HomeMy WebLinkAboutCorrespondence
ON-SITE EV TION FOR EROSION AND SED NT CONTROL
Hamilton County Soil and Water Conservation District
1108 South 9th Street, Noblesville, IN 46060
Telephone: 317-773-2181 Fax: 317-776-1101
Project Name:
II- 30.0 I
G IJ IL poeD PA e/<
Date:
Present at Site: John South, Hamilton Co. SWCD,
This report was Provided To: -1~ ~ e 2~ -2: ~ ·
'10 ~ Ee Bt.vi>.
+~DfA~~ PoL.~(.~
/' CHIIEI..
~ S uRVEYIJR
FILE..
Type OF EV ALVA TION:
o Initial 1& Routine m Follow-up 0 Complaint
This evaluation is intended to assess the level of compliance with 327 lAC 15-5 (Rule 5). It is also intended to identify areas where
additional measures may be required to control erosion and sedimentation. All practices recommended in this report should be
evaluated as to their feasibility by a qualified individual with structural practices designed by a qualified engineer.
All erosion and sediment control measures shall meet the design criteria, standards, and specifications outlined in the
"Indiana Handbook for Erosion Control in Developing Areas" or similar guidance documents.
Current Site Infonnation: SEe / C()ffPJ.Ere-..D, H~J{E$ /Jet. BEI1V6 #/JJ/... r:
-
GtJ111 Ei!o~/hN /'lore/:) IJJ J.e"CTEt. o/'Z. JJOr
.A p nlZ ~5~ED.
... .
SIr. EC(; ~ NO}/- ~~II
The Following Items Have Been Evaluated and Assigned a Designation of:
S = Satisfactory M = Marginal U = Unsatisfactory NA = Not Applicable
Constructio~te Management for Erosion and Sediment Control
S M Q!) NA (1) Disturbed areas have been adequately protected through seeding or other appropriate erosion and
sediment control measures.
S M <Ii) NA (2) Appropriate perimeter sediment control measures have been implemented.
S M ~ NA (3) Conveyance channels have been stabilized or protected with appropriate sediment control measures.
S M NA (4) Erosion & sediment control measures are installed properly.
S M U NA (5) Stonn drain inlets have been adequately protected.
<[)M U NA (6) Outlets have been adequately stabilized.
S M d1) NA (7) Existing erosion & sediment control measures are being maintained.
S M aI< NA (8) Public & private roadways are being kept clear of accumulated sediment or tracked soil.
S M ~ NA (9) Erosion & sediment controi measures have ot:en mstalled and maintained on individual building sites.
Status of Sediment Retention On-Site
tIf Site conditions present a high potential for Qff-site sedimentation.
o There is evidence of off site sedimentation.
o Description provided:
!t Please Refer to the Comments Section of this Report
Compiled By: Defmitions
Satisfactory: The item is currently in compliance with the rule
Marginal: A concern has been identified; corrective action is strongly recommended to remain in compliance
Unsatisfactory: A violation bas been identified and the site is not in compliance; corrective action is required
Not Applicable: Does not apply at this stage of construction Revised 4 /98
. .
ON-SITE EV A!J(A TION FOR EROSION AND SEDIMENT CONTROL
Hami. County Soil and Water ConservatADistrict
1108 South 9th Street, Noblesville, IN 4~0
Telephone: 317-773-2181 Fax: 317-776-1101
Date:
0J-/{
Project Name:
(*>( ~ , I ~(")f t!
Pr-L( I~
.
Present at Site: John South, Hamilton Co. SWCD, A~O\........ s nrH~1
)
F ""J< e.b.. _.",
<;. II F .~ Q
> P I ('" _ ~ r .! ~ t".. \ ) '"' + ":j III
F.- # ~.. -" ~/ - I '7...'5 /?
~ . ,;;0 .:'" ,
Type OF EVALUATION:
o Initial ~ Routine 0 Follow-up 0 Complaint
This evaluation is intended to assess the level of compliance with 327 lAC 15-5 (Rule 5). It is also intended to identify areas where
additional measures may be required to control erosion and sedimentation. All practices recommended in this report should be
evaluated as to their feasibility by a qualified inrli"irl..n1 ...,.. ; designed by a qualified engineer.
