HomeMy WebLinkAboutMemorandum of Meeting 9-10-05
f,
Forester is in discussion with the Highway Dept. regarding one issue; a reply should be forthco~ng
from the Surveyor's Office, and the petitioner is in the process of submitting bond applications tol the
Highway Department.
The east elevation of the building will remain intact as will the south elevation. The north elevatiion to
the building will be covered by the additions being proposed to the project. The west elevation shows
the addition to the building; the addition is 7600 square feet, two stories. The north elevation is a,
mirror image of the south elevation of the existing building. The addition will consist of the sam~
materials and structure as the existing building-a steel frame structure, concrete, four floors, and
stone masonry on the exterior. The north elevation will primarily be stone and glass in glazing, just
as the south elevation is of the existing building.
I
The only signage being added is the name "Weihe Engineers." The address, "10505" already exihts
and will remain.
The exterior lighting photometries were included in the informational packets as well as the exteJor
lighting cut sheets.
I
The landscape plan was submitted to the City Urban Forester and at this time, it has been approvJd.
Members of the public were invited to speak in favor of or opposition to the petition; no one app~ared
and the public hearing was closed. I
I
I
Department Report, Matt Griffin. There are no additional comments at this time. The Departme~t is
recommending this item be forwarded to the October Committee for further discussion.
I
I
Mark Rattermann noted that currently there is parking on the gravel on the lot just north of at this I site.
Does Weihe own the parcel to the north and is it included with the subject parcel?
Mark Swanson responded that the parcel to the north is actually the location of the proposed addition.
Additional parking will be created to the east of the building. The Ordinance requires one space ~er
1,000 square feet; however, a total of69 spaces-40 are proposed with the addition and there arel29
existing spaces. J'
Docket No. 0508 0006 DP/ADLS, Home Place Second, Lots 256-258 & 247-248 (Weihe
Engineers) was forwarded to the Special Studies Committee for further review on Tuesday, Octber
4, 2005 at 6:00 PM in the Caucus Rooms of City Hall.
2H. Docket Nos. 05080009 SP & 05080010 DP: Carmel Science & Tech Park, blkl7
The applicant seeks approval for a development plan and 5 new lots.
The site is located southeast of Carmel Dr & Adams 8t and is zoned M-
3/Manufacturing.
Filed by Mike DeBoy of DeBoy land Development Services, Inc.
CONTINUED TO OCTOBER 18, 2005
S :/PlanCommissionlMemorandumofMtg/2005/2005 sept20
2
ONE CI,TIC SQUARE
CARMEL, INDIANA 46032
317/571-2417
3R. Docket No. 05080011 DP/ADLS: Meridian Corporate Plaza
The applicant seeks approval for the site plan and buildings. The site is located at 401
Pennsylvania Pkwy and is zoned B-5 & B-6/Business within the US 31 Overlay.
Filed by Fred Simmons of Simmons Architects, LLC for MCP Partners, LLC.
Taggart Birge, Vice President of Industrial Development for Lauth Property Group appeared before the
Commission representing the applicant. Also in attendance: Fred W. Simmons, architect, 305 East
New York Street, Indianapolis. Development Plan Approval is being requested for the entire parcel,
including Building 2 that is immediately to the north of the existing Lauth Headquarters as well as
Building 3 immediately to the east of the Lauth Headquarters. The property is bounded to the north by
Pennsylvania Parkway, College Avenue to the East, and 1465 to the south.
The petitioner will be appearing before the Board of Zoning Appeals for several variances for this
project.
Both buildings 2 and 3 are contemplated to be 4 stories in height, constructed using architectural pre-
cast, a curtain wall system, and bronze glass. Brick is not being used for this particular development
because the petitioner believes that the architectural pre-cast is better and more timely in the overall
design.
Members of the public were invited to speak in favor of or opposition to the petition; no one appeared
and the public hearing was closed.
Department Comments, Matt Griffin. The Department is recommending that this item be forwarded to
the October 4, 2005 Special Studies Committee.
Dan Dutcher noted the Department's concern regarding the path and where it ties in.
The petitioner said he was in the process of studying the tie-in of the path and would get back with the
Department.
Docket No. 05080011 DP/ADLS, Meridian Corporate Plaza was referred to the Special Studies
Committee for further review on October 4, 2005 at 6:00 PM in the Caucus Rooms of City Hall.
4H. Docket No. 05080016 PP, 05080017 SW, and 05080018 SW: Windsor Grove 2
The applicant seeks to plat 30 lots on 30.056 acres with the following subdivision
waIvers:
Docket No. 05080017 SW: 6.03.19 - Access to Arterials, Parkways, and Collectors
To seek relief from houses fronting collector streets/200 foot required separation from
collector streets.
Docket No. 05080018 SW: 6.03.21- Points of Access
To seek relief from providing 2 points of access into the subdivision.
The site is located at 3105 106ht St. West and is zoned S 1.
Filed by Brian Robinson of Stoeppelwerth and Assoc. for Steve Wilson mc.
S :/PlanCommissionlMemorandumofMtg/2005/2005 sept20
3
ONE CI'TIC SQUARE
CARMEL, INDIANA 46032
317/571-2417
Rebuttal: Mr. Wilson said that when Windsor Grove I was constructed, they were required to provide
a stub street into the vacant land, knowing that it would be developed. The covenants and restrictions
provide for access via a stub street; the existing lake was installed by the previous landowner. The
Carmel Fire Dept. is satisfied with the proposed site plan.
Mr. Wilson stated that there is a drainage utility easement/sewer between two lots that go to Towne
Lake-Clay West District-and Regional Waste-and would hook into Towne Lake. The petitioner
is trying to get an additional easement for construction purposes only to install the sewer. Regarding
the mounding area, Mr. Wilson said he would be glad to look at that. This site is the opposite end of
Annally Downs and should not interfere with the water table.
