Loading...
HomeMy WebLinkAboutGEICO Com Check Signed Applied Engineering_20140224_083536.pdf'• • i , • Interior Lighting and Power Compliance Certificate 90.1 (2007) Standard Section 1: Project Information Project Type: Alteration Project Title : Technicolor Building Construction Site: 101 West 103rd Street Carmel, IN Owner/Agent: Derrick Millard GEICO 4608 Willard Avenue Chevy Chase, MD 20815 Section 2: Interior Lighting and Power Calculation Designer/Conhactor: Tim Anderson Applied Engineering Services 9100 Keystone at the Crossing Sutie 200 Indianapolis, IN 46240 317-810-4141 tanderson@a ppl ied-e-s. com A B C D Area Category Floor Area Allowed Allowed Watts (ft2) Watts / ft2 (B x C) Common Space Types:Office - Open Plan 31480 1.1 34628 Common Space Types:Classroom/LecturelTraining 567 1.4 794 Total Allowed Watts = 35422 Section 3: Interior Lighting Fixture Schedule A B C D E Fixture ID : Description / Lamp / Wattage Per Lamp / Ballast Lamps/ # of Fixture (C X D) Fixture Fixtures Watt. Common Space Types:Oftice - Open Plan (31480 sq.ft.) . � Linear Fluorescent 1: 48" TS 32W: Electronic: 3 266 108 28728 Common Space Types:Classroom/Lecture/Training (56T sq.ftJ � � Linear Fluorescent 2: 48" T8 32W: Elechonic: 3 6 108 648 Total Proposed Watts = 29376 Section 4: Compliance Statement Compliance Statement: The proposed lighting design represented in this document is consistent with the other calculations submitted with this permit application. The proposed lighting system has been designed requirements in COMcheck Version 3.92 and to comply with the mandatory reqyyirements in the Requiren �'Lf�G��i �'O�ut3l� %?�, p12i��ci�°l?Z Name - Title � Section 5: Post Construction Compliance �ecord Drawings and Operating and Maintenance Manuals: Construction documents with record drawings and operating and m'�ir �nance manuals provided to the owner. !a'r;Po��{ �wt�t� rG Pl�n�c,f�n. �.��Y�,t�/y Project Title: Technicolor Building �-� Report date: 02/22/14 Data filename: G\Projects\14-026 Irish Mechanical - Regional Call Center Phase III\Construction Admin\geico phase Ill.cck Page 1 of 2 Lighting Designer or Contractor Name Signature Date Project Titie: Technicolor Building Report date: 02/22/14 Data filename: G:\Projects\14-026 Irish Mechanical - Regional Call Center Phase III\Construction Admin\geico phase Ill.cck Page 2 of 2 ��� � • • • '` Inspection Checklist Requirements: 86.0% were addressed directly in the COMcheck software Text in the "Comments/Assumptions" column is provided by the user in the COMcheck Requirements screen. For each requirement, the user certifies that a code requirement will be met and how that is documented, or that an exception is being claimed. Where compliance is itemized in a separate table, a reference to that table is provided. � 1�High Impact (Tier 1)�2 Medium Impact (Tier 2) � 3 Low Impact (Tier 3) Project Title: Technicolor Building Report date: 02/22/14 Data filename: G:\Projects\14-026 Irish Mechanical - Regional Call Center Phase III\Construction Admin\geico phase Page 1 of 4 I I I.cck 90.1 (2007) plan Review Complies? Comments/Assumptions Standard 4.2.2 ''� Plans, specifications, and/or calculations Complies : Requirement will be met. [PR4]' �� provide ell informaCion with which '�Does Not Comply � ; compliance can be determined for the i❑Not Observable I ; lighting and electrical systems and ���Not Applicable '� '� equipment and document where exceptions � ; to the standard are claimed. Information i provided should include interior lighting ; power calculations, wattage of bulbs and . i ballasts, transformers and control