HomeMy WebLinkAboutMinutes TAC 11-17-83 ., -
•
TECHNICAL ADVISORY COMMITTEE
MINUTES
November 17, 1983
Committee Members Present: Tom Welch, Kurt Woerner, John South, Stan Puckett,
Boone Clark, Kent Ward, Chuck Kiphart, and Randy Powell
1. CRYSTAL FLASH .
Petitioners Present: Bill Waddick, Greg Cobb
4' x 10' dock
14' clear between truck and curb for passing
Fire extinguisher to be located on dock
Received T.A.C. approval contingent on 10# ABC fire extinguisher on dock.
2. DESIGN WOODWORKING 941 S. Range Line Rd.
Petitioner Present: Steve Sturtz
Entrance curbs to be unchanged
Parking lot drainage -- depress lot at NW corner for drainage
Direct rear drive drainage & garage to front parking area detention. Show flow
arrows. Show curb elevation at NW corner and limit of detention area.
Verification of availabilities from Board of Public Works needed.
Received T.A.C. approval subject to above.
3. BEVERLY ENTERPRISES S.E. Corner of W. Main Street & Pennsylvania Road
Petitioner Present: Mike Comparato, Richard DiLiberty, Al Oak, Joe Sharp.
Proposed rezone from S-2 to B-2 & R-5
9 acres to B-2, 16.3 acres to R-5
Development plan under Planned District regualtions will apply to both parcels.
Penn Road to improved float Main Street south to south property line of project.
City of Carmel standards will apply to Penn Road improvement.
85 Town house units on 16.3 acres (R-5 zoning)
215 Apartments & 59 bed health care facility in retirement center on 9 acres
(B-2 Zoning)
No direct access between project phases.
Sewer - City of Carmel (Annexation anticipated)
Water - Untetermined (Carmel or Indianapolis)
2:5 acre retention pond to discharge to south with eventual outlet at Fertig
Drain.
Letter from property owner to south (currently George Sweet) accepting storm
runoff.
TAC MINUTES CONTINUED ; +
November 17, 1983
continued
BEVERLY ENTERPRISES
20' perimeter easement for drainage and utilities required. (Utility facili-
ties restricted to underground installation) .
Future parking area to be developed by a definite date or a variance will
be required.
Pipe inlets on north side of property will extend to property line.
• Flood routing needs to be shown
Storm sewer system will be required to continue to south as ground develops.
• Accel-Decel lanes required at all curb cuts on Penn Road and Main Street.
▪ Penn Road R-O-W - 35' each half. (70'total )
• Relocate fire hydrants per Fire Chief's recommendation.
Sign plan to be developed by November 22, 1983 Committee Meeting.
• Lighting plan - OK
T.A.C. recommendation - Approval subject to above revisions being incorporated.
4. RITZ M • • �.
•- _-•T=ry° esent: Chuck Lazarra, Jim Wheeler, Ray Shoals
Septic system subject to review by Hamilton Co. Health Dept.
• Lighting Plan - OK
Drainage: Detention area limits need to be shown. Storm water flow direction
must be shown. Storm water run-off goes to U.S. 31 roadside ditch
(details of ditch needed.) Subserface drain needed along south &
west property lines. Swale on north property line to extend west
to high point.
▪ Finish Floor Elevation: 861.00
20' perimeter easement needed along south, west, and north lines.
Agreement to connect sanitary sewer if within 300' of property line (per
Hamilton county Ord.)
Carmel Fire- Chief and State Fire Marshal approval required for fire protection
system.
Sign - Landscape plans - OK
State approval required for curb cuts.
T.A.C. recommendation - Meets technical requirements received approval to sub-
.
ject above.
r .{
TAC MINUTES CONTINUED
November 17, 1983
5. UNION STATE BANK 20 First Avenue N.E.
Petitioners Present: Jim Nelson Attorney
Delete parking along south side.
Landscaping along north line per review by C. Kiphart.
T.A.C. recommended approval based on above.
6. CURRISE & CARLSON
Petitioners Present: Al Carlson, Bill Currise, and Jim O'Hara
Drainage: Effective drainage system must be approved by appropiate T.A.C.
members.
Septic system must be approved by Hamilton County Health Department.
7. THISTLEWOCD, SECTION I
Petioners Present: Bob Langston and Stan Neal
Need construction details (cross section & profile) of detention area.
Concrete ditch required in detention area. Detention to be completed
prior to building permits being issued.
Fire department review and approval of hydrant plan needed.
Storm sewer system will be regulated drain.
Sanitary system bonds will run to City of Carmel
Petitioner to request variance from sidewalk requirement in subdivision
regulations. Preliminary plat indicates sidewalks.
Proposed project meets techinical requirements.
T.A.C. recommends approval subject to above amendments.
8. ST. ELIZABETH SETON CATHOLIC CHURCH
Petioners Present: George Rafferty, Will Wright, and Steve Witte
Church requests phased development.
Phase I involves defering some improvements.
Items to be deferred are:
1. Ground sign at 106th Street entrance. -• -
2. Some sidewalks and brick retaining wall around building and
Terrace.
3. Tree grates at main entrance.
4. East service road form 106th Street.
5. Sidewalks form Haverstick Road to main building.
6. Sidewalks on other property on Haverstick Road.
7. North parking lot (48 spaces) .
8. Revise curb design in parking lots and drives.
9. Soccer field drainage until soccer field is built.
10. Drainage pipe from north parking lot to first inlet.
11. Culvert under service road at 106th Street.
12. Bollard lights in main parking lot. Pole lights will stay.
13. Four (4) pole lights on access road.
14. Lighting in north parking lot.
15. Underground water storage tank.
TAC MINUTES CONTINUED
November 17, 1983
continued
ST. F.T,TZABETH SENTON CATHOLIC CHURCH
Phasing of landscaping to be worked out with C. Kiphart. Landscaping
along north to be planned so as not to interfere with ditch maintenance.
T.A.C. see no problems with deferring these items.