ENGINEER'S ESTIMATE
NORTH HAVEN
CARMEL, IN
ITEM: SANITARY
DATE:
JOB NO.:
10/23/2001
20277
DESCRIPTION QUANTITY UNIT UNIT PRICE TOTAL
8" PVC Pipe 2,650 LF $13.53 $35,855
Manholes 11 EA $1,800.00 $19,800
Granular Backfill 1,980 TONS $14.00 $27,720
,-
i
Wyes 8 EA $50.00 $400
TOTAL SANITARY $83,775
e
ENGINEER1S ESTIMATE
e
NORTH HAVEN
CARMEL, IN
ITEM: SUMMARY
DA TE:
JOB NO.:
3/22/01
20277
DESCRIPTION QUANTITY UNIT UNIT PRICE TOTAL
Sanitary Sewer $88,463.00
Asphalt Path $17,345.00
Gray Road Improvements $110,751.00
GRAND TOTAL $216,559.00
e
ENGINEER'S ESTIMATE
e
NORTH HAVEN
CARMEL, IN
ITEM: SANITARY
DA TE:
JOB NO.:
3/22/01
20277
DESCRIPTION QUANTITY UNIT UNIT PRICE TOTAL
6" pve Pipe
8" pve Pipe 2,828 LF $13.53 $38,263.00
10" pve Pipe
12" pve Pipe
15" pve Pipe
18" pve Pipe
Manholes 11 EA $1,800.00 $19,800.00
Granular Backfill 2,100 TONS $14.00 $29,400.00
Wyes 20 EA $50.00 $1,000.00
TOTAL SANITARY $88,463.00
e
ENGINEER'S ESTIMATE
e
NORTH HAVEN
CARMEL, IN
ITEM: ASPHALT PATH
DATE:
JOB NO.:
3/22/01
20277
DESCRIPTION QUANTITY UNIT UNIT PRICE TOTAL
10' Asphalt Path 1,188 SY $14.60 $17,344.80
TOTAL ASPHAL T PATH $17,344.80
e
ENGINEER'S ESTIMATE
-
NORTH HAVEN
CARMEL, IN
ITEM: GRAY ROAD IMPROVEMENTS
DA TE:
JOB NO.:
3/22/01
20277
DESCRIPTION QUANTITY UNIT UNIT PRICE TOTAL
Topsoil Removal 360 CY $1.75 $630.00
Excavation (eut) 440 Cy $3.05 $1,342.00
Embankment (Fill) 440 Cy $3.05 $1,342.00
Bitum. Surface eourse 3,440 SY $2.50 $8,600.00
Bitum. Binder eourse 1,416 SY $11.35 $16,071.60
Agg. Base eourse 1,416 SY $12.13 $17,176.08
Stone Shoulder 333 SY $5.40 $1,798.20
eoncrete Curb & Gutter 94 LF $10.00 $940.00
eoncrete Curb Turnout 2 EA $200.00 $400.00
Handicap Ramp 2 EA $245.00 $490.00
Connection to Water Main 1 EA $2,000.00 $2,000.00
12" Rep Storm Sewer 81 LF $21.00 $1,701.00
End Section 2 EA $580.00 $1,160.00
eon crete Paved Side Ditch 1,625 LF $32.00 $52,000.00
Seeding 6,000 SY $0.85 $5,100.00
TOTAL GRAY ROAD IMPROVEMENTS $110,750.88
e
e
CONSTRUCTION COST OPINION
Project Name North Haven - Carmel Public Improvements
Prepared By Greg Snelling Date 26-Jan-01
Unit
Item Quantity Unit Price Cost
8" PVC Sanitary Sewer @ 4'-6' Depth 1914 LF $12.40 $23,734
8" PVC Sanitary Sewer @ 6'-8' Depth 550 LF $14.40 $7,920
8" PVC Sanitary Sewer @ 8'-10' Depth 123 LF $16.40 $2,017
8" PVC Sanitary Sewer @ 10'-12' Depth 160 LF $18.40 $2,944
8" PVC Sanitary Sewer @ 12'-14' Depth 81 LF $20.40 $1,652
Sanitary Sewer Manholes 11 EA $1,800.00 $19,800
8" x 6" Sanitary Sewer Wyes 20 EA $50.00 $1 ,000
Granular Backfill 2100 Tons $14.00 $29,400
10' Wide Asphalt Path 1188 SY $14.60 $17,345
Topsoil Removal 360 CY $1.75 $630
Excavation (Cut) 440 CY $3.05 $1,342
Embankment (Fill) 440 CY $3.05 $1,342
Bituminous Surface Course 3440 SY $2.50 $8,600
Bituminous Binder Course 1416 SY $11.35 $16,072
Aggregate Base Course 1416 SY $12.13 $17,176
Stone Shoulder 333 SY $5.40 $1,798
Concrete Curb and Gutter 94 LF $10.00 $940
Concrete Curb Turnout 2 EA $200.00 $400
Handicap Ramp 2 EA $245.00 $490
Connection to Water Main 1 EA $2,000.00 $2,000
12" RCP Storm Sewer 81 LF $21.00 $1 ,701
End Section 2 EA $580.00 $1 ,160
Concrete Paved Side Ditch 1625 LF $32.00 $52,000
Seeding 6000 SY $0.85 $5, 1 00
TOTAL $216,563
SAY $220,000
~$~\\\:\\~~ \ ~ ~! i ~ i :ig~;~:.:~,(,:::.
