May 11,2007
JAMES BRAINARD, IvlAYOR
Mr. Adam DeHart
Keeler-Webb Associates
486 GradJe Drive
Carmel, IN 46032
RE: Boardwalk Shops, Lot 3,Block 21CS&TP-Project Review #4
Dear Mr. DeHart:
The City bas received your commentlelter and drawings dated April 4, 2007 based upon the City review of
March 16,2006.
The comments from the City review have been satisfactorily addressed with the following exceptions:
PROJECT COMME~ONSTRUcrION PLANS
18. The Department is requesting that the Boardwalk Shops project participate in or commit monies
for the milling and resurfacing of Adams Street from the limits of the current City Center Drive
Phase IT road project to Carmel Drive. Adams Street will be impacted by the increase in traffic
resulting from the Boardwalk Shops and the proposed development to the southeast Tbe
development of Block 7 bas started and this part or Adams -Street Is scbedulecll 1'01' milling
and resurfacing by tbat project. Now that participation iD phy.sical construction is not
required, the City repeats its previous request for the financial participation for the work to
be completed by tbe Block 7 project.
Based upon additional review, the City has additional comments:
1. The configuration of the entrance is not as indicated on the recent Board of Public Works and
Safety submittal. Per the letter for the curb cut to the Board, the Department of Engineering
cannot support the proposed entrance con~guration (widths, etc.) presented. Tbe Board of'Publie
Works eurb cut approval letter indicated that the configuration was Dot approved. Thank
you for indicating tbat the Fire Department is acceptable to the 14' lanes. However, as
pnmouslyindicated, the Board approval did not approve the conf"IgUratioD. Please provide
30' curb retum radii.
2. How Is tbe on-street parking graded? The Department of Engineering would expecttbe parldng to
grade away from the street.and the installation ofan inlet within the limits of the curbed area.
Thank you for adding the detail. Please revise text note on Sheet Cl to read: "lnstaIl2'
valley concrete gll~r per detail 10....9 on Sheet SA."
3. Please confirm with the Department of Community Services that the proposed on-street parking is
configured as desired. The Department of Engineering would not expect to see bead-in,
perpendicular on-street parking. Thank you lor your response. However, per our previous
letter Engineering did not recommend the 90 degree parking or tbe signage to back. in.
Engineering approves these spaces siuee you indicated that thIs configuration Is tbe result of
discussions with the Department of Community Services. the owner, and the plan
commission.
4.. Please confirm with the Hamilton County Surveyor's Office that the IOO-year elevation is
contained on-site. As the detention is remOte, the overland flow path of the lOO-year stann cannot
cross Cannel Drive. Carmel Science and Technology Park, Block 7 agreed to reconstruct portions
DEPARTMENT OF ENGINEERING ~'---.
ONE ClvlC SQUARE, eMMEL, IN 46032 OFFICE 317.571.244] FAX 317.571.?439
EMAiL engineering@carmeLin.goy
...
.'\ J
~
of the downstream drainage system to contaiIi. the 100-year an-site. Thank you for your
response, but we Il'estate the comment. Is the lOO-year storm event contained on site or does
it cross Carmel Drive? We would expect the lOO-year elevation of the pond itself to be
contained in the pond. Is tbe runoff [rom the tOO-year rain event falling on this site
contained on site?
5. The curb on the entrance radii shan be chairback curb. Please indicate chairback curb an the plan
and provide the chairback curb standard detail. Tbere was no respoDse provided for this
comment. The eurb at the entrance within tbe right-of-way shall be chairback curb unless
the existing curb on Adams Street is roll curb.
6. Please remove the title for the landscaping/exterior lighting plan from the sheet index on the cover
sheet.
7. Please canfirm, again if you have already dane so, thatthe sidewalk behind the an-street parking
spaces is cantained in a dedicated ingress/egress easement. One is nat indicated on Sheet C 1.
These comments represent the Department .of Engineering's fourth review .of this project. We request that
all respanses ta our comments be provided in writing. Failure ta provide written responses may result in
the delay of the review pracess.
