HomeMy WebLinkAbout2012 Sewer Bond pay request 27 carmel
City of Carmel Utilities
760 Third Avenue S.W.,Ste.110•Carmel,IN 46032
Phone:(317)571-2443•Fax(317)571.2265
www.carmel.in.gov
EXHIBIT B
Disbursement Direction#27
E-Mail or FAX the signed Disbursement Direction to:
The Huntington National Bank Corporate Trust Department (INHP22)Attn: Kim Wilson Tel: (317)229-
4094 Fax: (317)229-4094 E-Mail: Kim.Wilson(w.huntington.com
Re: Depositary Agreement between the City of Carmel and The Huntington National Bank,
dated May 16, 2012 -Trust#4087000067
Dear Kim:
On March 26, 2014 ,you are hereby authorized and directed, as the Depositary under the above-
referenced Agreement, to pay the amounts set forth on the attached Register of Claims from the above-
referenced Trust account and overnight checks to:
Carmel Utilities
Attn: Lisa Kempa
30 West Main Ste 220
Carmel, IN 46032
City of Carmel, Indiana
By:
Name: Diana L. Cordray Title: Clel-Treasurer
(*)Your Alternate contact at Huntington National Bank will be:
Ellen Campbell-Tel# (616) 235-5941 Ellen.Campbell @huntington.com
CARMEL UTILITIES
Register of Claims
3/26/2014
PAYMENT REQUISITION NO 27
AMOUNT OF Wire
VENDOR ADDRESS FUND CLAIM MEMORANDUM Instructions
4801 Tazer Dr
BL Anderson Lafayette,IN 47996 Cons $ 11,074.00 pump
30 W Main St Ste 220
Carmel Utilities Carmel, IN 46032 Cons $ 25,257.48 reimbursement
2207 Collections
Center Dr Chicago,IL
Hach Chemical Co 60693 Cons $ 1,940.00 testing
3103 Executive
Parkway Ste 300
Jones&Henry Engineers Toledo,OH 43606 Cons $ 12,747.00 engrg services
3103 Executive
Parkway Ste 300
Jones&Henry Engineers Toledo,OH 43606 Cons $ 9,030.68 engrg services
3103 Executive
Parkway Ste 300
Jones&Henry Engineers Toledo,OH 43606 Cons $ 6,440.00 engrg services
PO Box 2533
MK Betts Engineering Anderson, IN 46018 Cons $ 209,620.00 construction
2106 Ohio Avenue
Nugent Electric Anderson, IN 46016 Cons $ 19,680.00 services
1625 North Post Road
United Consulting _Indianapolis, IN 46219 Cons $ 190.00 services
TOTAL $ 295,979.16
ALLOWANCE OF CLAIMS
We have examined the claims listed on the foregoing Register of Claims,consisting of 1 page,and except for claims not allowed as
shown on the registe suc•.:ims are hereby allowed in the total amount of $295,979.16 Joh, 0u ' ility liior ALLA(
e
PLEASE OVERNIGHT CHECKS TO:
Carmel Utilities
Attn: Lisa Kempa
30 West Main St Ste 220
Carmel,IN 46032
B L Anderson Co., Inc.
Invoice 4801 Tazer Drive
Lafayette IN 47945
765-463-1518 phone
765-446-8390 fax
www.blanderson.com
yr 4A
yf,...� E 4��DERSO,
Date ' Invoice#
2/6/2014 1 -21950
Bill To • Ship To
CARMEL WASTEWATER CARMEL WASTEWATER
9609 1-IAZEL DELL PKWY 9609 1-IAZEL DELL PKWY
INDIANAPOLIS,IN 46280-2935 INDIANAPOLIS, IN 46280-2935
ATTN: PAUL ARNONE
P.O. Number Terms Rep Ship Date Project
513805 Net 30 RI-IK 1/28/2014
Quantity Item Code Description Price Each Amount
1 Non Inventory Equipment LOT OF EQUIPMENT CONSISTING OF: (1)500 GPM D4K-1-IW 11,074.00 11,074.00
HORIZONTAL PUMP AND ACCESSORIES
Overdue balance will
accrue interest at the rate of
1-1/2%per month
compounded plus legal and
collection fees.