Department Report, Matt Griffin. The Department is not in support of the relief from the Points of
Access waivers. Both Hamilton County Highway and the Department feel that it makes more sense
to make the connection on 116th across from Kings Mill if at all possible with the lake there; it makes
more sense from a traffic circulation standpoint as well as safety. The Fire Dept. has said they can
fight fires effectively with the configuration as proposed, but their first preference is obviously another
point of access into this site. If the petitioner does not make the connection, they would need to
request another waiver from cul-de-sac length and that would be before the Plan Commission next
month. The Department is also waiti~g to see additional details to be reviewed at the Committee.
The Department is recommending this item be sent to the October 4th Subdivision Committee for
additional comments and discussion.
Dan Dutcher said he expected to see significant landscape and screening along the west and southern
borders for the benefit of the neighbors. It is appropriate to note, for the benefit of the neighbors, that
anytime there is a stub street, it would suggest that additional development will likely occur. Dan
asked that the petitioner comment on the proposed use of greenspace-there is no walking path seen or
any tie between the two sections and greenspace seems to have a very limited, recreational benefit.
Steve Wilson said the lake is existing; there will be a walking path through the common area and an
off-set in the brick wall to the path along 106th Street. The walk will go around one side of the lake
and connect to the walks around the subdivision. Mr. Wilson said he would show the path in detail at
Committee.
Jerry Chomanczuk asked that the water table situation be looked into by the Department.
Docket No. 05080016 PP, and Subdivision Waivers Nos. 05080017 SW and 05080018 SW,
Windsor Grove 2 were forwarded to the Subdivision Committee for further review at 6:00 PM on
October 4, 2005 in the Caucus Rooms of City Hall
5H. Docket No. 05080021 PP Amend: Kendall Wood
The applicant seeks to plat 15 lots on 12.045 acres with the following subdivision
waIvers:
Docket No. 05080022 SW: 6.03.19 - Access to Arterials, Parkways, and Collectors
To seek relief from houses fronting collector streets/200 foot required separation from
S :/PlanCommission/MemorandumofMtg/2005/2005 sept20
5
ONE CI\TIC SQUARE
CAlThffiL, INDIANA 46032
317/571-2417
i
I
I
Steve Wilson, developer, Keystone Way, Carmel appeared before the Commission representing ~he
applicant. The proposal is for a 15-10t subdivision at the northwest corner of West 121 st Street and
Shelborne Road. The site is zoned S-lIResidential.
collector streets.
The site is located at the NW Comer ofW. 12lst St. and Shelborne Rd and is zon d 81
(ROSO).
Filed by Brian Robinson of Stoeppelwerth and Assoc. for Steve Wilson Inc.
The project will consist of mounding along Shelborne Road, a lake along West 121 st Street, a fenlce
along the property line, and additional landscaping.
I
I
The homes in this development will be brick on the first floor, and some two-stories will have brick in
the gable area.
I
Members of the public were invited to speak in favor of or opposition to the petition; the followi~g
appeared:
I
General Public CommentslUnfavorable I
Jeff Kimball, 3940 West 121 st Street objected to granting the waiver from houses fronting colledtor
streets/200-foot required separation from collector streets. There are a number of homes in this ajrea,
private residential development, and there is not a single property that has been granted a waiver to this
Ordinance requirement.
Michael Pritz and wife, Edmay, 3930 West 121 st Street, said he attended the initial hearing for the
Windsor Grove Primary Plat but had not see~ any drawings for the Amendment to the Plat excep~ for
the time they were displayed on the overhead. Mr. Pritz wanted to know how many homes woul4 be
bordering his property, where the retention pond would be located, and how that will affect the
drainage of the water. Mr. Pritz stated that in preparation for the proposed development, he had:
already installed wooden fencing and some of the trees shown on the initial request for the Primaty
Plat were trees that are actually on his property. Mr. Pritz thought the tree situation should be lodked
into by the urban forester. Mr. Pritz was concerned about the impact of the proposed developme I t on
his property and also questioned a pipeline (sewer/water)that was to run from Pulte to the propos d
Kendall Estates.
The public hearing was then closed.
I
Steve Wilson said that the waiver for the 200- foot required separation affects two locations-on~ off
121 st Street west of the pond; the other is off Shelbome Road, south of the entrance to Kendall Wood.
There is one entrance off Shelborne Road-nothing off of 121 st Street. The "pipeline" referred t<) is
probably the sewer line that would handle other future development is coming from Long Branch
Subdivision. The petitioner will be checking with Clay Regional Waste District regarding the layout
of the sewer.
Regarding the fence, there is a wooden fence on the Pritz property; and any fencing on Kendall Wood
S :/PlanCommissionlMemorandumofMtg/2005/2005 sept20
6
ONE CI'TIC SQUARE
CARMEL, INDIANA 46032
317/571-2417
would not come close to the Pritz's property. In regard to the tree line, Mr. Wilson said they would be
saving as many trees as possible.
Department Comments, Matt Griffin. As mentioned earlier, this item originally came before the Plan
Commission for final approval in January, 2005. At that time, there were two commitments made and
those are reflected in the Dept. Report. The Department is recommending this item be forwarded to
the Subdivision Committee.
Dan Dutcher asked for a summary of the differences in the proposed plan and the initial plan. Dan
also asked the petitioner to bring the original design with him to the Committee meeting.
Steve Wilson responded that the option he had on the property to the north expired and another
developer has picked up those six acres. This proposal is a re-design issue, now on 12 acres rather
than 18 acres.