It is critical that our .office be made aware .of all madificatians made on the plans being resubmitted,
particularly if any such changes are considered "new" or faU outside .of .our previaus reviews. Please
pravide revised plans including all revisi.ons. Please natify us .of any changes and specifically state any
changes, including changes resulting fram Plan Cammissian, BZA Dr ather cammittee meetings.
All bands and perf.ormance guarantees must be pasted priar ta Engineering Department approval of
canstructian plans. Alsa, Board of Public Works and Safety appr.ovals and any other governing agency
appravals (if required) must be obtained prior to Engineering Department approval.
The Department reserves the right to pr.ovide additianal comments based on subsequent reviews.
Comments generated from Crossr.oads Engineers review .of the drainage aspects of this project will be
mailed directly ta you. Ifyau have not already dane sa, please provide plans and drainage calculations
directly to Crossroads Engineers. Continue to wark with Crassraad Engineers on their review and
approval.
If yau have questions, please contact me at 571-2441.
cc: Angie Conn, Department of Community Services
Greg Hayes, Hamilton Caunty Survey.or's Office
Greg IIko. Cr.ossroad Engineers
Gary Hoyt, Fire Marshall, City of Carmel
Engineering Department Review
Project File
S:\PROJREV07\BOARDW ALKSHOPSLOT3BLK2CSTP#4
'~--
KEELER-WEBB ASSOCIATES
LETTER OF TRANSMITTAL
Consulting E'rLginp.wrs-Plu,nnwrs- S'ILTveyuTs
486 Gradle Drive
Carmel, Indiana 46032
(317) 574-0140
DATE J JOB NO.
3/2/2007 , 0507.025~' vv'
Attention '''',
Matt Griffin ~""
Re: '"
Boardwalk Shops ~"
'.'-
Adams Street I Carmel Drive
Carmel, IN
TO
City Of Carmel Department
Of Community Services
One Civic Square
Carmel, IN 46032
o Shop drawings
D Copy of letter
IZI Attached
IZI Prints
D Under separate cover via Mail
the following items:
WE ARE.'3ENDING YOU
o Plans
D Samples
o Specifications
"-
,''\,.
o Change order
D_
COPIES DATE NO. DESCRIPTION ", ~
2 2 Paper copies of Secondary Plat
2 2 Mylar copies of Secondary Plat
THESE ARE TRANSMITTED as checked below:
o For approval
D Approved as submitted
o Resubmit _ copies for approval
[?J For your use
o As requested
D Approved as noted
o Submit
o Return
copies for distribution
D Returned for corrections
corrected prints
o For review and comment
0_
D FOR BIDS DUE
REMARKS
D PRINTS RETURNED AFTER LOAN TO US
Please contact us if you have any questions or comments at any time.
COpy TO
Charlie Key
Carmel En~ineerinQ
SIGNED: ADAM DeHART. LS
If enclosures are not as noted, kindly notify us at once.
~
j'-
'F:,(;l\~~7~r-.'J.-''5f
~~~~r:~:~~~~l:-~.~_~~~
CI EL
;)
March 16, 2006
JAMES BRAINARD, MAYOR
Mr. Adam DeHart
Keeler-Webb Associates
486 Gradle Drive
Carmel, IN 46032
RE: Boardwalk Shops, Lot 3, Block 2/CS&TP-Project Review #3
Dear Mr. DeHart:
The City has received your comment letter and drawings dated February 23, 2006 based upon the City
review of January 20, 2006.
The comments from the City review have been satisfactorily addressed with the following exceptions:
PROJECT COMMENTS-CONSTRUCTION PLANS
18. The Department is requesting that the Boardwalk Shops project participate in or commit monies
for the milling and resurfacing of Adams Street from the limits of the current City Center Drive
Phase II road project to Carmel Drive. Adams Street will be impacted by the increase in traffic
resulting from the Boardwalk Shops and the proposed development to the southeast. The
_ development of the Carmel Science and Technology Park, Block 7 has been delayed. We
request that the plans indicate milling and resurfacing of the full width of Adams Street
across your frontage.