#' ~ ~:~....~.:..~;,~.l",~'/ ":~<.:,.
~~ ~\::i.....~ G \ S T E li.~:..~ i..' / "~::.
t ~.,.. ~v 1:(; "'<~}/:;,
::: I 1\ , 0 ~ ~ ~.
....: Hu ~ ~,:;~
E * i 1 ., , ~ ../1.., ~;
~ : 9 at) n (141.....{ : },-l r.,'l
S ': " \) ~J '- . : i".,~
%--0\ STATE OF ./Q~Af
\ ~\.. ./>S:,><&',i;/
~ ~L'o... I A 'D I ~. ,,} ~ ..... '-, 4', ..~.."' ,,'i~':.'
~ (.....() ..'V ,,\"'.. 00 ".,"'~"..
fr~ U~(\I"".'.."'..'.:::"':~\.::},' ..*:....~.
~/~ U ~!y A{i 'C\':1.1.' ::~..
~~~I\\\\\W
Of, 2C,/O I
.
e
e
,I .:f; Jl]::~~: 'C;'~'>~::;:~;..::-,.,
dl~~ .9-._~.~.~~'<~,
City of Carmel
DEPARTMENT OF ENGINEERING
Decenlber 4, 2000
Mr. Robert Doster, P.E.
CSOArchitects Engineers & Interiors
9100 ,Keystone Crossing, Suite 200 '
Indianapolis, IN 46240
[{E: 9~()O North Gra)'Road (Nol1h I-Ial'cn)/Projcct 'l{cl'ic"~ #2
,Dear Mr. ,Doster:
I apologize for the delay in responding to your letter of October) () in regard to our initial revic\vand
COllllnents. We offer the follo\ving additional COlllJl1Cnts based upon the revised clnl\vings subJnitlcd for
this project:
RECEIVED
DEe - 5 2000
CSQ
/~
~.~
~~~
~~~
I. Has the annexat.ion procedure beefl initiated? Just a rClnindcr that all of the Gray Road right-or-,vay
HUlst be included in the annexation Clnd the legal description.
2. Our relllaining InajaI' issue \vith this developrncnt concerns Gra)' Road drainage. It :Ippcars the site
,viII translllit considerable drainage to the .East Side of Gray ,RO<lcf \vherc there is Ininilll<ll slope
availablc. We believe achieving a O. I ex) slope is nearly ill1POssiblc. Is there an outlet south of the site
to accoHnnodalc the ditch flo\v? Our suggestion \vottld be to increase the ditch slope and/or install (HI
underdrain or paved side ditcho A suitable:- positive flo\\-' outlet Hlllst be provided, even if off-site \vark
is req ui red.
3. Why is thc passing blister not centered on the cntrance?ls it because of concern over left turn
stacking? Can you providc inforlnation andlor dilncnsions for this?
4. Indicat.e the right-of-\vay \ViOl dinlcnsions on thcEast Side of Gray Road.
'I~EMAINING REQIJI'REMENTS
A. Board of Public Worlis and Safety ApJlI.ovals:
. Sanitary Se\vcr Availability Approval.
. COllllllcrcial Curb Cut Approval (including constructiorl entrances).
. Dedication of .Right of Way and Acceptance.