Total $11,074.00
City of Carmel -Water Utility
In first quarter 2014 approximately 1/2 of Aaron Hoover's time was devoted to the Sewer Rehab project.
In that same time frame approximately 75%of Curtis Manifold's time was devoted to the Plant Expansion
project.
Employee A. Hoover C. Manifold
Biweekly Salary 2,482.14 1,894.74
Biweekly PERF 347.50 265.26
Biweekly Medical Insurance 957.00 639.25
Monthly Life Insurance 7.50 7.50
Monthly Short Term Disability 1820 13.41
F.I.C.A. 189.88 144.95
Annualized:
Salary 64,535.64 49,263.24
PERF 9,035.00 6,896.76
Medical 24,882.00 16,620.50
Life 90.00 90.00
Short Term Disability 218.40 160.92
F.I.C.A. 4,936.88 3,768.70
Annual Salary& Benefit Cost 103,697.92 76,800.12
Hourly Salary& Benefit Cost 53.1784 39.3847
cYci of salary to project 50.00% 75.00%
# pay periods in quarter 6 6
Labor cost to project 11,965.14 13,292.34
Journal Entry Debit Credit
09.1050.63 13,292.34
09.1050.86 11,965.14
01.7010.01 3,723.21
01.7010.02 3,723.21
01.7012.06 8,526.33
01.7040.01 1,974.53
01.7040.02 1,974.54
01.7042.06 4,113.75
01.4080.12 1,221.9 `v' , a� ,, ,, ii
01.1420.00 25,257.48 Vt� ►iV" l• Y
09.2331.00 25,257.48
t S
50,514.96 50,514.96
2014 Journal Entries,1st Qtr Sewer projects labor 3/21/2014,10:15 AM
�k F� :•. Q INVOICE NUMBER 8701328
h`rl Ac DATE: 02!15!2014
Page: 1
Be Right-
Q TACft tI TO PPORTl01 RM 3 URSI AyITH 7ENT O TOTAL: $1,940.00
• 4,2
Hach Company
2207 Collections Center Drive
Chicago, IL 60693 Have you ordered online ?
Phone: (800) 227-4224 Order al WWW.HACH.COM
87013280 008330458 00000194000 021514
Sort Seg: 976 Tray: 12 DETACH HERE Original
INVOICE NO 8701328 1 DATE: I 02/15/2014
s 'll
illhip11111111111111111111111111111111119111111111111 PURCHASE
ORDER
O
L CITY OF CARMEL NUMBER
D Wastewater Treatment Plant Net 45 Days From Invoice Date
760 3rd Ave SW TERMS
T Carmel, IN 46032-2072 _
O United States FREIGHT
s CARRIER
H CITY OF CARMEL ACCOUNT 833045
760 3RD AVE SW REF. NO. HACH248387 'Remit to:
P WASTEWATER TREATMENT PLANT Hach Company
CARMEL, IN 46032-2072 2207 Collections Center Dr
T United States Chicago,IL 60693
0
Phone:(800)227-4224
These commodities are sold,packaged,marked,and labeled for destinations in the United States. Exportation of these commodities may require special licensing,packaging,marking or labeling
LN# PRODUCT DESCRIPTION ITEM NO. QUANTITY UNIT PRIG EXT. PRICE
1 DDS SERVICE LEVEL 2 MID TERM Monthly DDS-SL2-MT 1 970.00 970.00
C h a rg e:1::11/15/2013:0 5/14/2 014
2 DDS SERVICE LEVEL 2 MID TERM Monthly DDS-SL2-MT 1 970.00 970.00
Charge:1::11/15/2013:05/14/2014
ORDER CONTACT: SUBTOTAL 1,940.00
TAX 0.00
Notes: INVOICE TOTAL 1,940.00
PURCHASE AND ACCEPTANCE OF PRODUCT(S)SUBJECT TO HACH COMPANY'S TERMS AND CONDITIONS OF SALE,
PUBLISHED ON HACH COMPANY'S WEBSITE AT WWW.HACH.COM/TERMS
For order discrepancies or product exchanges please call 800-227-4224 or 970-669-3050 to obtain Return Authorization.