Based upon additional review, the City has additional comments:
1. The configuration of the entrance is not as indicated on the recent Board of Public Works and
Safety submittal. Per the letter for the curb cut to the Board, the Department of Engineering
cannot support the proposed entrance configuration (widths, etc.) presented. The Board of Public
Works curb cut approval letter indicated that the configuration was not approved. Lanes
shall be 16 feet width minimum unless the Fire Department considers the lane width of 14
feet acceptable. The curb return radii shall be a minimum of 30 feet.
2. How is the on-street parking graded? The Department of Engineering would expect the parking to
grade away from the street and the installation of an inlet within the limits of the curbed area.
This is acceptable provided that the valley gutter indicated is installed across the parking
area. Please add the valley gutter detail. The current City standard is on the website.
3. Please confirm with the Department of Community Services that the proposed on-street parking is
configured as desired. The Department of Engineering would not expect to see head-in,
perpendicular on-street parking. We will respect discussions that have been had to this point
with the Department of Community Services and the Plan Commission; however, the
Department of Engineering does not recommend the 90 degree parking or the signage to
back in. The parking spaces should be parallel or angled. However, engineering will
approve the spaces as configured if the configuration represents the expectations of previous
discussions.
4. Please confll1l1 with the Hamilton County Surveyor's Office that the 100-year elevation is
contained on-site. As the detention is remote, the overland flow path of the 100-year stonn cannot
cross Carmel Drive. Carmel Science and Technology Park, Block 7 agreed to reconstroct portions
of the downstream drainage system to contain the IOO-year on-site. Thank you for your
DEPARTMENT OF ENGINEERING
ONE CMC SQUARE, CARMEL, IN 46032 OFFICE 317.571.2441 FAX 317.571.2439
EMAIL engineering@ci.carmel.in.us
;'
.i
,
response, but we restate the comment. Is the tOO-year storm event contained on site or does
it cross Carmel Drive?
5. The curb on the entrance radii shall be chairback curb. Please indicate chairback curb on the plan
and provide the chairback curb standard detail.
These comments represent the Department of Engineering's second review of this project. We request that
all responses to our comments be provided in writing. Failure to provide written responses may result in
the delay of the review process.
It is critical that our office be made aware of all modifications made on the plans being resubmitted,
particularly if any such changes are considered ''new'' or fall outside of our previous reviews. Please
provide revised plans including all revisions. Please notify us of any changes and specifically state any
changes, including changes resulting from Plan Commission, BZA or other committee meetings.
All bonds and performance guarantees must be posted prior to Engineering Department approval of
construction plans. Also, Board of Public Works and Safety approvals and any other governing agency
approvals (if required) must be obtained prior to Engineering Department approval.
The Department reserves the right to provide additional comments based on subsequent reviews.
Comments generated from Crossroads Engineers review of the drainage aspects of this project will be
mailed directly to you. If you have not already done so, please provide plans and drainage calculations
directly to Crossroads Engineers. Continue to work with Crossroad Engineers on their review and
approval.
If you have questions, please contact me at 571-2441.
cc: Matt Griffm, Department of Community Services
Greg Hoyes, Hamilton County Surveyor's Office
Greg Itko, Crossroad Engineers
Engineering Department Review
Project File
S:\PROJREV05\BOARDW ALKSHOPSLOT3BLK2CSTP#2
..- -,'-6
EL
January 20, 2006
JAMES BRAINARD, }1AYOR
Mr. Adam DeHart
Keeler-Webb Associates
486 Gradle Drive
Carmel, IN 46032
RE: Boardwalk Shops, Lot 3, Block 2/CS&TP-Project Review #2
Dear Mr. DeHart:
0f50'r 00 I q DPAPlS
The City has received your comment letter and drawings dated December 9, 2005 based upon the City
review of August 11, 2005.
The comments from the City review have been satisfactorily addressed with the following exceptions:
PROJECT COMMENTS-CONSTRUCTION PLANS
9. Please confirm that the five-foot wide concrete sidewalk is consistent with the Alternative
Transportation Plan with the Department of Community Services. The presence of existing five-
foot sidewalks in the vicinity may not meet Alternative Transportation Plan requirements, and
should not be the basis for the Boardwalk Shops development to install concrete walks.
