of FactFloor planLetter of GrantLightingMinutes PC 11-20-07Minutes PC 12-18-07Minutes SpecStdy 11-29-07Minutes TAC 10-17-07North & South Elevations 11-29-07Overall Meijer Site PlanPacket 11-20-07Packet 12-18-07Parking ExhibitParking Lot Fixture SpecificationsPlan Commission Information Booklet 11-20-07.docPublic NoticeReceiptSidewalk RevisionSign CriteriaSign Criteria - revisedSite Lighting - Photometric PlanSite.AerialTER001.C1.0.DPTER001.C4.0.ECPTER001.C8.0.SLPUplighting Specificationsv3 Carmel Drive Retail Sign Criteria.doc (2)v3 Carmel Drive Retail Sign Criteria.doc (2)(1)Wall lighting fixtuire specificationsWest and South Bldg Elev - glass calculationsZoup! Outdoor Seating approval