Loading...
HomeMy WebLinkAboutCorrespondence \J.., . ," EL . ~ RECEIVED o AlAY 1 42001 '( -. /JOCS May 11,2007 JAMES BRAINARD, IvlAYOR Mr. Adam DeHart Keeler-Webb Associates 486 GradJe Drive Carmel, IN 46032 RE: Boardwalk Shops, Lot 3,Block 21CS&TP-Project Review #4 Dear Mr. DeHart: The City bas received your commentlelter and drawings dated April 4, 2007 based upon the City review of March 16,2006. The comments from the City review have been satisfactorily addressed with the following exceptions: PROJECT COMME~ONSTRUcrION PLANS 18. The Department is requesting that the Boardwalk Shops project participate in or commit monies for the milling and resurfacing of Adams Street from the limits of the current City Center Drive Phase IT road project to Carmel Drive. Adams Street will be impacted by the increase in traffic resulting from the Boardwalk Shops and the proposed development to the southeast Tbe development of Block 7 bas started and this part or Adams -Street Is scbedulecll 1'01' milling and resurfacing by tbat project. Now that participation iD phy.sical construction is not required, the City repeats its previous request for the financial participation for the work to be completed by tbe Block 7 project. Based upon additional review, the City has additional comments: 1. The configuration of the entrance is not as indicated on the recent Board of Public Works and Safety submittal. Per the letter for the curb cut to the Board, the Department of Engineering cannot support the proposed entrance con~guration (widths, etc.) presented. Tbe Board of'Publie Works eurb cut approval letter indicated that the configuration was Dot approved. Thank you for indicating tbat the Fire Department is acceptable to the 14' lanes. However, as pnmouslyindicated, the Board approval did not approve the conf"IgUratioD. Please provide 30' curb retum radii. 2. How Is tbe on-street parking graded? The Department of Engineering would expecttbe parldng to grade away from the street.and the installation ofan inlet within the limits of the curbed area. Thank you for adding the detail. Please revise text note on Sheet Cl to read: "lnstaIl2' valley concrete gll~r per detail 10....9 on Sheet SA." 3. Please confirm with the Department of Community Services that the proposed on-street parking is configured as desired. The Department of Engineering would not expect to see bead-in, perpendicular on-street parking. Thank you lor your response. However, per our previous letter Engineering did not recommend the 90 degree parking or tbe signage to back. in. Engineering approves these spaces siuee you indicated that thIs configuration Is tbe result of discussions with the Department of Community Services. the owner, and the plan commission. 4.. Please confirm with the Hamilton County Surveyor's Office that the IOO-year elevation is contained on-site. As the detention is remOte, the overland flow path of the lOO-year stann cannot cross Cannel Drive. Carmel Science and Technology Park, Block 7 agreed to reconstruct portions DEPARTMENT OF ENGINEERING ~'---. ONE ClvlC SQUARE, eMMEL, IN 46032 OFFICE 317.571.244] FAX 317.571.?439 EMAiL engineering@carmeLin.goy ... .'\ J ~ of the downstream drainage system to contaiIi. the 100-year an-site. Thank you for your response, but we Il'estate the comment. Is the lOO-year storm event contained on site or does it cross Carmel Drive? We would expect the lOO-year elevation of the pond itself to be contained in the pond. Is tbe runoff [rom the tOO-year rain event falling on this site contained on site? 5. The curb on the entrance radii shan be chairback curb. Please indicate chairback curb an the plan and provide the chairback curb standard detail. Tbere was no respoDse provided for this comment. The eurb at the entrance within tbe right-of-way shall be chairback curb unless the existing curb on Adams Street is roll curb. 6. Please remove the title for the landscaping/exterior lighting plan from the sheet index on the cover sheet. 