HomeMy WebLinkAbout05110126-State ReleaseELECTRONICALLY FILE YOUR PROJECT WiTH STATE OF INDU~A AT
eflle24-7~dhs.stete.ln.us, Or VISIT OUR WEB SITE AT www.in.govldhs/osbc
Repo~ Pdnted on: October 21, 2005
F
SUPPORT HOOSIER SAFETY
Release date
10/21/05
pro~ect atone
HEATHER KNOLL
50 E 91ST ST STE 207
INDIANAPOLIS IN 46240
:ax & e~tnail: 3178446552, agdarch~aol.~al
he F'~~n subject ~, but not necessary limited to, the conditions
isted below. THIS tS NOT A BUILDING required Iocel permits and I.~e~ses must be obtained ~ to beginnimj construction work. All
construction work must be in full compliance with all appllceble State rules. Any changes in the released plans and/or spe~caEor~ must ~e filed with
and re~ by this Office before any work s altered. Tiffs raleaea may be suspended or revoked if it is determined to be issued in em3r, in violation
of any rules 0ftbe Commission or if it is based on incorrect or insufficient iofom~aEon. This ralease shall expire by limitation, and become null and
void if the work authorized is not commenced within o~e (1) year from the above date.
CONDITIONS:
Note :(AIA & Al B): in accordance with the affidavit sworn under penalties of perjury in the application for construction design release the plans
and specirmatlons fl~d in conjunction with this project shall comply with all of the applicable roles and ~aws of Fire Prevention and Building Safety
Commission. Providing false i~ormation consiitotea an act of perju,'y, which is a Class D felony panishab!e by a pr~on te~m and a fine up to $10,000.
In accordance with Sec~on 19 of the General Administrative Rules (675 lAC 12-6-19) a complete set of plans and specificaEons that conform
e~acUy to the design thet was released by the office of the state building commissioner shall be maintained on the const~ucEon jobsite as well as a
copy of the design ralease.
9S213B
9S220H
The deck around the pool shall be of an impen/ious matedal and of a non-slip design in accordance
with Rule 2,Section 13(b), ISPC (675 lAC 20-2-13).
Main drains shal be designed and installed in accordance with Rule 2, Section 20(h), ISPC (675
lAC 20-2-20).
be discharged into an acceotable sewage system in accordance with Rule 2.
9S221
and shall be designed and constructed in
9S221A
9S227E
lAC 20-2-27),
lAC 20-2-21).
the pool site in
Page 1/2
ELECTRONICALLY FILE YOUR PROJECT wrrH STATE OF INDIANA AT
efile24-7~dhs.state.imus, Or VISIT OUR WEB SITE AT ww~.in.govldhs/osbc
DEPT OF COMMUNITY SERVICE
JIM BLANCHARD
SQUARE
ZIP ~
Page 2/2