12. Please indicate and label all proposed and existing rights-of-way. Did not find label for Adams
Street right-of-way.
16. Please delineate any street cuts on the plan for saw cut, removal, and replacement. Provide the
City's standard street cut patch detail. Thank you for provic:Iing the City's street cut patch
detail on Sheet 7. However, the street cuts have not been indicated on Sheet Cl as requested.
18. The Department is requesting that the Boardwalk Shops project participate in or commit monies
for the milling and resurfacing of Adams Street from the limits of the current City Center Drive
Phase II road project to Carmel Drive. Adams Street will be impacted by the increase in traffic
resulting from the Boardwalk Shops and the Iproposed development to the southeast.
Based upon additional review, the City has additional comments:
1. The configuration of the entrance is not as indicated on the recent Board of Public Works and
Safety submittal. Per the letter for the curb cut to the Board, the Department of Engineering
cannot support the proposed entrance configuration (widths, etc.) presented.
2. How is the on-street parking graded? The Department of Engineering would expect the parking to
grade away from the street and the installation of an inlet within the limits of the curbed area.
3. Please confirm with the Department of Community Services tha.t.the proposed on-street parking is
configured as desired. The Department of Engineering would not expect to see head-in,
perpendicular on-street parking. '
4. Please confirm with the Hamilton County Surveyor's Office that the 100-year elevation is
contained on-site. As the detention is remote, the overland flow path of the 100-year storm cannot
cross Carmel Drive. Carmel Science and Technology Park, Block 7 agreed to reconstruct portions
of the downstream drainage system to contain the 100-year on-site.
These comments represent the Department of Engineering's second review of this project. We request that
all responses to our comments be provided in writing. Failure to provide written responses may result in
the delay of the review process.
DEPARTMENT OF ENGINEERING
ONE CIVIC SQUARE, CARMEL, IN 46032 OFFICE 317.571.2441 FAX 317.571.2439
EMAIL engineering@carmel.in.gov
./:- -.....
It is critical that our office be made aware of all modifications made on the plans being resubmitted,
particularly if any such changes are considered "new" or fall outside of our previous reviews. Please
provide revised plans including all revisions. Please notify us of any changes and specifically state any
changes, including changes resulting from Plan Commission,~ZA or other committee meetings.
All bonds and performance guarantees must be posted prior to Engineering Department approval of
construction plans. Also, Board of Public Works and Safety approvals and any other governing agency
approvals (if required) must be obtained prior to Engineering Department approval.
The Department reserves the right to provide additional comments based on subsequent reviews.
Comments generated from Crossroads Engineers review of the drainage aspects of this project will be
mailed directly to you. If you have not already done so, please provide plans and drainage calculations
directly to Crossroads Engineers. Continue to work with Crossroad Engineers on their review and
approval.
If you have questions, please contact me at 571-2441.
cc:
Matt Griffin, Department of Community Services
Greg Hoyes, Hamilton County Surveyor's Office
Greg Ilko, Crossroad Engineers
Engineering Department Review
Project File
(
\
S:\PROJREY05\BOARDW ALKSHOPSWT3BLK2CSTP#2
,
- -
-~._-'-..._~---_..,.__.._-_....._---
-
Post-it@ Fax Note 7671 Date 8 ". i5
To~ciaW\ ~tk From AYl
Co./Dept. Co.
'2
G
#of ~ 2-
pages
Phone #
Phone #
II. ?-4/7
I-'?LJ-Z~
Fax # ? "1Y - IZ ~ Cf
Fax #
August 15,2005
VIA FAX: 574-1269
Original by mail
Adam DeHart
Keeler-Webb Associates
486 Gradle Drive
Carmel, IN 46032
COpy
RE: Carmel Science & Tech Park, Blk 2 - Boardwalk Shops (#05080019 SP & 05080020 DP/ADLS)-
Secondary Plat & DP/ADLS Applications
Dear Mr. Dehart:
This letter is in response to your Secondary Plat & DP/ADLS Applications for Carmel Science & Tech
Park, Blk 2- Boardwalk Shops. It is anticipated that you will be heard at the August 17 T AC meeting,
where additional comments may be voiced. The Department cannot perform an adequate review of your
petitions without submission of the secondary plat and additional exhibits. A second review letter will be
sent once the Dept. receives the required items. Please complete the following:
Seconcl9ry PI9t
1. A Plat has not yet been submitted. Fulfill all requirements on the Secondary Plat application
checklist.
