HomeMy WebLinkAbout05110179-Sq. Ft. k. All sidewalks and driveways
I. Sewer and water lines, septic system, (tanks & filed system) and/or well locations
m. Drainage flow arrows
n. All drainage swales and subsurface facilities (retention / detention areas, etc...)
o. Sump pump -- Show sump pump pit(s) and discharge line locations
p. Geothermal heat pump discharge locations
*NOTE: If land is not within a platted subdivision, a legal description is required,
CARMEL ZONING ORDINANCE Z-289, SECTION 29.04,02 (3): "The Director shall approve or deny the Improvement
Location Permit within five (5) working days of the receipt of the written appliCation form and accompanying
materials, The Improvement Location Permit shall be issued when the proposed structure, improvement, or use and
its location conform in all respects to this ordinance."
IN ADDITION TO THE ABOVE-LISTED SUBMITTAL REQUIREMENTS, THE BUILDING INSPECTOR WILL BE PROVIDED
WITH ANY INFORMATION RELATIVE TO COMMITMENTS MADE IN THE ZONING PROCESS FOR THE PROPERTY
INVOLVED· THIS WOULD INCLUDE ANY PLAN COMMISION, BOARD OF ZONING APPEALS, AND/OR DEPT. OF
COMMUNITY SERVICES ADMINISTRATIVE APPROVALS REQUIRED.
ADDITIONAL INFORMATION MAY BE REQUESTED BY, AND WILL BE PROVIDED TO THE BUILDING INSPECTOR, IF
THE SUBMITTED PLANS ARE NOT OF SUFFICIENT CLARITY OR DETAIL, TO INDICATE THE NATURE AND EXTENT
OFTHE WORK PROPOSED AND TO DETERMINE COMPLIANCE WITH ALL APPLICABLE CODES AND ORDINANCES·
SUBMITTAL OF ADDITIONALLY REC~UESTED/REQUIRED INFORMATION, AFTERTHE INITIAL SUBMI1-FAL, WILL
EXTEND THE TIME IT TAKES COMPLETE THE PERMIT REVIEW.
THE OFFICE OF BUILDING & CODE ENFORCEMENT RECOGNIZES ANY ROOM/AREA DESIGNATED ON
CONSTRUCTION PLANS AS A "BoNus ROOM'" TO BE UN_~.~.~_CCUPIABLE~ SPACE· IF AN AREA SO
LABELEDIS TO BE A FINISHED SPACE, CONSTRUCTION PLANS MUST BE LABELED ACCORDINGLY. IF IT IS
DETERMINED THAT AN UNFINISHED, "BoNUS ROOM" AREA IS TO BECOME A FINISHED AREA ~
ISSUANCE OF THE PER~L~ THE PLANS AND PERMIT RECORDS MUST BE UPDATED AT THE OFFICE OF BUILDING &
CODE ENFORCEMENT.
ALL CONSTRUCT/ON IS SUB3ECT TO I~ELD ZNSPECT/ON~ AND SHOULD NOT BEGZN PRIOR TO THE
XSSUANCE OF THE BUZLDZNG PERMzT. ONCE THE PERMIT IS ISSUED, WORK SHOULD NOT BE POURED
INSULATED/COVERED, AND/OR OCCUPIED PRIOR TO THE APPROPRIATE INSPECTION, Beginning prior to obtaining
a building permit and/or proceeding with construction beyond the stage of a required inspection without approval
constitutes Late Fee penalties, per Z-289 of the Carmel/Clay Zoning Ordinance; 29.06.07, and 29.06.08.
LDING & CODE EN FOP. CEMENT: CITY OF CARMEL. One Civic Sq,; Carmel, IN 46032. Pi). ('517] 571-2444..
and accurately on the
, submitted with the
· I further
Failure to comply
penalties of Perjury (Indiana
in the table below is
provided o
Community Services regarding the
otherwise mislead the Dept. of
TOTAL
Porch or
sunroom
Garages
)ATE
S:Permits/FORHSIRESZDENTZAL PROCEDURES 2 of 2