Loading...
HomeMy WebLinkAboutMinutes of Meeting 09-15-83 FED dEnign Alternative Concepts Inc. Architects o Planners Raymond J. Schultz,AIA Re: Site and Parking Requirements for Ritz Charles Banquet Facilities, MINUTES OF MEETING Date: September 15, 1983 Time: 4:20 p.m. Location: Office of Mr. Charles Kiphart Carmel City Hall Present: Ray Schultz Joe Raper Charles Kiphart • A. Mr. Kiphart, brought to our attention the possiblity of sewers being brought down Meridian within the next two years. He recommended we contact Lynn Wolfson (at 844-4621) who is organizing the owners in the area to get the project going. B. Mr. Schultz explained to Mr. Kiphart the current state septic and Carmel parking requirements on the site. Ray proposed building only 120 parking spaces because the banquet facility will only be operating in 12,000 sq. ft. of the 15,000 sq. ft. being built. This would allow us to develop part of the parking as septic field. Mr. Kiphart states that this would be acceptable contingent on the following requirements: 1.. A legal binding agreement would be entered into with the Owner, the County Health Dept. and the Carmel Plan Commission , .. which would require that the 3,000 sq. ft. remain unused until sewers are installed. 2. When the sewers are installed the facility would hook-up immed- iately and abandon the septic fields. % . - 3. - ,Before the. empty 3,000, sq. ft. can be used the remainder'of,the required 150 spaces will be installed in the areas of the now abandoned septic fields . C. The sequence of the Plan Commission Approvals was discussed and is as Follows: 1. Provide the completed application forms, drawings and check 12 days prior to the scheduled Plan Commission meeting. (Oct. 6) 2. Plan Commission Meeting is scheduled for Oct. 18. At this meeting we shall make our formal presentation. 3. After our presentation the Plan Commission shall refer 3600 Woodview Trace, Suite 201 Indianapolis, IN 46268 (317) 875-8377 .. NYC .: — •rte:_-- � _" �_�.._.s. _. . . .w, ._,_.. �. ._ . 3 _� PHD diion Ritz Charles Banquet Facilities ' Page #2 our application'-to-the Techical Advisory Committee for review. At this time working drawings, calculations and specifications for the site development will be given to the committee. The Techical Committee will meet October 20. 4. The Techical Committee shall review and forward our application to the Industrial / Commercial Subcommittee for their review. They are currently scheduled to meet November 1. 5. All committees shall report their findings back to the Plan Commission by November 15. The Commission shall then vote final approval on that date. 6. November 16th is the soonest possible construction date. 7. It should be noted that the following approvals must be obtained on these additional items concurrently with the Carmel Plan Commission approvals. a. Septic System Permit (State Health Dept. ) b. Storm Drainage Permit (State Highway Dept. ) c. Commercial Drive Permits (State Highway Dept. ) d. Foundation Permit (ABC) D. Mr. Kiphart reviewed the preliminary site plan and noted the following items: 1. All parking lots in the Meridian Corridor must have concrete curbs around their entire perimeter. 2. If the Chiropractic Office is also a residence, then B-6 zoning requirement of a 30' lawn buffer area must be met. E. Joe Raper called the Hoff Chiropractic Clinic at 8:00 p.m. and an answering machine answered the phone. (Phone # 848-1727) • - END OF MINUTES OF MEETING- Distribution: All parties attending George P. Sweet Chuck Lazzara