2. Please add docket no. on plat.
3. Place the flood statement on the plat.
4. Fill in all instrument nos. referred to on the plat.
5. Place the zoning, M-3/Manufacturing, on the plat.
6. Label street names and show/label the half road rights of way of Adams St. and Carmel Dr.
7. Please provide a copy of the covenants, if any.
DP/ADTJS~
8. Please submit the Findings of Fact sheet that accompanies the Development Plan
Application, which can be found at http"//\V\V\V ci carmel in lls/services/f)()('s/r)OC'S i\ l1tm.
Remember to include this page in your info packets.
9. Provide a photometric/lighting plan with foot-candle measurements for the whole site.
10. Provide a clearer Xerox copy of the Magnuform II (pole light) page.
11. Why won't vintage lighting be placed throughout the site? The use of two different pole
lights may not be the best design choice.
12. Provide details on the lighting fixtures for the building exterior, if any.
13. Provide wall signage details/locations/colors/font. Show the maximum square footage
area/rectangle per tenant on the building elevation, to show some uniformity in sign size.
14. The directory sign can only be 5-ft tall and 20 sq ft in area. Only 1 directory sign is allowed.
15. Label the center id ground sign face square footage (each sign), must be less than 30 sq ft.
16. The center id ground signs must be 10-ft from the road right of way, per Ch. 253.07.02-1 I.e.
and only 1 Center id ground sign is allowed per frontage, per Ch. 25.07.02-11.b.
17. Show a landscaped area around all ground sign bases, equal to the sign square footage.
Page 1
ONE CI\TIC SQU.A.RE
C-L'\RL\fEL, INDL'\N-L'\ 46032
317/571- 241 7
Mr. Adam DeHart
August 11, 2005
Boardwalk Shops, Lot 3, Block 2/CS&TP-Project Review #1
Page 2 of3
5. Please be advised that any installation of signs, walls, irrigation systems, etc. within dedicated
right of way and/or dedicated easements will require a Consent to Encroach Agreement between
the Owner/Developer and the City of Carmel. This Agreement requires Board of Public Works
and Safety approval.
6. I am enclosing the following items for your use:
· Commercial Project Approval Procedures.
· Performance Release Procedure.
· Permit Data, Contacts, etc.
· Commercial Permitting Procedures.
BONDING REQUIREMENTS
7. Upon initial review, it appears the following bonding requirements may apply to this project:
PerCormancelMaintenance Guarantees
This project may be required to provide Certified Engineer's Estimates and Performance/Maintenance
Guarantees for the following improvements:
· Perimeter monumentation if the monuments were not previously installed.
· Perimeter concrete sidewalks/asphalt paths.
· Perimeter road improvements.
Provide detailed/itemized Certified Engineer's Estimates in the amount of 100% of the cost of labor
and materials for the requested improvements. Provide individual Performance Guarantees in the
amount of the Engineer's Estimates. When the improvements have been constructed and accepted and
the Performance Guarantee is released by our BPWS, 3-Year Maintenance Guarantees will be required
in the amount of 15% of the Performance amount for streets and curbs and 10% of the Performance
amount for all other improvements.
Street Cut/Right oCWay Permit and Bonding Requirements
Any work in the dedicated right of way of Carmel Drive or Adams Street will require a Right of Way
Permit. If the work is included in the scope of work of a required Performance Guarantee, a separate
License and Permit Bond will not be required. If the work is not included in a Performance Guarantee,
a License and Permit bond will be required. The bond amount will be determined by the number of
instances of work in the right of way @ $2,000.00 per instance. Ooen oavement cuts in dedicated
streets reauire aooroval hv our Board of Public Works and Safetv. Please contact Fred Glaser,
Department of Engineering Right of Way Inspector/Manager for details regarding this issue.