All erosion and sediment (\. r\. A/J r\ /)~J'
"Indiana Handbook for 1 'fJ ~ )J~~ I .
Current Site lnfonnation: - ~'. OJ~ -p. : ~
~- - ~ ~/}-....JL-/
~..L V;.UI D).,~
rvJ ~...A ~;V--i)
J. ~~~~..
'~ .J?A~~ ~
The F V~-- ...1 .-tr 19ned a Designation of:
S = Satisfa. ~1 ~ NA = Not Applicable
Construction Site Managen :;;;140 ~~.~.
S (2) U NA (1) I (t . II. I L J h seeding or other appropriate erosion and
s ~ 4<0~,
s \8> U NA (2) A __oow'" vvuU-Ol measures have been implemented.
S . M U @ (3) Conveyance channels have been stabilized or protected with appropriate sediment control measures.
C& M U NA (4) Erosion & sediment control measures are installed properly.
S tB2 U NA (5) Storm drain inlets have been adequately protected.
S M (D) NA (6) Outlets have been adequately stabilized.
S (M) U NA (7) Existing erosion & sediment control measures are being maintained.
@ 1vr' U NA (8) Public & private roadways are being kept clear of accumulated sediment or tracked soil.
S M U @ (9) Erosion & sediment control mjasures have been installed and maintained on individual building sites.
Status of Sediment Retention On-Site
o Site conditions present a high potential for off-site sedimentation.
o There is evidence of off site sedimentation.
o Description provided:
ndards, ano specifications outlined in the
idance documents.
),4
.~
C- "It ~ +-., /' 1 C'-#+~ d
~
o Please Refer to the Comments Section of this Report
Satisfactory: The item is currently in compliance with the rule
Marginal: A concern has been identified; corrective action is strongly recommended to remain in compliance
Unsatisfactory: A violation has been identified and the site is not in compliance; corrective action is required
Not Applicable: Does not apply at this stage of construction Revised ./ /98
" ..
ON-SITE EV JATION FOR EROSION AND SE ENT CONTROL
Haml on County Soil and Water Conservatl n District
1108 South 9th Street, Noblesville, IN 46060
Telephone: 317-773-2181 Fax: 317-776-1101
Date:
5-() 3 -0/
Project Name: GUILFDJ2D PAeK
Present at Site: John South, Hamilton Co. SWCD, !Co n J-t.'/~r,
.
11\ A I J-'f.. 0
~, ~(;\
Type OF EV ALVA TION:
~
o Follow-up
This evaluation is intended to assess the level of compliance with 327 lAC 15-5 (Rule 5). It is also intended to identify areas where
additional measures may be required to control erosion and sedimentation. All practices recommended in this report should be
evaluated as to their feasibility by a qualified individual with structural practices designed by a qualified engineer.
All erosion and sediment control measures shall meet the design criteria, standards, and specifications outlined in the
"Indiana Handbook for Erosion Control in Developing Areas" or similar guidance documents.
Current Site Information: P01h J rti)"Y11 ~ft1r~j ~t'!1 ~" /1 ('~t.A t~tJ(' ~ 3'~ MtJ: hys.
.sfa/'/# $~W~( ("'$ffl/Ia.~ ~/~~b~ hl"S/# #()f ~/of'f~cI.
The Following Items Have Been Evaluated and Assigned a Designation of:
S == Satisfactory M == Marginal U == Unsatisfactory NA == Not Applicable
Constructio~te Management for Erosion and Sediment Control
S M lW NA (1) Disturbed areas have been adequately protected through seeding or other appropriate erosion and
sediment control measures.
S M @ NA (2) Appropriate perimeter sediment control measures have been implemented.
S M U @ (3) Conveyance channels have been stabilized or protected with appropriate sediment control measures.
~ M U NA (4) Erosion & sediment control measures are installed properly.- ~y E""ft-"ct!..
S @ U NA (5) Stonn drain inlets have been adequately protected.
S M U @ (6) Outlets have been adequately stabilized.