7. Please canfirm, again if you have already dane so, thatthe sidewalk behind the an-street parking spaces is cantained in a dedicated ingress/egress easement. One is nat indicated on Sheet C 1. These comments represent the Department .of Engineering's fourth review .of this project. We request that all respanses ta our comments be provided in writing. Failure ta provide written responses may result in the delay of the review pracess. It is critical that our .office be made aware .of all madificatians made on the plans being resubmitted, particularly if any such changes are considered "new" or faU outside .of .our previaus reviews. Please pravide revised plans including all revisi.ons. Please natify us .of any changes and specifically state any changes, including changes resulting fram Plan Cammissian, BZA Dr ather cammittee meetings. All bands and perf.ormance guarantees must be pasted priar ta Engineering Department approval of canstructian plans. Alsa, Board of Public Works and Safety appr.ovals and any other governing agency appravals (if required) must be obtained prior to Engineering Department approval. The Department reserves the right to pr.ovide additianal comments based on subsequent reviews. Comments generated from Crossr.oads Engineers review .of the drainage aspects of this project will be mailed directly ta you. Ifyau have not already dane sa, please provide plans and drainage calculations directly to Crossroads Engineers. Continue to wark with Crassraad Engineers on their review and approval. If yau have questions, please contact me at 571-2441. cc: Angie Conn, Department of Community Services Greg Hayes, Hamilton Caunty Survey.or's Office Greg IIko. Cr.ossroad Engineers Gary Hoyt, Fire Marshall, City of Carmel Engineering Department Review Project File S:\PROJREV07\BOARDW ALKSHOPSLOT3BLK2CSTP#4 '~-- KEELER-WEBB ASSOCIATES LETTER OF TRANSMITTAL Consulting E'rLginp.wrs-Plu,nnwrs- S'ILTveyuTs 486 Gradle Drive Carmel, Indiana 46032 (317) 574-0140 DATE J JOB NO. 3/2/2007 , 0507.025~' vv' Attention '''', Matt Griffin ~"" Re: '" Boardwalk Shops ~" '.'- Adams Street I Carmel Drive Carmel, IN TO City Of Carmel Department Of Community Services One Civic Square Carmel, IN 46032 o Shop drawings D Copy of letter IZI Attached IZI Prints D Under separate cover via Mail the following items: WE ARE.'3ENDING YOU o Plans D Samples o Specifications "- ,''\,. o Change order D_ COPIES DATE NO. DESCRIPTION ", ~ 2 2 Paper copies of Secondary Plat 2 2 Mylar copies of Secondary Plat THESE ARE TRANSMITTED as checked below: o For approval D Approved as submitted o Resubmit _ copies for approval [?J For your use o As requested D Approved as noted o Submit o Return copies for distribution D Returned for corrections corrected prints o For review and comment 0_ D FOR BIDS DUE REMARKS D PRINTS RETURNED AFTER LOAN TO US Please contact us if you have any questions or comments at any time. COpy TO Charlie Key Carmel En~ineerinQ SIGNED: ADAM DeHART. LS If enclosures are not as noted, kindly notify us at once. ~ j'- 'F:,(;l\~~7~r-.'J.-''5f ~~~~r:~:~~~~l:-~.~_~~~ CI EL ;) March 16, 2006 JAMES BRAINARD, MAYOR Mr. Adam DeHart Keeler-Webb Associates 486 Gradle Drive Carmel, IN 46032 RE: Boardwalk Shops, Lot 3, Block 2/CS&TP-Project Review #3 Dear Mr. DeHart: The City has received your comment letter and drawings dated February 23, 2006 based upon the City review of January 20, 2006. The comments from the City review have been satisfactorily addressed with the following exceptions: PROJECT COMMENTS-CONSTRUCTION PLANS 18. The Department is requesting that the Boardwalk Shops project participate in or commit monies for the milling and resurfacing of Adams Street from the limits of the current City Center Drive Phase II road project to Carmel Drive. Adams Street will be impacted by the increase in traffic resulting from the Boardwalk Shops and the proposed development to the southeast. The _ development of the Carmel Science and Technology Park, Block 7 has been delayed. We request that the plans indicate milling and resurfacing of the full width of Adams Street across your frontage. Based upon additional review, the City has additional comments: 1. The configuration of the entrance is not as indicated on the recent Board of Public Works and Safety