Docket No. 05080021 PP Amend, Kendall Wood was referred to Subdivision Committee for further
review at 6:00 PM on October 4, 2005 in the Caucus Rooms of City Hall.
6H. Docket No. 05080019 DP/ADLS: Boardwalk Shops
The applicant seeks to create 2 structures (1 retail, 1 office) on 2.63 acres.
The site is located at the NE comer of Carmel Dr. and Adams Street and is zoned M3 -
Manufacturing.
Filed by Adam DeHart of Keeler Webb Associates for C and L Management, Inc.
Adam DeHart, Keeler, Webb Associates, 486 Gradle Drive, Carmel appeared before the Commission
representing the applicant. This particular property is in the process of being purchased by C & L
Management. Two structures are proposed on the site-one retail, one office.
Mr. Charles Keyes will be relocating a store to this site that was operated out of the old Q'Malia
Center on Range Line Road. The store will be a "wine center," two stories with a wine-tasting room
upstairs and special, planned events. There will also be a smaller building on the site.
The site has several constraints and the petitioner is trying to work with the overall concept of the City
Center buildings and the Park Place Center buildings.
A single entrance is proposed on Adams Street that will have the same look and feel as the Park Place
Center entrance monument. Likewise, the lighting and signage to the front of the building will be also
be similar. The signage will be on the face of the building for wall tenant signage and the petitioner
will comply with the Carmel Sign Ordinance. The petitioner is also willing to commit to a standard
color and the sign will be internally lit.
There is an existing landscape mound along the north property line that will be supplemented with a
retaining wall constructed of architectural keystone-type blocks. There will also be additional
landscaping on top of the mound to meet the requirements of the City Urban Forester.
S :/PlanCommissionlMemorandumofMtg/2005/2005 sept20
7
ONE CI'lIC SQUARE
CARMEL, INDIANA 46032
317/571-2417
This particular design allows the service areas to be located at the back corner that is out ofview!from
the general public. A small service corridor has been created that is completely hidden from the public
either by the building itself or the retaining wall and landscaping planned on the north property 141e.
The parking lot has been designed in such a manner so that it directly integrates with the office project.
Both the owner of Park Place Center, Frank Cosmos, and this petitioner are looking forward to tllis
project. The petitioner is continuing to work with Mr. Cosmos on minor development details and to
ensure that parking is effective. I
I
I
I
Construction materials include a brick structure with accents of cast stone around the bottom and EFIS
around the top. Also included is the fencing along the top of the fayade that will match the City <Center
building. The building has been designed in such a manner that when looking at the large buildimg,
one would see 5 different building storefronts, even though it is one structure.
Members of the public were invited to speak in favor of or opposition to the petition; no one app~ared
and the public hearing was closed.
Department Comments, Matt Griffin. This is an interesting site that needs extreme detail
consideration. The property is just south of the Old Meridian District and not within the District.'
However, it is adjacent to Arbor Drive that will plug directly into the Grand Boulevard-the larg~
spine through the Old Meridian District. To the north are several thousand residents and apartm~nts
and there will be even more south of the Grand Boulevard in Old Meridian when traditional
townhomes and apartments are built according to the master plan. Special attention should be given as
to how this site ihteracts with the residents to the north so that they are more integrated and pulle~ into
this space. It is also good to note that the southeast property at Adams and Carmel Drive will be
before the Commission in the near future with office and/or retail use. There is an opportunity h@re to
coordinate these two projects and bring a high profile product to the area. This can also act as a I
gateway into the Old Meridian District. I
I
I
i
The Department is recommending that this item be sent to the Special Studies Committee for further
discussion. At the Committee level, we would like to see what potential re-design options there *re for
this site and how the petitioner's needs as well as the City's needs could be accommodated as weill.
The Department would like to see some resolution on this site regarding access points. If the sitel
remains as currently shown, Engineering has some issues with the additional cut on Adams Stree~ and
would prefer to see access at the point of the current curb cut on Adams.
Leo Dierckman commented that there seemed to be a lot going on with the building-too decorative at
the roofline, the multiple colors, awnings, it all adds to make the building look too busy.
I
I
Mark Rattermann was concerned about the building elevation--can't tell the back from front-and
where it lies with Carmel Drive. The building seems very dense and a lot on the site.
Wayne Haney noted that the footprint on the plot plan does not seem to match the elevations.
I
Jerry Chomanczuk commented that the petitioner does not seem to be in step with what the City has
S :/PlanCommissionlMemorandumofMtg/2005/2005 sept20
8
ONE CI'TIC SQUARE
CARMEL, INDIANA 46032
317/571-2417
been doing with its Urban Design and referred to a project at Main and Guilford as an example. As
designed, this building will have very prominent parking in a critical part of Carmel Drive. The
Committee would like to see some additional versions with additional thought given to the placement
of the building.
Kevin Heber thought that perhaps Adams Street should be emphasized more prominently and
emphasis on the pedestrians on the Adams Street side. The parking should be to the rear the strip
should be broken up either into an "L" shape or even two separate structures. Two stories with
apartments on the second floor would be good. The project does need to tie in-physically, logically,
aesthetically~with The Arbors and the Providence apartments. The pond is walled off and' it may be
better to integrate it into a fully-functioning "town."
Docket No. 05080019 DP/ADLS, Boardwalk Shops was forwarded to the Special Studies
Committee for further review at 6:00 PM on October 04, 2005 in the Caucus Rooms of City Hall.
7H. Docket No. 05090001 OA: Parking Ordinance Amendment
The applicant seeks to amend the Zoning Ordinance, Chapter 27: Additional Parking
& Loading Regulations, in order to modify parking standards.
