Loading...
HomeMy WebLinkAboutATC-E1 1.pdfSMOKE DETECTOR, 120 VOLT, WITH BATTERY. INTERCONNECTED SYSTEM FIRE ALARM HORN / STROBE WEATHERPROOF SYSTEM FIRE ALARM HORN / STROBE SYSTEM FIRE ALARM PULL STATION WP G DUPLEX RECEPTACLE 30 AMP RECEPTACLE, 240V SINGLE POLE SWITCH THREE WAY SWITCH DISCONNECT TELEPHONE, TV, AND DATA, (1) RG-6 Coax, 2-Cat5E 1S 3S E1.1 FIRST FLOOR LIGHTING PLAN AND ELECTRICAL SCHEDULES E1.2 FIRST FLOOR POWER AND SYSTEMS PLAN 30 SWITCHED RECEPTACLE, TOP HALF OF RECEPTACLE TS TIMER SWITCH GFI RECEPTACLE WEATHERPROOF GFI RECEPTACLEG 50 AMP RECEPTACLE, 240V50 DEDICATED DUPLEX RECEPTACLED J JUNCTION BOX BB Sprinkler Room w/THERMOSTAT. TPI E3321T20-RP w/3310 Rough In Box UH ELECTRIC WALL HEATER w/THERMOSTAT: TPI F3326T20-RP w/ 3320 EX33 Box TV Location (1) RG-6 CoaxTV SYSTEM SMOKE DETECTOR WITH RELAY BASE. SYSTEM SMOKE DETECTOR R A A IN UNITS WP FIRE ALARM SYSTEM CONTROL PANEL FIRE ALARM SYSTEM ANNUNCIATOR PANEL TS FS TAMPER SWITCH MONITOR MODULE FLOW SWITCH MONITOR MODULE FOUR-WAY SWITCH4S TELEPHONE AND DATA DB Door Bell Button Door Bell Chime V Strobe Only Trans Transformer By Utility Company 1. WORK SHALL INCLUDE STARTUP OF ALL SYSTEMS, FURNISHING OF OPERATING AND MAINTENANCE INSTRUCTIONS AND ONE YEAR GUARANTEE COMMENCING ON DATE OF PROJECT ACCEPTANCE. 2. VERIFY LOCAL CONDITIONS AT SITE. 3. COMPLY WITH ALL APPLICABLE CODES. 4. SECURE AND PAY FOR ALL REQUIRED PERMITS AND SUPPLY TO G.C. PRIOR TO STARTING WORK. 5. ELECTRICAL SYSTEM SHALL BE GROUNDED IN ACCORDANCE WITH THE LATEST REQUIREMENTS OF THE N.E.C.. SYSTEM SHALL BE GROUNDED TO THE COLD WATER SERVICE AND TO THE BUILDING STEEL. FURNISH AND INSTALL A GROUND JUMPER WIRE ACROSS WATER METER. 6. ALL CONDUCTORS SHALL BE COPPER. 7. FURNISH AND INSTALL TYPE TRITTEN PANEL DIRECTORY. IDENTIFY AND LABEL ALL ELECTRICAL SERVICE EQUIPMENT INCLUDING METERS WITH UNIT #'S AND ADDRESS. 8. CONNECT TELEPHONE AND TELEVISION SYSTEMS PER LOCAL UTILITY REQUIREMENTS VERIFY LOCATION AND TYPE OF EQUIPMENT REQUIRED WITH ARCHITECT AND OWNER. FAN Circulating Fan by Mechanical Contractor, Provide Dedicated Circuit. 1. AT THE MINIMUM: OFFICE SHALL HAVE 2 DUPLEX AND 2 DATA. VERIFY LOCATION WITH OWNER. 2. ALL CIRCUITS WILL BE RAN FROM EXISTING CIRCUITS IN MECHANICAL ROOM 122 AND 125. H Horn Only W-H Wall Heater F3 F3 F3 F3 F3 F3 F3 F3 F3 F3 F3 F3 F3 F3 F3 F3 F1 F1 F1 F1 F1 F1F1 F1 F1 F1F1 F1F1F1 F1F1F1 F1F1 F1 F1 F1 F1 F1 F2 F2F2 F4 F4A M 1 1 1 1 1 1 2 2 FI R S T F L O O R LI G H T I N G P L A N MU 92  $ #       $# &'5%4+26+10 &#6' E1 . 1 25 5 E a s t C a r m e l D r Ca r m e l , I N 4 6 0 3 2 Co o t s , H e n k e & W h e e l e r Me d i a t i o n W i n g