submittal. Per the letter for the curb cut to the Board, the Department of Engineering cannot support the proposed entrance configuration (widths, etc.) presented. The Board of Public Works curb cut approval letter indicated that the configuration was not approved. Lanes shall be 16 feet width minimum unless the Fire Department considers the lane width of 14 feet acceptable. The curb return radii shall be a minimum of 30 feet. 2. How is the on-street parking graded? The Department of Engineering would expect the parking to grade away from the street and the installation of an inlet within the limits of the curbed area. This is acceptable provided that the valley gutter indicated is installed across the parking area. Please add the valley gutter detail. The current City standard is on the website. 3. Please confirm with the Department of Community Services that the proposed on-street parking is configured as desired. The Department of Engineering would not expect to see head-in, perpendicular on-street parking. We will respect discussions that have been had to this point with the Department of Community Services and the Plan Commission; however, the Department of Engineering does not recommend the 90 degree parking or the signage to back in. The parking spaces should be parallel or angled. However, engineering will approve the spaces as configured if the configuration represents the expectations of previous discussions. 4. Please confll1l1 with the Hamilton County Surveyor's Office that the 100-year elevation is contained on-site. As the detention is remote, the overland flow path of the 100-year stonn cannot cross Carmel Drive. Carmel Science and Technology Park, Block 7 agreed to reconstroct portions of the downstream drainage system to contain the IOO-year on-site. Thank you for your DEPARTMENT OF ENGINEERING ONE CMC SQUARE, CARMEL, IN 46032 OFFICE 317.571.2441 FAX 317.571.2439 EMAIL engineering@ci.carmel.in.us ;' .i , response, but we restate the comment. Is the tOO-year storm event contained on site or does it cross Carmel Drive? 5. The curb on the entrance radii shall be chairback curb. Please indicate chairback curb on the plan and provide the chairback curb standard detail. These comments represent the Department of Engineering's second review of this project. We request that all responses to our comments be provided in writing. Failure to provide written responses may result in the delay of the review process. It is critical that our office be made aware of all modifications made on the plans being resubmitted, particularly if any such changes are considered ''new'' or fall outside of our previous reviews. Please provide revised plans including all revisions. Please notify us of any changes and specifically state any changes, including changes resulting from Plan Commission, BZA or other committee meetings. All bonds and performance guarantees must be posted prior to Engineering Department approval of construction plans. Also, Board of Public Works and Safety approvals and any other governing agency approvals (if required) must be obtained prior to Engineering Department approval. The Department reserves the right to provide additional comments based on subsequent reviews. Comments generated from Crossroads Engineers review of the drainage aspects of this project will be mailed directly to you. If you have not already done so, please provide plans and drainage calculations directly to Crossroads Engineers. Continue to work with Crossroad Engineers on their review and approval. If you have questions, please contact me at 571-2441. cc: Matt Griffm, Department of Community Services Greg Hoyes, Hamilton County Surveyor's Office Greg Itko, Crossroad Engineers Engineering Department Review Project File S:\PROJREV05\BOARDW ALKSHOPSLOT3BLK2CSTP#2 ..