Filed by the Carmel Department of Community Services.
Adrienne Keeling, Department of Community Services. Adrienne explained the proposed
amendments to the Parking Ordinance--one is to the auto parking standards; the other incorporates
bicycle parking standards.
The Amendment introduces and recognizes he need for shared and on-street parking. The existing
Ordinance does recognize shared parking and the Amendment will strengthen and clarify those
standards. A parking dimensions table is being introduced as well as a diagram to match to make it
more clear to developers and anyone using the Ordinance how the standards are applied.
Standard Zoning Waiver language is also being added that will allow a little flexibility with the
parking standards and brining it before this Commission rather than the Board of Zoning Appeals for
more reasonable changes and relaxation of the Ordinance. There is also a parking calculation table
that outlines how many spaces per use. The main point is to re-organize the table so that the uses
listed match the uses listed in the Use Table.
The Bicycle Parking language is completely new.
Members of the public were invited to speak in favor of or opposition to the petition; no one appeared
and the public hearing was closed.
Docket No. 05090001 OA, Parking Ordinance Amendment Referred to Special Studies
Committee for further review at 6:00 PM on October 04, 2005 in the Caucus Rooms of City Hall.
8H. Docket No. 05090002 OA: ROSO Repeal
The applicant seeks to Repeal the Subdivision Control Ordinance, Chapter 7: Open
S :/P lanCommissionlMemorandumofMtg/2 005/2005 sept20
9
ONE CI,TIC SQUARE
CARMEL, INDIANA 46032
317/571-2417
Space Standards for Major Subdivisions (ROSa III), in order to repeal the ROS
subdivision standards.
Filed by the Carmel Department of Community Services.
I
Adrienne Keeling, Department of Community Services appeared before the Commission represkting
Petitioner. This ROSO Repeal Amendment is being sent to the Commission by the Carmel Cityl
Council due to some concerns with density within the Township. I
I
Through additional discussions, there are some solutions to the concerns expressed by the Coundil
without entirely repealing the Ordinance. Currently, the recommendation is for this item to be
reviewed by the Subdivision Committee.
Members of the public were invited to speak in favor of or opposition to the petition; no one appeared
and the public hearing was closed. I
I
Mark Rattermann commented that an historical analysis was to be made of all of the subdivision~
utilizing ROSO and how those have been platted. Some people were mistaking density/open space
with the types of homes that were being built. 11
Jerry Chomanczuk commented that there is so much more to this Ordinance thanjust density iss. es-
There are FEMA requirements, tree preservation, open space, wellhead protection areas-a
tremendous amount of good things. Jerry Chomanczuk asked that the Committee be aware of those
things and approach this on a sillgular basis. 1
Docket No. 05090002 OA, ROSO Repeal was referred to the Subdivision Committee for furth.r
review on October 04, 2005 at 6:00 PM in the Caucus Rooms of City Hall.
I. Old Business:
11. Docket No. 050300019 PP: West Clay Colony
The applicant seeks to plat 23 lots on 40 acres.
Docket No. 05060054 SW: 6.05.07 Orientation of Home
To allow homes to face internal streets.
The site is located at the NE comer of Hoover Road and W. 116th Street and is ,zoned
S-l (Residential).
Filed by Michael DeBoy.
Michael DeBoy, DeBoy Land Services, 501 South 9th Street, Noblesville appeared before the
Commission representing the applicant. The Primary Plat and Subdivision Waiver were reviewed
by the Subdivision Committee on August 2, 2005 and received a 4-0 positive recommendation!
conditioned upon 5 commitments being made by the petitioner.
Those 5 commitments are as follows: 1) Commitment to a IO-foot multi-use recreational path I along
116th Street and a 6-foot sidewalk and shared bike path along Hoover Road, both to be constructed
when the development is constructed. 2) Approval of the landscape plan by City Urban Forster
S :/PlanCommission/MemorandumofMtg/2005/2005 sept20
10
ONE CI,TIC SQUARE
CARMEL, INDIANA 46032
317/571-2417
Scott Brewer. 3) Review to the Department's satisfaction of elevations for I 16th Street and Hoover
Road. 4) Architectural commitments for the lots that are subject to the Subdivision Waiver request,
including brick wrap, brick chimney chase, and at least 3 backyard trees per lot. 5) Preservation of
the lake in common area number 2.
Scott Brewer, the City Urban Forester, has approved the landscape plan for this Development. At
this time, the petitioner presented elevations of the subdivision from Hoover Road and 116th Street.
Committee Report, Rick Ripma. This item was sent back to Committee on September 6th for
additional review of the landscape plan. The landscaper had failed to submit drawings. All of the
other items as far as the walking paths, etc. were covered in commitments from the petitioner.
Department Report, Matt Griffin. The Department is recommending approval of the Primary Plat
and Waiver Request as forwarded by the Subdivision Committee, subject to the recordation of the
five listed commitments.
Dan Dutcher made formal motion to approve Docket No. 050300019 PP: West Clay Colony, and
Docket No. 05060054 SW, 6.05.07 Orientation of Home, together with the 5 listed commitments
intact, seconded by Rick Ripma, APPROVED 8-0.
21 Docket No. 05060038 PP Amend and 05060039 SP: Little Farms Addition, Lots
31-33 (Replat of)
The applicant seeks approval to replat 9 lots on 2.25 acres:
The site is located at the northwest corner of Ethel Street and West 104th Street.
The site is zoned R-3/Residence within the Home Place Overlay.
Filed by Chris Badger of Badger Engineering & Associates.