FEDERAL TAX ID#42-0704420
' Tn,r ov smen emnt al i. ACf €°m
H C"hT- Other brands
R from Hach
"-�� Hydrerrtet Flow Products&Services
r'.
e Jones & Henry Engineers, Ltd.
•
3103 Executive Parkway, Suite 300
Toledo, Ohio 43606
mid TN aine
419.473.9611
CITY OF CARMEL Invoice number 64182
MR. JOHN DUFFY Date 02/11/2014
UTILITY DIRECTOR
30 WEST MAIN STREET SUITE 220 Project 00451-6733 106TH ST. PUMP STATION
CARMEL, IN 46032 INTERCEPTOR
Professional services performed through January 31,2014
Professional engineering services in connection with the design and construction of capacity improvements to
the 106th St. Pump Station and the North-South Interceptor in conformance with our agreement no.4-12.
The project fee is$280,000.
9-001 PUMP STATION IMPROVEMENTS
Labor
Billed
Units Rate Amount
SENIOR ENGINEER 37.00 105.00 3,885.00
TECHNICIAN 80.50 69.00 5,554.50
Labor subtotal 117.50 9,439.50
Phase subtotal 9,439.50
9-002 N-S INTERCEPTOR
Labor
Billed
Units Rate Amount
SENIOR ENGINEER 20.00 105.00 2,100.00
TECHNICIAN 17.50 69.00 1,207.50
Labor subtotal 37.50 3,307.50
Phase subtotal 3,307.50
Invoice total 12,747.00
Contract Summary
Contract Prior Current Total
Description Amount Billed Billed Billed
9-001 PUMP STATION IMPROVEMENTS •
9-002 N-S INTERCEPTOR
9-003 CONSTRUCTION
Total 280,000.00 171,477.15 12,747.00 184,224.15
Thank you for your business.
Page 1
Jones & Henry Engineers, Ltd.
3103 Executive Parkway, Suite 300
a _
Toledo, Ohio 43606
""°'i Henry Ereneen,Ltd. 419.473.9611
CITY OF CARMEL Invoice number 64181
MR. JOHN DUFFY Date 02/11/2014
UTILITY DIRECTOR
30 WEST MAIN STREET SUITE 220 Project 00451-6531 WWTP SECONDARY
CARMEL, IN 46032 EXPANSION
Professional services performed through January 31,2014
Professional engineering services in connection with a new final calrifier, septage receiving, belt filter press,
diversion structure covers and modifications to final clarifier 1 in conformance with our Letter Agreement No. 1-
12 as authorized by Professional Services Agreement dated November 3,The projected fee is$386,000.
9-001 DSGN-SECONDARY EXPANSION
Reimbursable
Cost Billed
Amount Multiplier Amount
MAILING COST/UPS COSTS 6.68 6.68
9-002 CONST-SECONDARY EXPANSION
Labor
Billed
Units Rate Amount
CONSTRUCTION SERV SPECIALIST 24.00 84.00 2,016.00
PRINCIPAL 27.00 139.00 3,753.00
SENIOR ENGINEER 31.00 105.00 3,255.00
Labor subtotal 82.00 9,024.00
Phase subtotal 9,024.00
Invoice total 9,030.68
Contract Summary
Contract Prior Current Total
Description Amount Billed Billed Billed
9-001 DSGN-SECONDARY EXPANSION
9-002 CONST-SECONDARY EXPANSION
Total 386,000.00 350,310.07 9,030.68 359,340.75
Thank you for your business.
Page 1
ors ,�.:
J Jones & Henry Engineers, Ltd.
3103 Executive Parkway, Suite 300
Toledo, Ohio 43606
�n 419.473.9611
CITY OF CARMEL Invoice number 64183
MR. JOHN DUFFY Date 02/11/2014
UTILITY DIRECTOR
30 WEST MAIN STREET SUITE 220 Project 00451-6770 SEWER REHAB
CARMEL, IN 46032
Professional services performed through January 31,2014
Professional engineering services in connection with the review and evaluation of the collection system and
assistance during sewer rehabilitation projects in conformance with our agreement No.4-12.
