HomeMy WebLinkAboutMechanical COMcheck.pdf/»:
; ¢=.
� �.
���;11�/r: y • . �' • •
Mechanical Compliance Certificate
90.1 (2007) Standard
Section 1: Project Information
Project Type: Alteration
Project Title :
Construction Site: Owner/Agent:
Section 2: General Information
Building Location (for weather data): Carmel, Indiana
Climate Zone: 5a
Section 3: Mechanical Systems List
uantit Svstem Type & Description
1 HVAC System 2:
Heating: 3 each - Other, Electric, Capacity = 31 kBtu/h
Cooling: 1 each - Hydronic Coil, Capacity Unknown
Fan System: Unspecified
Exemption: Modification or repair without energy use change.
Section 5: Compliance Statement
Designer/Contractor:
Compliance Statement: The proposed mechanical alteration project represented in this document is consistent with the building plans,
specifications and other calculations submitted with this permit application. The proposed mechanical alteration project ha �,����� ned to
meet the 90.1 (2007) Standard, Chapter 8, requirements in COMcheck Version 3.9.2 and to comply with the mandat� ��,�u�i �a'Pef?�
.�?�� °jo
Requir�eme�nts Checkl' t. ^ti ����a�o�����°��'�°f e,,, ��1�°i,��
�,/ ,� Q „" ' ���
�fd �"�.� / �" /..,�^-�---- i . �" ',/ , ^ � �;' `��° `"�, p%, �`°•s '�
.!% �' .G��M� �
Name - Title ignature i�a� m� ��� s�
'-, � m :
"'���" �°Ef$T� �� °� �
Section 6: Post Construction Compliance Statement {�����`�� �
.:� � a ��,o.o°`°� ,�°
�.;����`°���!����� •�• �'����
� system accepta ce gs of the actual installation and performance data for each equipment provided to the ow���9�D�d���A���6������Q�e`',�¢°t�'
� HVAC O&M documents for all mechanical equipment and system provided to the owner within 90 days after system acceptance.
� Written HVAC balancing report provided to the owner.
p
The above post construction re jre ents have been completed.
"'' � ,r '��" � �� ��°� � ' di-._...-� -.., ,..�
Principal Mecha cal Designer-Name Signat e Date
Project Title: Report date: 02/21/14
Data filename: Untitled.cck Page 1 of 1