Chris Badger, Badger Engineering, 117 West Elm Street, Lebanon, 46052 appeared before the
Commission representing the applicant. The petitioner appeared before the Board of Zoning
Appeals and received approval for a setback variance. As a corollary, the complaint has been
dropped as well.
At the Subdivision Committee meeting on September 6, 2005, the petitioner agreed to three
commitments as follows: 1) All front elevations shall be 50% brick. 2) The elevation along the
east side that faces Ethel Avenue shall be 50% brick exterior. 3) The Subdivision Homeowners are
responsible for the regular upkeep and maintenance of the alley through a budgeted maintenance
agreement that will provide access for fire equipment-the agreement will be a part of the covenants
as well.
The petitioner has agreed to an easement and has also agreed to stay out of the adjacent property as
well. The petitioner will connect to a different drain. All of the improvements will be bonded.
Committee Report, Rick Ripma. The Subdivision Committee had looked at the drainage issue and
they are satisfied with the resolution. The Committee had some issues regarding the pavers because
of the maintenance factor. The petitioner agreed to set up a Homeowners Association or at least a
S :/P lanCommissionlMemorandumofMtg/2 005/2005 sept20
11
ONE CI,TIC SQUARE
CARMEL, INDIANA 46032
317/571-2417
budget to provide for fees to maintain the grass cutting. The Committee voted 4-0 to recommend
approval.
Department Report, Matt Griffin. The Department is recommending approval as forwarded bt the
Subdivision Committee on September 6, subject to the recording of the three commitments as
previously specified. I
Mark Rattermann moved for approval of Docket No. 05060038 PP Amend and 05060039 S1>>,
Little Farms Addition, Lots 31-33 (Replat of) conditioned upon the three commitments as
previously specified, seconded by Rick Ripma, APPROVED 8-0.
31.
I
th I
Docket No. 05060040 Z and 05060041 ADLS: 116 and College PUD I
The applicant seeks to rezone 12.4 acres from R1IResidential and B6/Business ~o
PUD/Planned Unit Development for the purpose of creating a mixed use
development comprised of townhome, retail, and office uses.
The site is located at NE comer of 116th Street and College Ave.
Filed by Timothy Ochs of Ice Miller for Equicor Development Inc.
i
I
I
CONTINUED TO OCTOBER 18, 2005
I
41. Docket No. 05060042 DP Amend/ADLS: Carmel Science & Tech. Park, BI~ 11
The applicant seeks approval for a medical office building. I
The site is located at the SW comer of Carmel Dr. and Guilford Rd. and is zonJd M-
3/Manufacturing. !
Filed by Mary Solada of Bingham McHale. l'
Mary Solada, attorney with Bingham, McHale appeared before the Commission representing t e
applicant. Also in attendance: Ross Boyer, Bremner Health Care.
i
The proposed medical office building is located at the southwest comer of Carmel Drive and !
Guilford Road and is zoned M-3/Manufacturing. The building is derived from an approval giten
last fall for a site at 106th & Michigan Road. The building proposed for Carmel Drive will virttually
be identical. The building will be approximately 40,000 square feet and multi-tenant. There i$ a
retention pond at the east end of the property. A portion of this parcel at the northwest sectionl will
be set aside for future development by Bremner. J
Whatever access points described this evening will serve the parcel to the northwest. As a pa . of
the'record, the petitioner will not return to ask for a different access. The building has been sl~ghtly
pivoted to the north and northeast. Originally the building was running lengthwise, north to south,
but the slight pivot is good because it better orients the building to the attractiveness of the pond and
to Carmel Drive.
The petitioner is seeking some minor variations from the Sign Ordinance and will be appearint
before the Carmel Board of Zoning Appeals Monday, September 26th.
S :/PlanCommissionlMemorandumofMtg/2005/2005sept20
12
ONE CIVIC SQUARE
CARMEL, INDIANA 46032
317/571-2417
The Special Studies Committee accepted and supported this project, but questioned the access point.
Through an agreement 'with Mike McBride, City Engineer, the petitioner will be granted full access;
the petitioner will then make a contribution to the City for their share of improvements on Guilford
Road that are necessary as a result of all of the new development, approximately $100,000. How
this site lays out has been analyzed by the Engineer's office.
The west end of the site contains a secondary access point that will require an easement across the
property to the west; the access will be right in/right out only onto 122nd Street and is supported by
the Carmel Engineer. The last point is for full access onto Carmel Drive.
A memorandum from the Assistant City Engineer was distributed that described why they are
supporting this curb cut. The parcel to the northwest will utilize this curb cut if so approved. The
request to go forward with a full curb cut is not one taken lightly and it has been thought through
taking into account input received at public hearing and the Committee meeting. The primary tenant
and some of the other tenants at Bremner Health Care really feel it is necessary to have a full cut.
Again, the petitioner is working closely with the Engineer's office regarding the other curb cuts,
particularly the accommodation on Guilford. As to Carmel Drive, the petitioner understands that at
some point in the future, depending on what happens on Carmel Drive in the future, the full access
may be limited to right in/right out and if that is what happens five years from now, we will abide by
that. The City Engineer's Office is supportive of the proposed plan and the petitioner is moving
forward based on traffic counts known today. There is substantial distance between the proposed
cut and Guilford Road and this meets all safety standards and Engineering recommendations.
Again, the petitioner understands that there may be a median installed in the future and if that
occurs, the petitioner will not contest and no suit would be filed if a median were installed.