@ M U NA (7) Existing erosion & sediment control measures are being maintained.
~ M U NA (8) Public & private roadways are being kept clear of accumulated sediment or tracked soil.
S M U @ (9) Erosion & sediment control measures have been installed and maintained on individual building sites.
Status of Sediment Retention On-Site
1( Site conditions present a high potential for off-site sedimentation.
o There is evidence of off site sedimentation.
o Description provided:
~ Please Refer to the Comments Section of this Report
Satisfactory: The item is currently in compliance with the rule
Marginal: A concern has been identified; corrective action is strongly recommended to remain in compliance
Unsatisfactory: A violation has been identified and the site is not in compliance; corrective action is required
Not Applicable: Does not apply at this stage of construction Revised 4/98
D_te:
HAMI,LTON CO IA PAGE 06/09
~ -.Q l "';}O
ON-SITE EVALUATION FOR EROSION AND SEDIMENT CONTROL
HaiDiltoD COUDty Soil and Water Conservation Distriet
1108 South 9th Street, NoblesviUet IN 46060
Telephone: 317..773-2181 Fax: 317-776-1101
'.JJ-"""-
t2/07/2001 12:23
317 76-1101
~ I- :JO-6/
Project Name: G U I L ':-0 Ii!. .Q F PA 2.IC
Presen~ at Site: John S~Uth1 HannltoD Co. SWCD,
This "'~port was Provided To:-Lf) lJ ~ 24 D,,- V.
~''10 J)~Ci&~<<~ ~'tj).
+~b '4118 pc..'Jt.~
~APjtEL,
~ ~uliiEPM
FILE..
Type OF EVALUATION:
o lQitiaJ 11 Routine mer Follow-up 0 Campl.int
This eva:Juation is iritenqed to assess the level of compliance with 327 lAC 15-5 (Rule 5). It is also intended to identify areas where
additi~al mcasu.rc'S' Jnay'be required to control erosion and sedimentation. All practices recommended in this report should be
evBIuated as to their feasibility by a qualified individual with structural practices designed by a qualified engineer.
An erosion and sedimellt eOBtrol measures .hall meet the deSign criteria, standards, a..d s~eclficatloDs outlined in the
, ffIbdiaDa RabdbOOk for EroiioD ControllD Developing Areas'. o~ simUar ruidan~e documents.
, Cumnt Site Information:
S'El: I CtJlI~J.ErED ~E~ 4U BEIN& lUlL T:
-
1~~e;~jg: /'lorE/) .liI I.err~i:. 9/1.e. Nbr
Sin Z
The Following Items Have Been Evaluated and Assigned a Designation of:
S .. Satisfactory M;;;; Marginal U ~ Unsatisfaetory NA iIiI Not Applicable
CObstructto~te ManlgemeDt tor ErosioD Bnd Sediment Control
S M QU NA (1) Disturbed areas have been adequately protected througb seeding or other appropriate erosion and
'. sediment control measures.
S M INA (2) APptoprillte perimeter sediment controlmeasure$ h~ve been implemented.
S M NA (3) Conveyance channels have been stabilized or protected with appropriate sediment ,control measures.
S M 'N-A (4) Erosion & sediment control measures ar~ installed properly~
S M NA (5) StanD drain inlets have been adequately protected.
'<J)M U NA (6) Outlets have been adequately stabilized.
S M ~ NA (1) Bxisting eroaion & sedbnent control measures are being maintained.
S M NA (8) Public" private roadways are being kept clear, of accumulated sediment or tracked soil.
SM. NA (9) , Erosion & sediment cOiltrol measures have been installed and maintained on individual building sites.
Status of Sediment ReNntioll On-Site
, ,r ,Site conditions present a high potential for off-site sedimentation,
o 'There is eVideuC'e of off site, sedimentation.
o Description provided:
9f PI. Refer to tbe Comments SeetiOD of this Report
Compiled By~ Definitions
: Satisfactory: The Item Is currently in compliance with the rule
Marcin.l: A eODeern has beeD identified; corrective aetion is strongly reeommcDded to remain jn compliance
:UDiatlsfactory: A'violation bas been Identified and the site is not In compliance; corrective action is .-eqldted
.~o* App,llcable: Does Df?t apply at this ltale of eOllStructjon Rni.Jgrl4/98
03/14/2001 14: ,4B 317~ 711101
'. ..... R\O~: .6 1111. ~D PAIeI(
HAMILTON CO US~,
PAGE 11
.-
..P~~2'~3
. '.