The project fee is$130,000.
9-001 SEWER REHAB
Labor
Billed
Units Rate Amount
ADMINISTRATIVE ASSISTANT 1.00 40.00 40.00
CONSTRUCTION SERV SPECIALIST 20.00 87.00 1,740.00
PRINCIPAL 10.00 142.00 1,420.00
SENIOR ENGINEER 26.00 3,240.00
Labor subtotal 57.00 6,440.00
Phase subtotal 6,440.00
Invoice total 6,440.00
Contract Summary
Contract Prior Current Total
Description Amount Billed Billed Billed
9-001 SEWER REHAB
Total 130,000.00 98,213.98 6,440.00 104,653.98
Thank you for your business.
Page 1
APPLICATION AND CERTIFICATE FOR PAYMENT A!A DOCUMENT 6702 (Instructions on reverse side) PAGE ONE OF PAGES
TO (OWNER): City of Carmel PROJECT: Final Clarifier & Misc. APPLICATION NO: Twelve (12Q)istribution to:
Once Civic Square Improvements – Contract 79 G OWNER
Carmel, IN 46032 - PERIOD TO: 02/28/14 C ARCHITECT
.y,y ��.,{.s��.�y.�
D CONTRACTOR
FROM (CONTRACTOR): VIA (ARre.1 *1€ "l T: ARCHITECTS E
M. K. Betts Engineering Engineer: Jones & Henry Engineers PROJECT NO: C
& Contracting, Inc.
CONTRACT FOR: Invoice 13-124.12 CONTRACT DATE:
• Application is made for Payment, as shown below, in connection with the Contract.
CONTRACTOR'S APPLICATION FOR. PAYMENT Continuation Sheet, MA Document G703, is attached.
CHANGE ORDER SUMMARY 1. ORIGINAL CONTRACT SUM $ 3,423,000.00
•
Change Orders approved in I ADDITIONS DEDUCTIONS 2. Net change by Change Orders $ –0_ _
previous months by Owner 3. CONTRACT SUM TO DATE (Line 1 It 2) $ 3,423,000.00
TOTAL 4. TOTAL COMPLETED & STORED TO DATE g 2,443,127.32
Approved this Month (Column G on G703)
Number 1 Date Approved S. RETAINAGE;
i a. _ % of Completed Work $
(Column D±E on G703)
b. _ % of Stored Material $
•
(Column F on G703)
Total Retainage (Line 5a+5b or 171,150.00
TOTALS Total in Column I of G703) $
tNet change by Change Orders 6. TOTAL EARNED LESS RETAINAGE $ 2,271 ,977.32
The undersigned Contractor certifies that to the best of the Contractor's knowledge, (Line 4 less Line 5 Total)
information and belief the Work covered by this Application for Payment has been 7. LESS PREVIOUS CERTIFICATES FOR
completed in accordance with the Contract Documents, that all amounts have been PAYMENT (Line 6 from prior Certificate) g 2,062,357.32
paid by the Contractor for Work for which previous Certificates for Payment were . 8. CURRENT PAYMENT DUE $ 209,620.00
issued and payments received from the Owner, and that current payment shown 9, BALANCE TO FINISH, PLUS RETAINAGE $ 1,151,022.68
herein is now due.
(Line 3 less Line 6)
CONTRAC M. K. Betts Engineering & Contracting, Inc.. State of: Indiana County of: Madison
Subscribed and sworn to before me this 28th day of Feb, , 2014
Notary Public: A-A-.--/"YL_S 47c,----
AR . j Date: February 28, 2014 My Commission expires: October 28 , 2015 . w
AMOUNT CERTIFIED $
ARC ITECT r /S CERTIFICATE FOR PAYMENT (Attach explanation if amount certified differs from the amount applied for.)