Special Studies Committee Report, Jerry Chomanczuk: Mary Solada has pretty much summed up
the review by the Committee. The proposed building is a wonderful use and good design-no
argument there. The crux of the matter on this project was access to the site. There are three access
points proposed. The Committee had no problem with the access on 122nd Street or on Guilford;
however, the Committee voted 2-2 no decision. The concern was a full access where people could
cross over and make a left turn. The Committee requested that the City Engineer commit to a full
statement of recommendation as to how to address the access issue. There are no problems with the
Guilford or 122nd Street curb cuts; however, with Carmel Drive, it would seem that the Engineering
Department has a foot in both camps-in other words, allow it but wait and see how things develop
in tIle future and then possibly restrict it.
Department Report, Matt Griffin. As stated several times, the only outstanding issue with this site is
this one access point. A letter was received this afternoon from the Engineering Dept and the
situation was discussed thoroughly with the Dept Director. The Department is defaulting to the
Engineering Dept. TIle letter pretty much states that allowing full access will not do any substantial
damage or danger to this road segment; however, as the parcel develops in the future, Engineering
would certainly consider installing a median at this location and restricting full access when the
situation warrants
S :/PlanCommissionlMemorandumofMtg/2005/2005 sept20
13
ONE CI\TJC SQUARE
CARMEL, INDIANA 46032
317/571-2417
I
Mary Solada reiterated that if a median is proposed, the petitioner will not file suit or claim an~ sort
of taking; the petitioner does have a right to discuss it.
Mark Ratterman made formal motion for approval of Docket No. 05060042 DP Amend/AD~S:
Carmel Science & Tech. Park, Blk 11, seconded by Jerry Chomanczuk. The vote was 6 in favor,
, 2 opposed (Ripma and Torres) MOTION APPROVED.
51. Docket No. 05060043 PP: Laurel Ridge
TIle applicant seeks approval to plat 17 lots on 47.12 acres with the following
Subdivision Waivers:
Docket No. 05060044 SW: 6.03.04 - Connectivity
To seek relief from providing stub streets to adjoining properties.
Docket No. 05060045 SW: 8.09.02 - Alternative Transportation
To seek relief from providing a pedestrian path along Ditch Road.
Docket No. 05060046 SW: 6.03.19 - Access to Arterials, Parkways, and
Collectors
To seek relief from houses fronting collector streets/200 foot required separatioln
from collector streets.
Docket No. 05060047 SW: 6.03.22 - Acceleration/Deceleration, and Passing
Lanes
To seek relief from providing acceleration/deceleration and passing lanes.
Docket No. 05060048 SW: 8.09.02 - Private Streets
To allow the construction of private streets serving the entire subdivision.
Docket No. 05060049 SW: 8.09.02 - Cui de Sac Length
To allow cuI de sacs to exceed 600 feet in length.
Docket No. 05060050 SW: 6.02.01 - Subdivision in Floodway/Plain
To allow subdivision of land within the floodway and floodplain. I
The site is located at the SE corner of Ditch Road and W. 106th Street and is zohed
S 1IResidential.
Filed by Joseph Calderon of JBCl, LLC for JB Cohen
. Joe Calderon, attorney with Bose McKinney & Evans, 600 East 96th Street appeared before th~
Commission representing the applicant. Also in attendance was Jeff Cohen, JB Cohen RealtY,1
Developer.
Mr. Calderon reported that the Subdivision Committee reviewed the Primary Plat for Laurel ~dge
on September 6, 2005. At that time, the accompanying waivers were also reviewed. Two of the
waivers have been eliminated from consideration. As you may recall, this is a very low-density
subdivision located at the southeast corner of 106th Street and Ditch Road-17 lots on 47 acre$.
The petitioner has committed and now shows on the revised drawings that a pedestrian pathway will
be incorporated along the frontage of both 106th Street and Ditch Road. South of the entry poitlt, on
Ditch Road, there will be a 5-foot wide path as opposed to a 10-foot wide path. The petitioneI1 is not
seeking any waiver of alternative transportation-the full 1 0 feet will be installed all the way
S:/PlanCommissionIMemorandumofMtg/2005/2005 sept20
14
ONE CI'TIC SQUARE
CARMEL, INDIANA 46032
317/571-2417
aroundl06th Street and the intersection south to Ditch road and three points. The other items
discussed at length at Committee were the frontage road requirement and setback requirements.
The petitioner's vision is for a heavily landscaped area along the perimeter; there is also a wall
feature with layers of landscaping and very nice, exclusive homes in the background that are set
back to a point where it would avoid the concerns previously voiced regarding the possibility of
exposed vinyl.
The petitioner has agreed to brick or stone or masonry wrap on any of the exterior lots as well as
additional landscaping in the rear or side yards. Building pad locations were also shown on the plat;
these indicate that none of the buildings will be in the floodway or floodplain area. The drainage
has been discussed and concerns have been addressed at the intersection of Ditch Road and 106th
Street. The drainage is being routed internally on the site to the south lake and into the existing
storm infrastructure. The petitioner will actually be red.ucing the amount of flow from the west side
of Ditch Road.
Mr. Calderon reported that the Committee approved all of the waivers and split-vote on the private
streets. The private streets will be built to public standards and specifications. The gate is not a
prominent feature of the subdivision. The gate is set back significantly from the road, well over 100
feet, and it will be landscaped significantly so that passers-by will not notice the gate as a prominent
feature, rather it is a subtle feature. The petitioner has incorporated a full turn-around before
arriving at the gate. Any traffic can safely re-enter onto Ditch Road. Accel and decellanes have
also been added for both approaching and departing traffic from the Subdivision.
The adjoining subdivision to tIle east, Laurelwood, is also a gated community. There is no barrier
between the lots at Laurel Ridge and Laurelwood. Letters of support were submitted to the Plan
Commission from the Laurelwood Homeowners Association.
Subdivision Report, Rick Ripma. Regarding the connectivity, the Committee did not feel that there
was any good area to have the property connect because of the location of the Creek and because
there is no connectivity to Laurelwood. It just did not make a lot of sense to require this community
to connect to anything else.