- -,'-6 EL January 20, 2006 JAMES BRAINARD, }1AYOR Mr. Adam DeHart Keeler-Webb Associates 486 Gradle Drive Carmel, IN 46032 RE: Boardwalk Shops, Lot 3, Block 2/CS&TP-Project Review #2 Dear Mr. DeHart: 0f50'r 00 I q DPAPlS The City has received your comment letter and drawings dated December 9, 2005 based upon the City review of August 11, 2005. The comments from the City review have been satisfactorily addressed with the following exceptions: PROJECT COMMENTS-CONSTRUCTION PLANS 9. Please confirm that the five-foot wide concrete sidewalk is consistent with the Alternative Transportation Plan with the Department of Community Services. The presence of existing five- foot sidewalks in the vicinity may not meet Alternative Transportation Plan requirements, and should not be the basis for the Boardwalk Shops development to install concrete walks. 12. Please indicate and label all proposed and existing rights-of-way. Did not find label for Adams Street right-of-way. 16. Please delineate any street cuts on the plan for saw cut, removal, and replacement. Provide the City's standard street cut patch detail. Thank you for provic:Iing the City's street cut patch detail on Sheet 7. However, the street cuts have not been indicated on Sheet Cl as requested. 18. The Department is requesting that the Boardwalk Shops project participate in or commit monies for the milling and resurfacing of Adams Street from the limits of the current City Center Drive Phase II road project to Carmel Drive. Adams Street will be impacted by the increase in traffic resulting from the Boardwalk Shops and the Iproposed development to the southeast. Based upon additional review, the City has additional comments: 1. The configuration of the entrance is not as indicated on the recent Board of Public Works and Safety submittal. Per the letter for the curb cut to the Board, the Department of Engineering cannot support the proposed entrance configuration (widths, etc.) presented. 2. How is the on-street parking graded? The Department of Engineering would expect the parking to grade away from the street and the installation of an inlet within the limits of the curbed area. 3. Please confirm with the Department of Community Services tha.t.the proposed on-street parking is configured as desired. The Department of Engineering would not expect to see head-in, perpendicular on-street parking. ' 4. Please confirm with the Hamilton County Surveyor's Office that the 100-year elevation is contained on-site. As the detention is remote, the overland flow path of the 100-year storm cannot cross Carmel Drive. Carmel Science and Technology Park, Block 7 agreed to reconstruct portions of the downstream drainage system to contain the 100-year on-site. These comments represent the Department of Engineering's second review of this project. We request that all responses to our comments be provided in writing. Failure to provide written responses may result in the delay of the review process. DEPARTMENT OF ENGINEERING ONE CIVIC SQUARE, CARMEL, IN 46032 OFFICE 317.571.2441 FAX 317.571.2439 EMAIL engineering@carmel.in.gov ./:- -..... It is critical that our office be made aware of all modifications made on the plans being resubmitted, particularly if any such changes are considered "new" or fall outside of our previous reviews. Please provide revised plans including all revisions. Please notify us of any changes and specifically state any changes, including changes resulting from Plan Commission,~ZA or other committee meetings. All bonds and performance guarantees must be posted prior to Engineering Department approval of construction plans. Also, Board of Public Works and Safety approvals and any other governing agency approvals (if required) must be obtained prior to Engineering Department approval. The Department reserves the right to provide additional comments based on subsequent reviews. Comments generated from Crossroads Engineers review of the drainage aspects of this project will be mailed directly to you. If you have not already done so, please provide plans and drainage calculations directly to Crossroads Engineers. Continue to work with Crossroad Engineers on their review and approval. If you have questions, please contact me at 571-2441. cc: Matt Griffin, Department of Community Services Greg Hoyes, Hamilton County Surveyor's Office Greg Ilko, Crossroad Engineers Engineering Department Review Project File ( \ S:\PROJREY05\BOARDW ALKSHOPSWT3BLK2CSTP#2 , - - -~._-'-..._~---_..,.