devices. ; 8.4.1.1, ; Plans, specifications, and/or calculations Complies ', Requirement will be met. 8.4.12 j provide all information with which �❑Does Not Comply'� [PR6]� ; compliance can be determined for the I❑Not Observable ; � electrical systems and equipment and ;�Not Applicable � document where exceptions are claimed. ; ; Feeder connectors sized in accordance ', :.with approved plans and branch circuits I I -� sized for maximum drop of 3%. ' Additional Comments/ASSUmptions: 1 High Impact (Tier 1) 2 Medium Impact (Tier 2)_ 3 Low Impact (Tier 3) Project Title: Technicolor Building Report date: 02/22/14 Data filename: G:\Projects\14-026 Irish Mechanical - Regional Call Center Phase III\Construction Admin\geico phase Page 2 of 4 Ill.cck 90.1 (2007) Rough-In Electrical Inspection Complies? Comments/Assumptions Standard 9.4.1.1 ; Automatic conlrols to shut off all building Complies ', Requirement will be met. [EL1]� � lighting installed in buildings >5,000 ft2. ��❑Does Not Comply� . I :�Not Observable I ;❑ otApplicable 9.4.1.2 ; Independent lighting controls installed per I Complies ; Requirement will be met. [EL2]� � approved lighting plans and all manual IDDoes Not Comply j � conhols readily accessible and visible to ;�Not Observable I ;occupants. '❑ otApplicable 9.4.1.4 I Separate lighting control devices for specificl�omplies i Requirement will be met. [EL4]' I uses installed per approved lighting plans. '�❑DOes Not Comply� �❑Not Observable I ; ;❑Not Applicable 9.42 ; Ballasted one and three lamp fixtures with '�Oomplies ; Exception: Electronic high-frequemcy bal�asts. [EL5ja i>30 W/lamp have two lamp tandem wired ��❑Does Not Complyj � ballasts when >=2 fixtures in same space ;�Not Observable ! jon same controL j� ot Applicable � 9.4.3 I Exit signs do not exceed 5 watts per face. Complies �I Requirement will be met. [EL6]� '� ��Does Not Comply��� I❑NotObservable � ��,❑NotApplicable _ ___ _ 9.62 '�� Additional interior Iighting power allowed for �I�@—Complies ; Requirement will be met. [EL8]' '� special functions per the approved lighting !❑Does Not Comply'�� ; plans and is automatically controlled and ,�Not Observable I !separatedfromgenerallighting. !❑NotApplicable � Additional Comments/Assumptions: 1�High Impact (Tier 1) 2 Medium Impact (Tier 2) 3�Low Impact (Tier 3) Project Title: Technicolor Building Report date: 02/22/14 Data filename: G:\Projects\14-026 Irish Mechanical - Regional Call Center Phase III\Construction Admin\geico phase Page 3 of 4 Ill.cck 90.1 (2007) Final Inspection Complies? Comments/Assumptions Standard 8.7.1 ; Furnished as-built drawings for electric ' Complies �,' Requirement will be met. [FI16]' � power systems within 30 days of system i❑ Does Not Comply �� !acceptance. I❑NOtObservable I � ❑ otApplicable 87.2 ; Furnished O&M instructions for systems��mplies Requirement will be met. [FI17]' � and equipment to the building owner or �❑DOes Not Comply'� ;designatedrepresentative. �❑NotObservable I ',❑ otApplicable � 92.2.3 ; Interior installed lamp and fixture Ilghting Complies ; See fhe InteriorLighting fixture schedule for values. [FI1S]' �i power is conaisCent wRh whaC is shown on �❑Does Not Comply� ��; the approved lighting plans, demonstrating ;�Not Observable I ., proposed watts are less than or equal to ��Not Applicable � � allowed watts. Additional Comments/Assumptions: 1 High Impact (Tier 1) 2 Medium Impact (Tier 2) 3 Low Impact (Tier 3) Project Title: Technicolor Building Data filename: G:\Projects\14-026 Irish Mechanical I I I. cck Report 02/22/14 Regional CaII Center Phase III\Construction Admin\geico phase Page 4 of