. Any iJnprOVClllcnts installed \vilh dedicated right or \vay.
.1 ('1111 enclosi ng a schedule of Board of Publ ic \tV orks a nel Sa ref y Incct ing dates and agcncl.(l clCcld Ii IlCS
for your lIse. Any subnlission to the Board requires prior final approval b.y the C~(}nncl Plan
COllllnission Hndlor 'Board of Zoning Appeals. rl//lvritlen' requests to be !J/aced on the floord',,'
agenda 111usf include the ,late (or date~\)' ojOlljJjJrol'lIl 11.1-' the />/11,., ('0l1l111;SS;0I1 (Jnd/or JlZI~'.
B. Sanitar)' Sc,,:cr Av,iilability (ac..cagc) and Con'1(o~cti()n Fees:
. Availability (Acreage) Fees arc based upon tOla! ~lCrC(}gc (Iega} description) (ill $I.]()).()() pcr acre.
Based upon your letter of October 16th. this clc\'clopnlcnt including the Gr;IY Road right-or-\vay~
contains 42.94 acres. 'rhus. 42.tJ4 acres t/i:: $ L.165.00 per acre cqu~'lls $58, () 13.00 Sanitary Sc\\:cr
l\\'ailabiljry Fe'c. Infrastructure irnpro\-"clnc.llt conslruction C:'Ulll0t starf until appropriate
availability fees have been paid and an rcquirclncnls h:n.c heen s;)(islicd.
. Conncction Fees arc based upon the average user factor table frolll section <)..200 of our lJliJily
()rdinancc. Based upon your sublnissions. lhe follo\ving arc prelilninary ('onnccrioll Fcc
cajculat.ions (??~ $795.00 per EDU:
ONE CIVIC SQUARE CARMEL, INDIANA 46032 317/571..2441
Date:
Place:
9:00 a.m.
9:30 a.m.
10:00 a.m.
10:30 a.m.
11:00 a.m.
11:30 p.m.
e
.
CARMEL/CLA Y TECHNICAL ADVISORY
COMMITTEE AGENDA
I!~)
~ ~~;:7
I/~
December 20, 2000 r#f,~;~~~) ~
Department of Community Services Conference Room - 3rd Fio~;r <:)
Carmel City Hall
Hazel Dell Corner, Lot 1 - Osco Drug (180-00 SP; 181-00 ADLS; SU-198-
00; V-199-00 through V-20S-00)
The site is located at 5790 East 131st Street. The site is zoned B-3/business.
Filed by J. Murray Clark of Clark Quinn Moses & Clark for American
Partners.
Mayflower Park, Block 1, Lots 4-6 (197-00 SP)
The site is located in the 9800 block of Mayflower Drive. The site is zoned 1-
1/industrial.
Filed by Jamie Browning of Browning Investments. t ~
North Haven Development Plans (1~) ~ ~ ~ ,-
The site is located northwest of Eas~96iliS;reet and Gray Road. The site is
zoned S-1/residence.
Filed by James J. Nelson of Nelson & Frankenberger for C. P. Morgan.
St. Mark's United Methodist Church (Special Use)
The site is located at 4780 East 126th Street. The site is zoned R-1/residence.
Filed by Paula A. Wright of The Partenheimer Group for St. Mark's United
Methodist Church.
Stoughton R.E. Partners (Use Variance)
The site is located at 1917 East 116th Street. The site is zoned R-1/residence.
Filed by Thom~s H. Stoughton of Stoughton R.E. Partners.
Carmel Christian Church (Special Use)
The site is located at 463 East Main Street. The site is zoned R-2/residence.
Filed by James J. Nelson of Nelson & Frankenberger for Carmel Christian
Church.
12:00 noon - 1:00 p.m.
l-hour Lunch Break
1:00 p.m.
Martin Marietta Materials (Special Use; Developmental Standards
Variance)
The site is located at the northeast corner of East 106th Street and Gray Road.
The site is zoned S-1/residence.
Filed by Thomas H. Engle for Martin Marietta Materials, Inc.
E::Pi~d~\:~rn F~ipeline Co..
~~~a?~ r~c. c()rnpany r=acilities
inv213d in tt~rOje.l'? -:-fCS'O{)
....;~Jid2."._.__. D t
s(c;;':fJ ' · R.e
Ii
t I
;j
V{G
DIG
IJlc
vi c-
I
tJ(e~
/Jf
pre