__.._-_....._--- - Post-it@ Fax Note 7671 Date 8 ". i5 To~ciaW\ ~tk From AYl Co./Dept. Co. '2 G #of ~ 2- pages Phone # Phone # II. ?-4/7 I-'?LJ-Z~ Fax # ? "1Y - IZ ~ Cf Fax # August 15,2005 VIA FAX: 574-1269 Original by mail Adam DeHart Keeler-Webb Associates 486 Gradle Drive Carmel, IN 46032 COpy RE: Carmel Science & Tech Park, Blk 2 - Boardwalk Shops (#05080019 SP & 05080020 DP/ADLS)- Secondary Plat & DP/ADLS Applications Dear Mr. Dehart: This letter is in response to your Secondary Plat & DP/ADLS Applications for Carmel Science & Tech Park, Blk 2- Boardwalk Shops. It is anticipated that you will be heard at the August 17 T AC meeting, where additional comments may be voiced. The Department cannot perform an adequate review of your petitions without submission of the secondary plat and additional exhibits. A second review letter will be sent once the Dept. receives the required items. Please complete the following: Seconcl9ry PI9t 1. A Plat has not yet been submitted. Fulfill all requirements on the Secondary Plat application checklist. 2. Please add docket no. on plat. 3. Place the flood statement on the plat. 4. Fill in all instrument nos. referred to on the plat. 5. Place the zoning, M-3/Manufacturing, on the plat. 6. Label street names and show/label the half road rights of way of Adams St. and Carmel Dr. 7. Please provide a copy of the covenants, if any. DP/ADTJS~ 8. Please submit the Findings of Fact sheet that accompanies the Development Plan Application, which can be found at http"//\V\V\V ci carmel in lls/services/f)()('s/r)OC'S i\ l1tm. Remember to include this page in your info packets. 9. Provide a photometric/lighting plan with foot-candle measurements for the whole site. 10. Provide a clearer Xerox copy of the Magnuform II (pole light) page. 11. Why won't vintage lighting be placed throughout the site? The use of two different pole lights may not be the best design choice. 12. Provide details on the lighting fixtures for the building exterior, if any. 13. Provide wall signage details/locations/colors/font. Show the maximum square footage area/rectangle per tenant on the building elevation, to show some uniformity in sign size. 14. The directory sign can only be 5-ft tall and 20 sq ft in area. Only 1 directory sign is allowed. 15. Label the center id ground sign face square footage (each sign), must be less than 30 sq ft. 16. The center id ground signs must be 10-ft from the road right of way, per Ch. 253.07.02-1 I.e. and only 1 Center id ground sign is allowed per frontage, per Ch. 25.07.02-11.b. 17. Show a landscaped area around all ground sign bases, equal to the sign square footage. Page 1 ONE CI\TIC SQU.A.RE C-L'\RL\fEL, INDL'\N-L'\ 46032 317/571- 241 7 Mr. Adam DeHart August 11, 2005 Boardwalk Shops, Lot 3, Block 2/CS&TP-Project Review #1 Page 2 of3 5. Please be advised that any installation of signs, walls, irrigation systems, etc. within dedicated right of way and/or dedicated easements will require a Consent to Encroach Agreement between the Owner/Developer and the City of Carmel. This Agreement requires Board of Public Works and Safety approval. 6. I am enclosing the following items for your use: · Commercial Project Approval Procedures. · Performance Release Procedure. · Permit Data, Contacts, etc. · Commercial Permitting Procedures. BONDING REQUIREMENTS 7. Upon initial review, it appears the following bonding requirements may apply to this project: PerCormancelMaintenance Guarantees This project may be required to provide Certified Engineer's Estimates and Performance/Maintenance Guarantees for the following improvements: · Perimeter monumentation if the monuments were not previously installed. · Perimeter concrete sidewalks/asphalt paths. · Perimeter road improvements. Provide detailed/itemized Certified Engineer's Estimates in the amount of 100% of the cost of labor and materials for the requested improvements. Provide individual Performance Guarantees in the amount of the Engineer's Estimates. When the improvements have been constructed and accepted and the Performance Guarantee is released by our BPWS, 3-Year Maintenance