. .
. ~ t
,I I'
". ;
I.::.........;. yes, '~No",'
o
....':. ...0 '.
,:,0
,,0 ..
o
. I ,.
.' Yes No .
.0
. "0
.0
" :.,.'. ,0 .
f ',...
:... I ~: ~
.':0 2~
.p' 2'.
':.D i ..~~
, :'::: ~\~, , ::.~:;::'; ... :,
:0
'0 .'
, . ':1: .
, '.
-
21
'~.r&E FOLLOWlNq ITEMS ADEQUATELY ADDRESSED ON.1'IIE PLANS ,
. (AN "'-11"- inclMu ApprtJprUlU.l4--' SctIlG, - NtlrtII.AmM)
'.:;:, i!t- tllfIl.:tIR Not ~llcdk ., tId8 PNJ<<t IW MIlg1utt<<IlJy NA)
','. 'PRUJICT INFORMATION
1~ : Project .Locatio. MaP (Show pr.ojed In rwlation to 0'" tIIWII oIth~ COIrIf~) .
Iii .' N~fift DeKrlb~ the Nature ud Ptarpote of the Pi'oJed
t.~ . . LoCatlOll or "ODed mdlor EDdIag Ro~d.. Utuitlet. Stra~ Blabwa,., ek..
18 . 1At...~ BldJdiIig ~O..
IE " ~1IIe'.of A_jacdt ~
. (Sh~w thi BntlN Up8tnJtlm Wtltenhal tmtJ .MjacCftt Annt Within ~OO F. ()Ith~ Prvperly LinQ)
. TOPOCSRAPBIC, DRAINAGE, AND GENERAL SITE FEATURES
2A .' Edtiag VegetadOD (ldentifytmd DtJl;ntJtI~ )
2" Loc8tlollldcl M&dlt or AD Wetlands, Lakes md Water CouncI 0. ad AdJ..t to tile s~.
2(:' .: l00::~~ lloGdplalill. l100dway Frill... Ill. l1oochray8 (NDUI/NfJII')
2_ :' Soli; .lDfcJnutioa (' If hydric 60118 lire prwent. it iI the rwpoMiblllty DftIN 0WIUII'I4~ f()
:: 1nWiM/&,* the ifJdsttJlme ofWtlmttb llntl to obttlln ptnnlu from th~ ilpJWrJJW/t:* ~ agmciG.) .
. ~: ~.~ PJuu,.ed CoIltoan at 8Il1nterYa1 Appropriate to ~ Dtliaqe PaUam
.~!:~OII~ of Spedtie Po~ti Where Stonawatcr Did... WID ~ the Site .
....: I~ . ~ WatetI -( 1I~ 18 to" StqNI1TIIeMrltddptll Stt1rIII ~ ltl".,;,s.. , .
::; ~t(~~d#Op#1fIIr1r""'tbeUltimatlJ~JYtIIt1r) ",: '
';: ~~:4reiI wIlere storm water Mar Eater~"'" (NtD "NoM) .
'. ~"~~ ~tOl1IlW:.ter Syste. (Inelud~ Cadvera. 8ttmll Sewn, ChtInnt&. tIIIIl8wrda)
.f "., . . :. I .. I
,'," "y~ 'No ' :;\'~~.IdvDiNc ACTIVITIES
':: .H::~': ;:' :::."'0,::',,:, ',. ," 3. :':: ~P4:~PtoDmite Dimeasioas of AD Dilaarbcid __ [1.&: ~ LmntJ]
. ':: ~ ~ V,.attve CtnV Wi/I Be P"-W1I'Yai ShmJd be Cbarly Dai~
: :....SoQ~S~~..and.or ~w Area (Show lDctmDIIJ or Note if Non.>
"II'
_.,a
0 ".- 3B
.. .Ye. No ": "
'.. II" 4A
... 1'1 .0.: 'II
. . "Q:.,:. '~II ,':" ..4(:.
