HomeMy WebLinkAbout1303-M101 STATE SUB.pdfEQUIPMENT SCHEDULE
UNIT MANUFAC7URER MODEL NUMBER 70 S V�PHASE & MOCP COBN G HEATISG BN CFM A�R ��� EQUIPMENT NOTES
RTU7 CARRIER 48TCED08 7.5 208/230V,30 60 90,000 180,000 3,000 300 O7 O2 3004 5006
RTU2 CARRIER 48TCED08 7.5 208/230V,30 60 90,000 180,000 3,000 300 O7 O2 O3 4005 O6
EFi BROAN QTROSOL 120V, 10 1.6 OOO
EF2 BROAN QTROSOL 120V, 10 1.6 OOO
EQUIPMENT NOTES:
1O - R/A SMOKE DETECTOR 'M7H REMOlE lEST AND RESET STA710N
2O - ENiHALPY ECONOMIZER
3O - POWERED CONVENIENCE OUTLET
4O - NON-NSED DISCONNECT
SO - PROGRAMMABLE THERMOSTAT WITH REMOTE SENSORS
6O - CURB, KNOCK DOWN
7O - BACKDRAFT DAMPER
8O - POWERED BY ELEC7RICIAN 7HROUGH LIGHT SWITCH
O9 - WALL DROP
GENERAL NOTES:
1. ALL EQUIPMENT, COMPONENTS, AND MATERIALS SHALL CONFORM TO ALL LOCAL, STAlE, AND FEDERAL APPLICABLE CODES.
2. HVAC WORK IS INDICAlED DIAGRAMMA7ICALLY. EXACT LOCATOINS OF ALL EQUIPMENT, COMPONENTS, AND MATERIALS TO BE DElERMIED
IN FIELD.
3. INSTALLA710N OF ALL EQUIPMENT, COMPONENTS, AND MAlERIALS TO BE COORDINATED 'M7H GC AND ALL 7F2ADES TO AVOID CONRICTS.
4. ALL EQUIPMENT AND COMPONENTS MUST MEET STANDARDS OFITEMS SCHEDULED AS THE MINIMUM REQUIREMENTS.
5. MECHANICAL CONTRACTOR RESPONSIBLE FOR PROVIDING ALL LABOR, EQUIPMENT, COMPONENTS, AND MAlERIALS NECESSARY TO
CONSiF2UCT A COMPLETE OPERATIONAL HVAC SYSTEM FOR ENTIRE PROJECT.
6. MECHANICAL CONTRACTOR TO OBTAIN ALL REQUIRED PERMITS.
7. ALL DUCTWORK TO BE SPIRAL GALVANIZED METAL DUCT.
8. ALL DUCT IN CONCEALED SPACES TO BE EX7ERNALLY WRAPPED WITH 1 1/2" FOIL FACED INSULA710N.
9. ALL BRANCH LINES TO DIFFUSERS TO BE INSTALLED WITH BALANCING DAMPERS.
10. REX DUCT TO BE 6' MAXIMUM FOR FINAL CONNEC710NS.
11. ALL SUPPLY AIR DEVICES N7LL BE BALANCED TO DESIGN BY INDEPENDENT "TAB° CONTRACTOR AND CERTIFIED REPORT
PRESENTED TO OWNER.
12. MECHANICAL CONTRACTOR TO INSTALL NEW SET(S) OF FILTER PRIOR TO BALANCING.
13. INSTALLA710N OF ALL THERMOSTATS TO COMPLY WI7H ADA STANDARDS.
14. LOCATION OF SMOKE DUCT DETECTOR TEST/RESET STATIONS TO BE DETERMINED BY OWNER.
15. MECHANICAL CONTRACTOR RESPONSIBLE FOR ALL ACCESS PANELS NECESSARY FOR SERVICING OF E�UIPMENT AND COMPONENTS.
16. PROVIDE SET OF LAMINAlED AS-BUILT DRAN7NGS TO OWNER.
17. PROVIDE 1F2AINING TO OWNERS REPRESENTATIVE(S) ON OPERATION OF ALL EQUIPMENT.
18. ITEMS MISSING FROM DRAWINGS/SCHEDULE DOES NOT RELIEVE MECHANICAL CONTRACTOR FROM INSTALLING COMPLElE
OPERATIONAL HVAC SYSTEM.
19. ALL IlEMS LOCATED IN RElURN AIR PLENUM SPACE TO BE PLENUM RAiED.
�II ; „
=��JIo11II I�IGi'a_r_�
// � II� . // I
• IIII�I�I�I�\J�
T -: �- '
� �I'�L
i
/ 300 �� i ry
CFM ILII ��
��° a.Fx
I IIIIIIIIIII I
T 12°0
300 �
�11 CFM
✓, R1U1
r�
I� I
300 3001 I
CFM � _
10°0 12"0
�300
CFM
�
�-
o�>
w s
�
M�ZZANW� p�AN �
F LL
O �
SCAI E�, I/8"=I'_0�� c' �'
`�� � Z 300
300 � . _ _ �FM -_ -_ �
CFM (�� l.e LJ � LJ V� J
r �
12"0
I�I ��
i�, � ,
� ii r'
IS
�-�
300
CFM
300 �
rCFA�Y----�0
�-------
�� ����
300 �
CFM
10°0 1 12"0 14�0
300
CFM
I5� i� HVi�C i��i�N
`rN.E� I/8ii_I��ii
300
CFM
z
o ¢
� a
z
ZIN
�U��
300 � f ��
�---�
�� ��
�
10"0 300
CFM
II
I
- ��
_ ia' No. "' �
= � pE 19300363: ¢ ;
yyp�•, STATEOP ,'�`
���\ �S�i� mmm���`�e
/SS�/�dCO�CONS�I�CTON °NA'�
'd�5/GN//��1/�d�� ��`��'
�
E
M
COMPANY
INCORPORATED
ELECTRICAL
MECHANICAL
CONTRACTORS
2221 East Southport Road
Southport, Indiana 46227
317-783-3291 - voice
317-783-3060-fax
1-800-937-9331
DESIGN BUILD EXPERTISE
V /
�
�
O
� �
Q
� U Q
W ;Q
W wz
� � w
� Q Q
O � U
Y■1 J
i
Z
a
�
DRAWING DATE
JUNE 28, 2013
REVISIONS:
1.
2.
3.
4.
5.
DRAWN BY:
CHECKED BY:
PROJECT NUMBER:
HVAC PLAN
M 101
THESE DRAX7NGS ARE GI�EN IN CONFlDENCE
AND SHALL BE USED ONLY IN PURSUANT TO
THE AGREEMENT VATH E.M. COMPANY, INC.
NO O7HER USE OR DUPLICA710N MAY BE MADE
W17HOUT THE PRIOR NRIT7EN CONSENT OF
E.M. COMPANY, INC.
ALL OTNER COPIRIGHT AND COMMON LAW
RIGH75 ARE HEREBY SPECIflCALLY RESERVED.