PROJECT COMMENTS-CONSTRUCTION PLANS
8. The Department of Engineering cannot support the proposed access to Adams Street as shown as
it will be difficult to accommodate future improvements to the Adams Street/Carmel Drive
intersection. The Department of Engineering has requested that the developer of the property to
the southeast align their main access from Adams Street with the existing full access drive on
Adams Street, even though the access is still closer to the Carmel Drive/Adams Street intersection
than the City would otherwise consider acceptable.. The Department requires that the Boardwalk
Shops development utilize the existing full access to the east.
9. Please confIrm that the five-foot wide concrete sidewalk is consistent with the Alternative
Transportation Plan with the Department of Community Services. The presence of existing five-
foot sidewalks in the vicinity may not meet Alternative Transportation Plan requirements, and
should not be the basis for the Boardwalk Shops development to install concrete walks.
10. The bike path along Carmel Drive is indicated as concrete. This needs to be asphalt.
11. Please label the widths of all internal drives, drive aisles, alleys, and streets.
12. Please indicate and label all proposed and existing rights-of-way.
13. Any off-site easements necessary for installation of utilities must be secured 'prior to the
Department of Engineering approving the drawings.
14. ADA ramps are required at all locations where the sidewalks or asphalt paths cross the streets.
.
CITY OF CARMEL
e
ZONING/ DEVELOPMENTS RECEIPT
********************************************************************************
PARCEL ID
PROJECT
RECEIPT #
RECEIPT DATE
RECEIVED BY
REC'D. FROM
TEST106.1
UDF 106.2
: BOARDWALK SHOPS @ NE CORNER OF CARMEL DR. AND ADAMS STREET
1609350002002000
05080020
19426
08/11/2005
ADDRESS 722 ADAMS ST
PRINT DATE 08/11/2005
PRINT TIME 10:38:41
OPERATOR awold ~V~_f~\
COpy # : 1 ~)vv
CASH DRAWER: PZ
awold
C & L MANAGEMENT, IN
FEE ID UNIT QUANTITY
AMOUNT PD-TO-DT THIS REC NEW BAL
---------- ---------- ---------- ----------
875.50 0.00 875.50 0.00
---------- ---------- ---------- ----------
875.50 0.00 875.50 0.00
---------- ------------- ----------
P-SECPLAT LOTS 1.00
TOTAL PROJECT :
METHOD OF PAYMENT
AMOUNT
NUMBER
CHECK
TOTAL RECEIPT :
875.50
8016
------------
------------
875.50
.
ZONING/ DEVELOPMENTS RECEIPT
CITY OF CARMEL
--
********************************************************************************
PARCEL ID
PROJECT
RECEIPT #
RECEIPT DATE
RECEIVED BY
REC'D. FROM
TEST106.1
UDF 106.2
NOTES : BOARDWALK SHOPS DP/ADLS @ CORNER OF CARMEL DR & ADAMS ST
1609350002002000
05080019
19427
08/11/2005
awold
C & L MANAGEMENT INC
FEE ID UNIT QUANTITY
---------- ------------- ----------
P-ADLS ACREAGE 2.63
P-DP ACREAGE 2.63
TOTAL PROJECT :
METHOD OF PAYMENT
AMOUNT
CHECK
CHECK
TOTAL RECEIPT
1043.39
650.45
------------
------------
1693.84
ADDRESS 722 ADAMS ST
PRINT DATE 08/11/2005
PRINT TIME 10:43:31
OPERATOR a1wold ~"{-""n.."'~
COpy # : -r\ -y~--
CASH DRAWER: PZ
AMOUNT PD-TO-DT THIS REC NEW BAL
---------- ---------- ---------- ----------
650.45 0.00 650.45 0.00
1043.39 0.00 1043.39 0.00
---------- ---------- ---------- ----------
1693.84 0.00 1693.84 0.00
NUMBER
8017
8018