Regarding access to arterials, parkways and collectors-the Committee felt comfortable with what
was being done. The deceleration lanes have been provided.
The cul-de-sac length was agreeable to the Committee based on the size of the lots.
None of the homes will be in the Floodway/Plain. There is actually a 30 or 40 foot cliff down to the
Creek and the Committee was comfortable with that.
The alternative transportation-the pedestrian paths-everything south of the entryway falls from
the road. The rest of the area will contain the path, as required. The Committee was okay with he
petitioner making a path a little more narrow, perhaps 6 feet. The petitioner agreed to do the path,
S :/PlanCommissionlMemorandumofMtg/2005/2005 sept20
15
ONE CI,TIC SQUARE
CARMEL, INDL'\NA 46032
317/571-2417
but because of the layout of the land, the Committee felt comfortable with the Department wJking
fu~o~. I
I
The real issue on the private streets is whether we want a gated community or not. One thing that
did come out of the discussion is that there sllould be some direction on what it okay with a private
street and gate and what is not. There needs to be something in writing-some sort of guidelim.e on
what can be gated.
The 2-2 vote came down to just the gate.
Department Report, Matt Griffin. The path south of Ditch Road is determined to be 5 feet. Tfue
Department is requesting that the additional path not be installed, the 5-foot width-and they would
put a monetary value on that and make a contribution to the Engineering Department for the general
fund to fund other paths. The private street issue and gate are somewhat connected. The street is
not in the City jurisdiction and Hamilton County Engineering has said they have no problem with it.
Obviously, the only reason for a private street is to put up a gate. Currently, there is no criteria! in the
Ordinance that can guide decisions as to when a gate is appropriate and when it is not. The
Department is researching a set of guidelines for gate guidance; if streets do become public, wJ1at
happens to the gate? At this time, there is no strong aversion to having a gate at this location. i
I
Madeleine Torres asked if any information had been gleaned regarding the pedestrian that wasl along
the front of Laurelwood,
I
Matt Griffin responded that the path had been removed and re-sod. This matter has been discJssed
, with Code Enforcement and it is being worked on.
I
Mark Rattermann said he had a differing opinion regarding private streets. Citizens are really I
paying taxes twice for the maintenance-they are paying into a homeowners association to majintain
the streets, and the gasoline taxes that would normally maintain those streets are not being used
because the County cannot maintain them. It is an option-the developers like it because it gives an
air of prestige to them and allows them to get more money for the lots.
I
I
I
Dan Dutcher presented his views on the gated community and what standards should be used ~n
evaluating a request for a gated community. We are starting from an Ordinance that does not permit
gates, so there should be some kind of foretelling information that a gate would be approved. ~he
question is, what are those compelling circumstances, what are those situations. The only oth~r
single family residential development where a gate has been approved was Pine Creek this last June.
There are differing opinions and some other developments that have gates, notwithstanding
Laurelwood. The final twist is that in the proposed annexation agreement with Clay Township, the
"No Annexation" vote would give every subdivision a one-time opportunity to deal with a reqUest
for a gate.
I
Mark Ratterman commented that there should be a standard on this: maximum number oflotJ,
connectivity, etc., and then maybe the Ordinance needs to be amended to allow these provisio~s.
S:/PlanCommissionlMemorandumofMtg/2005/2005 sept20
16
ONE CIVIC SQUARE
CARMEL, INDIANA 46032
317/571-2417
Matt Griffin responded that the funds received from the State are based upon mile per mile of public
right-of-way that the City is maintaining. Possibly, the City could assess an annual fee for private
streets to offset the difference.
John Molitor commented that the Subdivision Control Ordinance allows two provisions for
regulation. It is a variance type of process through the BZA. Essentially the Ordinance says that the
variance would be granted only when the literal enforcement of the Ordinance would result in an
unnecessary hardship. The burden of proof is on the petitioner to demonstrate the hardship.
Also, if we wanted to put into the Ordinance a particular standard on gates, this could be reviewed
to see if the petitioner meets the option.
John Molitor recommended that the Commission separate the two waivers that are somewhat at
issue before voting on the entire subdivision plat.
Jerry Cllomanczuk said he shared the concerns voiced by Dan Dutcher regarding the gate situation.
The recommendation from Counsel is welcome and viable.
Joe Calderon made the following commitment regarding Doc~et No. 05060045 Subdivision
Waiver, Alternative Transportation: In consideration for waiving the width of the path from the
south entry point to the south property line on Ditch Road, the petitioner will contribute the
difference in the cost between the construction of a full 10- foot wide path and a 5 or 6- foot wide
path to the City of Carmel, Dept of Engineering.
Mark Rattermann moved for approval of Docket No. 05060043 PP, Laurel Ridge and
Subdivision Waivers 05060044, 05060045, 05060046, 05060047, 05060049, and 05060050
(exclusive of Docket No. 05060048 SW, 8.09.02-Private Streets) with commitments as stated,
seconded by Rick Ripma, APPROVED 8-0.
Mark Rattermann moved for approval of Docket No. 05060048 Subdivision Waiver, 8.09.02-
Private Streets for Laurel Ridge, seconded by Madeleine Torres. The vote was 5 in favor, 3
opposed (Chomanczuk, Dutcher, Heber). No Decision Vote.
Note: Docket No. 05060048 SW 8.09.02 Private Streets for Laurel Ridge will remain on the
Agenda and the petitioner will return to the October Plan Commission meeting. No
additional Public Notice Required.
Additional Note: The Department will review currently gated communities to determine if those
Subdivisions were a package with a gate or if the gate was requested as an added feature after initial
approval of the Subdivision.