. ,fIJ ,....:. . :.0 4D
. ... " .IS. . ::(J 4E
rlid
o
'0 .aa 4G
.11' 0 48
. .1 :0 . . 41.
Ii .0 41',
II ,d. 41{
4F
. .
." EROSION AND SEDIMENT'CONTROL MEASURES
: ~~'of Wliea Each Me..-re Wall Be IdlpJemeated (RfkrdH to &mil Distwrbfng kttIItla). .
. M~~ m:d MalatsPCe Gaiclelllles for I!&dl ~euure
.' P~er' Secllmeat Conirol Measaret (LocaIiOl'lp Cotutrwctlon D<<aIl. DI",.,mon..r, tmtl Sl*ffIC4JtIOM) : ,:
'.' Tcaiponty ~iaa (Spc(ftcatloru: Including s.d Ma, Fmilizer, Ltm.~ aM Mtdch Rizta)
TaQararJ Ei'Osloaa ....d 5ecIiatat Coatrol Meuara
(LociItiOlt, CDtub1t<<i. Delidl, DlmmriOlU, and SpedficatiOlll)
Peniumelrt El'OIloa ...d Sedbaellt,Colltrol Meuara
(loctztit1lf# 'CorumIctiDtl DM!JII. DI",I!IUi~, ar.J $]}t1dJi~IJM)
Stotlll'DdIia IDIct ProtcctlOD (LDoatlDII, CoIurruDlion DaJf~ Dbn."loru, lIIId S1MfJIIitJtJtl<N)
,Storilnr* OUtlet Protetdo. ~on, Ctmrtrrtctl(7fl Detail, iJ;m...OIlf~ tIIItl Spec;fiC46rHU)
Stable CoDstractiOll EatrUce (lAcation. Cmutnlction Detail. Dimeuior&J, _ Sp<<:iftCtltitJM)
Erosioa ad Scdlmeat Control OD Iadil'id1tal JlaDcIlDI LotI (S~/JCGIjOlU)
. ...e........t SeecUat (SfNJdIictltiOlU_" l"clutli", SMl M&. Fmtlu,r. U".e. tIIId MfIIdt RateJ)
R~4/""
. "tt':
,.. ,.' 'I .' t ,:/~,
". .', ." :. ..i',
. 't'
t I . . . ~ ..: I :
. :. "
, . .
. .. t:
'. ~:.
. I . 'j \
f ." ,
:'.. .'t:
,; . I
.: :.1
to (,
, !: .~;:
J I. I, .f :
. f.-'
.!',
,',. I'
: '
f' .' I
- -
~~ .
",r(r.~y~ CARMEUCLAY TECHNICAL ADVISORY
~~ '\'
~ ~~~Co COMMITTEE AGENDA.
1
Date:
Place:
9:00 a.m.
9:30 a.m.
9:40 a.m.
9:50 a.m.
10:00 a.m.
10:30 a.m.
11 :00 a.m.
January 17, 2001
Department of Community Services Conference Room - 3rd Floor
Carmel City Hall
Hazel Dell Comer, Lot 5 - Hazel Dell Office Building (6-01 SP; '-01 ADLS;
SlJ-3-01;1V-4-01)
The site is located at 13250 Hazel Dell Parkway. Tl1e site is zoned B-3/business.
Filed by Michael B. Jett of American Consulting Engineers for Hazel Dell Office
Development, LLC.
Merchants' Pointe, Lot 5 - Border's Books (199-00 ADLS)
The site is located southwest of East 116th Street and Keystone Avenue. The site is
zoned B-8/business.
Filed by James J. Nelson of Nelson & Frankenberger for The Linder Group.
~c
r/C
Merchants' Pointe, Lot 6 ~ General Office (200-00 ADLS)
TIle site is located southwest of East 116th Street and Keystone Avenue. The site is
zoned B-8/business.
Filed by James J. Nelson of Nelson & Frankenberger for The Linder Group.