In accordance with the Contract Documents, based on on-site observations and the ARCHITECT:
data comprising the above application,the Architect certifies to the Owner that to the ��
best of the Architect's knowledge,information and belief the Work has progressed as By: ` Date: ".17—_-__..C
indicated,the quality of the Work is in accordance with the Contract Documents,and This Certificate is not negotiable. The AMOUNT CERTIFIED is payable only to the
the Contractor is entitled to payment of the AMOUNT CERTIFIED. Contractor named herein.issuance,payment and acceptance of payment are without
prejudice to any rights of the Owner or Contractor under this Contract.
dl& nnrl I..At>.IT.C-fr.. A70t Ir ftie.,,, •sir.rcnrir rr.r, r..,. ........... _ ..... ...... _.-.._. ... -.. .
0G4T oice
NUGENT ELECTRIC INC.Il\�C.
(765)643-8854 FAX: (765)643-4520 Date Invoice#
Fcr�'c 2106 OHIO AVE.
ANDERSON, IN 46016-2160 2/28/2014 19562
Bill To
Carmel Wastewater Treatment Facility
9609 Hazel Dell Parkway
Indianapolis, IN 46280
Attn: Joe Faucett
P.O. No. Terms Project
4S13806 Net 30 46153-SEPTA...
Description Qty Rate Amount
RE: SEPTAGE RECEIVING STATION
LABOR AND MATERIALS FOR ELECTRICAL WORK 19,680.00 19,680.00
COMPLETED AS PER ACCEPTED PROPOSAL#4765
Subtotal $19,680.00
THANK YOU FOR THE WORK, WE APPRECIATE THE BUSINESS. Sales Tax (7.0%)
$0.00
Total $19,680.00
Payments/Credits $0.00
Balance Due $19,680.00
1625 North Post Road
1D) Indianapoi , 58519
Bus. (317)) 8 895-5-2585
Consulting= Fax (317)895-2596
Carmel Utilities Invoice number 1390101-12
John Duffy, Director Date 03119/2014
30 West Main Street
Carmel, IN 46032 Project 13-901 Carmel -Cool Creek Bank
Stabilization Project e
For Professional Services Rendered Through: February 28, 2014 j'S r./k-
Project No.: 13-901-01 Carmel Utilities-Task Order No. 2013-1
Project Description: Cool Creek Bank Stabilization Project
Professional Engineering Services in connection with the above referenced project. This period we continued
erosion control design. We also assisted with the right of entry pursuits by preparing right of entry forms for your
use. PLEASE NOTE THAT AS WE DISCUSSED,WE WILL ASSIST WITH THE TEMPORARY RIGHT OF
ENTRY SERVICES AND TRACK OUR COSTS—THESE WILL BE BILLED UNDER OUR ORIGINAL HOURLY
PLUS COST AGREEMENT AND A SUPPLEMENT WILL ONLY BE REQUESTED FOR THIS SCOPE CHANGE
IF WE EXCEEED THE ORIGINAL CONTRACT PHASE AMOUNT.
We appreciate having the opportunity to work with Carmel Utilities.
Please feel free to contact our office if you have questions about this invoice or project.
Invoice Summary
Contract Percent Prior Total Current
Description Amount Complete Billed Billed Billed
13-901-01 Survey& Right of Way!Property Line 6,300.00 100.00 6,300.00 6,300.00 0.00
Services
13-901-01 Design&Permitting Services 53,100.00 48.04 25,319.80 25,509.80 190.00
13-901-01 Bid Phase Services 10,500.00 0.00 0.00 0.00 0.00
13-901-01 Construction Phase Services 34,300.00 0.00 0.00 0.00 0.00
13-901-01 Additional Temporary Land Acess 5,000.00 32.60 1,630.00 1,630.00 0.00
Services
Total 109,200.00 30.62 33,249.80 33,439.80 190.00
Design&Permitting Services
Professional Fees
Billed
Hours Rate Amount
Principal
Keith Bryant
Project Time 1.00 190.00 190.00
Invoice total 190.00
Carmel Utilities Invoice number 1390101-12
Page 1 of 2
Carmel Utilities Invoice number 1390101-12
Project 13-901 Carmel-Cool Creek Bank Stabilization Project Date 03/1912014
Approved by:
pp
Keith Bryant
Vice President
Carmel Utilities Invoice number 1390101-12
Page 2 of 2