Loading...
HomeMy WebLinkAbout05110179-Sq. Ft. k. All sidewalks and driveways I. Sewer and water lines, septic system, (tanks & filed system) and/or well locations m. Drainage flow arrows n. All drainage swales and subsurface facilities (retention / detention areas, etc...) o. Sump pump -- Show sump pump pit(s) and discharge line locations p. Geothermal heat pump discharge locations *NOTE: If land is not within a platted subdivision, a legal description is required, CARMEL ZONING ORDINANCE Z-289, SECTION 29.04,02 (3): "The Director shall approve or deny the Improvement Location Permit within five (5) working days of the receipt of the written appliCation form and accompanying materials, The Improvement Location Permit shall be issued when the proposed structure, improvement, or use and its location conform in all respects to this ordinance." IN ADDITION TO THE ABOVE-LISTED SUBMITTAL REQUIREMENTS, THE BUILDING INSPECTOR WILL BE PROVIDED WITH ANY INFORMATION RELATIVE TO COMMITMENTS MADE IN THE ZONING PROCESS FOR THE PROPERTY INVOLVED· THIS WOULD INCLUDE ANY PLAN COMMISION, BOARD OF ZONING APPEALS, AND/OR DEPT. OF COMMUNITY SERVICES ADMINISTRATIVE APPROVALS REQUIRED. ADDITIONAL INFORMATION MAY BE REQUESTED BY, AND WILL BE PROVIDED TO THE BUILDING INSPECTOR, IF THE SUBMITTED PLANS ARE NOT OF SUFFICIENT CLARITY OR DETAIL, TO INDICATE THE NATURE AND EXTENT OFTHE WORK PROPOSED AND TO DETERMINE COMPLIANCE WITH ALL APPLICABLE CODES AND ORDINANCES· SUBMITTAL OF ADDITIONALLY REC~UESTED/REQUIRED INFORMATION, AFTERTHE INITIAL SUBMI1-FAL, WILL EXTEND THE TIME IT TAKES COMPLETE THE PERMIT REVIEW. THE OFFICE OF BUILDING & CODE ENFORCEMENT RECOGNIZES ANY ROOM/AREA DESIGNATED ON CONSTRUCTION PLANS AS A "BoNus ROOM'" TO BE UN_~.~.~_CCUPIABLE~ SPACE· IF AN AREA SO LABELEDIS TO BE A FINISHED SPACE, CONSTRUCTION PLANS MUST BE LABELED ACCORDINGLY. IF IT IS DETERMINED THAT AN UNFINISHED, "BoNUS ROOM" AREA IS TO BECOME A FINISHED AREA ~ ISSUANCE OF THE PER~L~ THE PLANS AND PERMIT RECORDS MUST BE UPDATED AT THE OFFICE OF BUILDING & CODE ENFORCEMENT. ALL CONSTRUCT/ON IS SUB3ECT TO I~ELD ZNSPECT/ON~ AND SHOULD NOT BEGZN PRIOR TO THE XSSUANCE OF THE BUZLDZNG PERMzT. ONCE THE PERMIT IS ISSUED, WORK SHOULD NOT BE POURED INSULATED/COVERED, AND/OR OCCUPIED PRIOR TO THE APPROPRIATE INSPECTION, Beginning prior to obtaining a building permit and/or proceeding with construction beyond the stage of a required inspection without approval constitutes Late Fee penalties, per Z-289 of the Carmel/Clay Zoning Ordinance; 29.06.07, and 29.06.08. LDING & CODE EN FOP. CEMENT: CITY OF CARMEL. One Civic Sq,; Carmel, IN 46032. Pi). ('517] 571-2444.. and accurately on the , submitted with the · I further Failure to comply penalties of Perjury (Indiana in the table below is provided o Community Services regarding the otherwise mislead the Dept. of TOTAL Porch or sunroom Garages )ATE S:Permits/FORHSIRESZDENTZAL PROCEDURES 2 of 2