Guarantees will be required in the amount of 15% of the Performance amount for streets and curbs and 10% of the Performance amount for all other improvements. Street Cut/Right oCWay Permit and Bonding Requirements Any work in the dedicated right of way of Carmel Drive or Adams Street will require a Right of Way Permit. If the work is included in the scope of work of a required Performance Guarantee, a separate License and Permit Bond will not be required. If the work is not included in a Performance Guarantee, a License and Permit bond will be required. The bond amount will be determined by the number of instances of work in the right of way @ $2,000.00 per instance. Ooen oavement cuts in dedicated streets reauire aooroval hv our Board of Public Works and Safetv. Please contact Fred Glaser, Department of Engineering Right of Way Inspector/Manager for details regarding this issue. PROJECT COMMENTS-CONSTRUCTION PLANS 8. The Department of Engineering cannot support the proposed access to Adams Street as shown as it will be difficult to accommodate future improvements to the Adams Street/Carmel Drive intersection. The Department of Engineering has requested that the developer of the property to the southeast align their main access from Adams Street with the existing full access drive on Adams Street, even though the access is still closer to the Carmel Drive/Adams Street intersection than the City would otherwise consider acceptable.. The Department requires that the Boardwalk Shops development utilize the existing full access to the east. 9. Please confIrm that the five-foot wide concrete sidewalk is consistent with the Alternative Transportation Plan with the Department of Community Services. The presence of existing five- foot sidewalks in the vicinity may not meet Alternative Transportation Plan requirements, and should not be the basis for the Boardwalk Shops development to install concrete walks. 10. The bike path along Carmel Drive is indicated as concrete. This needs to be asphalt. 11. Please label the widths of all internal drives, drive aisles, alleys, and streets. 12. Please indicate and label all proposed and existing rights-of-way. 13. Any off-site easements necessary for installation of utilities must be secured 'prior to the Department of Engineering approving the drawings. 14. ADA ramps are required at all locations where the sidewalks or asphalt paths cross the streets. . CITY OF CARMEL e ZONING/ DEVELOPMENTS RECEIPT ******************************************************************************** PARCEL ID PROJECT RECEIPT # RECEIPT DATE RECEIVED BY REC'D. FROM TEST106.1 UDF 106.2 : BOARDWALK SHOPS @ NE CORNER OF CARMEL DR. AND ADAMS STREET 1609350002002000 05080020 19426 08/11/2005 ADDRESS 722 ADAMS ST PRINT DATE 08/11/2005 PRINT TIME 10:38:41 OPERATOR awold ~V~_f~\ COpy # : 1 ~)vv CASH DRAWER: PZ awold C & L MANAGEMENT, IN FEE ID UNIT QUANTITY AMOUNT PD-TO-DT THIS REC NEW BAL ---------- ---------- ---------- ---------- 875.50 0.00 875.50 0.00 ---------- ---------- ---------- ---------- 875.50 0.00 875.50 0.00 ---------- ------------- ---------- P-SECPLAT LOTS 1.00 TOTAL PROJECT : METHOD OF PAYMENT AMOUNT NUMBER CHECK TOTAL RECEIPT : 875.50 8016 ------------ ------------ 875.50 . ZONING/ DEVELOPMENTS RECEIPT CITY OF CARMEL -- ******************************************************************************** PARCEL ID PROJECT RECEIPT # RECEIPT DATE RECEIVED BY REC'D. FROM TEST106.1 UDF 106.2 NOTES : BOARDWALK SHOPS DP/ADLS @ CORNER OF CARMEL DR & ADAMS ST 1609350002002000 05080019 19427 08/11/2005 awold C & L MANAGEMENT INC FEE ID UNIT QUANTITY ---------- ------------- ---------- P-ADLS ACREAGE 2.63 P-DP ACREAGE 2.63 TOTAL PROJECT : METHOD OF PAYMENT AMOUNT CHECK CHECK TOTAL RECEIPT 1043.39 650.45 ------------ ------------ 1693.84 ADDRESS 722 ADAMS ST PRINT DATE 08/11/2005 PRINT TIME 10:43:31 OPERATOR a1wold ~"{-""n.."'~ COpy # : -r\ -y~-- CASH DRAWER: PZ AMOUNT PD-TO-DT THIS REC NEW BAL ---------- ---------- ---------- ---------- 650.45 0.00 650.45 0.00 1043.39 0.00 1043.39 0.00 ---------- ---------- ---------- ---------- 1693.84 0.00 1693.84 0.00 NUMBER 8017 8018