Merchants' Pointe, Lot 7 - Retail (201-00 ADLS) f'
TIle site is located southwest of East 116th Street and Keystone Avenue. The site is ML:..
zoned B-8/business.
Filed by James J. Nelson of Nelson & Frankenberger for The Linder Group.
Woodland Shoppes Telecommtlnications Facility (SU-I-01) ~
The site is located northeast of East 116th Street and South Range Line Road. The.. C-
site is zoned B-8/business.
Filed by Matt Mugavero of CIS Communications for Nextel West Corporation.
Carmel United Methodist Church (SU-2-01)
The site is located at 621 South Range Line Road.
and R-2/residence.
Filed by Fanning/Howey Associates for Carmel United Methodist.
Guilford Park Subdivision (2-01 SP)
TIle site is located at the southeast corner of East 116th Street and South Guilford
Road. The site is zoned R-l / residence.
Filed by Paul G. Reis of The Reis Law Firm for Kosene & Kosene.
F~ipeline (~o.
~";as no CCln~Da.ny F:aci\ities
;nvo!\led 1n this pfoiect
_,._.,J,_-.,,~...PA~ - ~_!:1 ~.()L
S~QftJI! Date
.
--
.
page 2 of3
Technical Advisory Committee Agenda
January 17, 2001
11 :30 a.m.
Bonbar Place Subdivision (Primary Plat)
TIle site is located at the northwest comer of 1-465 and the Carmelj Clay Monon
Greenway. The site is zoned R-l/residence. It
Filed by Paul G. Reis of TIle Reis Law Firm for Kosene & Kosene. ,tJ,<2-
12:00 noon - 1 :00 p.m.
1:00 p.m.
1:10 p.m.
1:20 p.m.
1:30 p.m.
2:00 p.m.
2:30 p.m.
1-hour Lunch Break
Village of West Clay, Section AG01 (3-00 SP)
The site is located southeast of West 131st Street and Towne Road. TIle site is ~t
zoned PUD/planned unit development. a..
Filed by Keith Lash of The Schneider Corporation for Brenwick TND /'
Communities.
Village of West Clay, Section AG02 (4-00 SP)
The site is located southeast of West 131st Street and Towne Road. TIle site is 4' ...,,/l.........,/
zoned PUD/planned unit development. ~
Filed by Keith Lash of The Schneider Corporation for Brenwick TND
Communities.
Village of West Clay, Section 6502 (5-00 SP)
The site is located southeast of West 131st Street and Towne Road. TIle site is'11/i
zoned PUD/planned unit development. · t....-
Filed by Keith Lash of The Schneider Corporation for Brenwick TND
Communities.
Two-Story Medical Office Building (DP / ADLS)
,TIle site is located southeast of West Smokey Row Road and Oak Ridge Road.
site is zoned B-5/business witl1in tl1e U.S. 31 Overlay Zone.
Filed By Adam DeHart of Keeler-Webb Associates for F.C.C. Development.
Windsor Grove Subdivision (Primary Plat)
The site is located on the soutl1west corner. of West 106th Street and Towne Road. ~
The site is zoned S-l / residence. V>
Filed by Edward E. Fleming of Stoeppelwerth & Associates for Wmdsor Grove L-
LLC.
Woodhaven, Section 1, Lot 28 (Primary Plat Amendment)
TIle site is located on the nortl1east corner of Woodllaven Drive
Michigan Road. The site is zoned 8-1/ residence.
Filed by David R Bames of Weihe Engineering for CDC Corporation.
~;),ant'~and'H E:ast(:~rn F'ipeline Co.
has n() Gon"upany r=acHities
invOlved){l this project
-~. ~-.J~ -L/)""o..L_
Sign~ Date
PROJEct: 6VILF"Oe.t> .pA~.
,Page 2 of
J'
"
Yes
~
.~'
~
m-
~
No
o
o
-0
o
o
Yes No
~ 0
~ 0
~ 0
~ 0
flj 0
~ -0
.f)J 0
H' Q.
rg 0
Yes .No
0 ~
0 m
Yes' No
0 tEl 4A
~ 0 4B
Q. ~ 4C
1J' 0 4D
~ Drl 4E
ug. 0 4F
0 KI 4G
~ 0 4H
(J 0 41
Kl 0 4J
'~ 0 4K
IA
IB
IC
, ID
IE
3B
.