S :/PlanCommissionIMemorandumofMtg/2005/2005sept20
17
ONE CIVIC SQUARE
CARMEL, INDIANA 46032
317/571-2417
61. Docket No. 05060051 PP: The Retreat of West Clay Primary Plat
The applicant seeks approval of 32 lots on 23.49 acres: I
The site is located near the NE corner of Little Eagle Creek Ave and W. 141st St. and
is zoned S l/Residential
Filed by Jim Shinaver of Nelson and Frankenberger for Centex Homes.
CONTINUED TO OCTOBER 18, 2005
71 Docket No. 05060053 DP: Weston Pointe Retail Center
The applicant seeks approval for multiple commercial/retail buildings.
The site is located at 11055 N. Michigan Rd. and is zoned B-2/Business within lthe
US 421 Overlay.
Filed by Ronald Bell of Williams Realty Group for PL Properties, LLC.
Ronald Bell, Williams Realty Group appeared before the Commission representing the applicant.
The retail center has been approved for a 150,000 square-foot facility; the petitioner is buildin$ an
80,000 square-foot building on the site. There are three out-lots along US 421-the entire project
lies within the US 421 Overlay.
I
I
The applicant is proposing the construction of a 28,OOO-square foot B-shop retail in the center bf
this site; a 7,000 square-foot office building in the northwest quadrant of the site, and a corpo~ate
headquarters building consisting of approximately 28,000 square feet adjacent to Weston Pointe
Drive.
I
Special Studies Committee Report, Jerry Chomanczuk: The Committee reviewed this item and
discussed access points, parking capacities, etc. Due to the lack of information for ADLS review,
that element of the Docket remains at Special Studies Committee for further review. The
Development Plan is a typical type of retail development expected in the Michigan corridor. There
were no major points of conflict seen and no public remonstrance or comments were offered fi10m
the neighbors as has occurred in the past. The Committee would like to see more information for
ADLS review, including the placement of the buildings along Michigan Road to ensure that thp
fa~ade is positioned correctly. The Committee voted 4-0- to forward the Development Plan to ithe
full Commission with a favorable recommendation. I
Department Report, Matt Griffm: The Department has no outstanding comments or concerns bn
this particular project. The petitioner has done "due diligence" in addressing the Department'sl
comments and concerns. The Depatment is recommending approval conditioned upon record~tion
of two specific commitments and also with the understanding that the petitioner will be at the '
October 4, 2005 meeting of the Special Studies Committee for ADLS review and approval.
Mark Rattermann asked about the traffic light on Michigan Road and if they was being suppo~ed,
even though City Council issued a Resolution saying "No more traffic lights on Michigan Road."
I
Matt Griffin responded that the traffic light is within the jurisdiction ofINDOT, and when it is
warranted, it will be installed.
S :/PlanCommission/MemorandumofMtg/2005/2005 sept20
18
ONE CI,TIC SQUARE
CARMEL, INDIANA 46032
317/571-2417
Mike Hollibaugh then addressed the Commission. The traffic light was discussed when the Pittman
Rezone north of this location was approved by the Council. Originally, it wanted to occur at
Bennett Parkway where the existing street and Church are today. The developers in the area could
not get all of the players to agree to that location, so there was a connectivity plan developed with
REI, Browning, Pittman, Christal DeHaan's ground to the south of Pittman's property. INDOT was
consulted and worked with, and the consensus was that this is the one place that a signal would
occur between 116th Street and 106th Street. That was all part of the discussion at the public level,
Plan Commission and Council, approximately 3 years ago. It was all a part of the discussion at the
time of the Pittman rezone where the townhomes are located.
Mark Rattermann said he was still concerned about the number of traffic lights on Michigan Road.
Mr. Sharp would also not be happy with this. Mark Rattermann asked for a commitment from the
Department that additional traffic lights on US 421 would not be supported. Mr. Rattermann was
willing to bend on this one because it sounds like this is THE place for the traffic light. But, Mr.
Rattermann said he would be very upset if there were a proposal for another light 500 feet north of
this one. Perhaps we should make it an Ordinance rather than a Resolution regarding no more
traffic lights on US 421.
Mike Hollibaugh said there was never intent to have more than one signal-that why this plan was
developed. The Thoroughfare Plan shows one point of connectivity between I 16th and 106th Streets
and that is what we are working with. People also have to have a way to get out onto Michigan
Road and there must be a way to control some of the traffic flow.
Mark Rattermann moved for approval of Docket No. 05060053 DP, Weston Pointe Retail Center,
conditioned upon recordation of two commitments aforesaid and final ADLS review and approval at
the October 4, 2005 Committee meeting, seconded by Dan Dutcher, APPROVED 8-0.
J. N~w Rllsin~ss:
1J. Docket No. 05090008 ADLS: Allen Office Building @ Weston Point Retail
Center
The applicant seeks ADLS approval for a 4 tenant office building.
The site is located at 11055 N. Michigan Rd. and is zoned B-2/Business within the
U.S. 421 Overlay.
Filed by Nicolas Quintana of Sebree Architects for Williams Reality Group.
Ken Sebree, Sebree Architects, Avon, Indiana appeared before the Commission representing the
applicant. Gordon Allen, Prudential-Allen Real Estate Group was also in attendance.
The Prudential-Allen Office building sits on a diagonal on the site. The site will be integrated and
engineered within the Williams Realty Group Center. The 4-tenant building on the comer is
thought to be appropriate for offices and complies with the intent of the US 421 Overlay Zone.
At this time, the applicant is requesting approval.
S :/PlanCommissionIMemorandumofMtg/2005/2005 sept20