'ARE TIIE FOLLOWrnG ITE~S ADEQUAT]3:LY ADpRESSED ON THE ~LA:NS 1
(All Plans Must Include Approp~iat~ U~Ot~, Scaks, and North ArrOlP) -
(Items that are Not,Applicabk to. this Projed ar~des1griatuf by NA)
PROJECf INFORMATION. . .
l!rojed l..ocl.tion Map (Show projed in relati;;'; to otherareaiofth~ county)
Narrative DesCribing the Natu~ ,and Paqlose of~e Project
L9c.ation of PJanned and/or Exis:ting RO~~1 Utilities, StrncU1re5t Highways, ctc.
Lot and/or Buildi.tig Loc.atio~
Landusc of Adjacent Areas. .
(Show dIe Entire Upstream Wat~hed and Ad;acentAreas Within ~OO Feet of the Property lines)
2A
2~
2C
2D
TOPOGRA~HIC, DRAINAGE, ANJl.G-~NERAL SITE FEATURES
E~ng Vcgc~ation (ldentifyand.Ddineate) .
Location and Name of All Wetlands, Lakes, ~d Water Co,ursCs On ~d Adjacent to the Site
100 Y car F1oodp~ainst Floodway Fring~, and Floodways' (Noie 'ifNo-"~)
Soils Info~~{ion' (Jf/~n-c soils C:r~ present. it,is the responsibility of the owner/developer to
investigate the existence ofWe!lan~ and io obtalnpermits.fi:c?m th~appropriate gov~ent agencie.sJ
Existing and ?lann~ Contours at ~ Iri~eM.I Ap~(Opriate to Indicate Drainage Patterns
Locations of Specific Poin~ Where Stormwater-Discharge Will 4ave the Site
Identify All ~eiying Watees (Jf~~ is to (I~eJ.l1lnicipal Storm Sewer. Identify th~
Name of the Municipal Operator and the Ultjriirte~g Water)
. .
Potential Areas .Where 'Stomi Water May Enter Groundwa.ter (NOte if Non~) .
.. .. . -
Location of Stormwater System (IncIude'eukrts. 8.torin~. ~w. ~ Swales)
2E
2F
2G
m
11
SA
LAND DI$~lNG~CTlVITIF;S . _
. Loca~ionand App rorima~e J;liniens~ODS of ~. Disturbed ~ [i.e... , ConstructiOn limits]
(Areas Whae Vegdative C9ver Will B~Preserwxf.Shmdd be. CJ~ Designated)
Soil Stockpiles and or Borrow Areas(Sh~Lo<:duonsorNot~ifNon~)
EROSION, AND SEDIMENT CQNlROL l\1EA'SURES
Sequence of When Each MeasUre Will B~ Implemented (&lative to Earth DiSturbing Activiti~)
Monitoring and Maintenance Guidelines for Each Measure
Perimeter Sediment Control Measures (Location. Construction Detail, Dim~ons. and Specifications)
Temporary Seeding (Sp~cifications: Including Seed Mix, Fertilizer. Lif!le. and Mulch JWtes)
Temporary Erosion and Sedimrot Control Measures
(Location. Construction Detail. Dimmsions. and SJH!C!jications)
Pcrmanrot Erosion and Sediment Control Measures
(Location. Construction DdfIi/" Dimmsions, and ~pedfications)
Storm Drain ~~et Protection (Location. Construction Ddail. Dim~ions, and S~Jications).
Stormwater Outlet Protection (Location. Construction Ddai[. Dimm.riotU, and SJHrifications)
SUlble Construction Entran~ (Location, Construction !Jdai!. Dimduions. and SJHriJications)
-Erosion 2I1d S~imrnt Control on Individual Building Lots {Specifications}
Perm2Dwt Seeding (Spe.cifications: Including Sad Mix., Fertilizer. Lim~. and Mulch Rat~)
Revised 4C 197
.