ON-SITE EVALUATION FOR EROSION AND SEDIMENT CONTROL
HamJItOD County SoU and Water CODsen'atioD Distriet
1108 South 9th Street, NOblesville, IN 46060
Telephone: 317-773-2181 Fax: 317.776-1101
~
~~/07/2001 12:23
31"2 16-1101
Project Name:
Ptesent at Site: John SOUth, HamlltoD Co. SWCD, _
~. report was PrOVid~ To: Iriti~* Si~~J';
.rl-' n/"'WltfJOI." .::La.} .
Type OF EVALTJATION: I "'~Z"lO
tJ Initial D Routine I Follow-up (J Complaint
This evaluation is intended to assess the level of compliance with 321 lAC 15-5 (Rule S). It is ZlIso intended to identify areas where
additional measures iDay be required to control erosion and sedimentation. All practices recommended in this report should be .
evaluated 8.$ to their feasibility 'by a qualified individual with structural practices designed by a qualified engineer.
/lOk~
ml!!
.'
All eros~OD abd sediment control measures shall meet tbe design critan-l1I, riaodards, aDd spec1fteatlons outllbed in the
"Indiana Hau.dbook for Erosion Controlln Developing A..-eas" or similar Enidance documents.
CulrentSitelt1fonnatioo: 'Bu;ldillf.JS 1114"- 5''I-~ 1AJ1J1'/r 96,\ t~"'Y';;~/ ~'4f
~: : :~fi:t e~~~ ftt"l!t: ~~d~~8~d $.i~ I4JlrJ
The Following Items Have Been Evaluated and Assigned a DesiloadoD of:
S - SaUsfaetory Mil!! Marainal U ~ Unsatisfactory NA ;;; Not Applt~able
Construction Site ManageUleDt for ~rosion and Sediment Control
S M tJD NA (1) Disturbed areas have been adequately protected through seeding or other appropriate erosion and
sediment eontrol measures.
S M aI> NA (:1) Appropriate perimeter sediment control measures have been implemented.
~ M U NA (3) Conveyance channels have been stabilized or protected with appropriate sediment.control measures.
S M U CEi) (4) Erosion & sediment control m~sures are installed properly.
S M U @ (5) Storm drain inlets have been adequately protected.
c:J> M U NA (6) Outlets have been adequately stabilized.
S M (i) NA (7) B~istini erosion & sediment control measures ate beinS maintained.
IS) . M U NA (8) Public & private roadways are being kept clear of aooumulBted sediment OJ tracked soil.
S M U cS:>(9) Erosion &. sediment control measures have been installed and mamtained on individual building sites.
StatUI of Sed'lmeot Retention On-Site
~ Site conditions present a high potential for off..site sedimentation.
D There is evidence of off site sedimentation.
~ Description provided:
j)'lruJf8~t) I..ANO PItAI~S /)11!.~{!,r,r TO SHAI.'- t!,~J(,
mJ Pl~se Reter to the Comments Section of this Report
Compiled By; Defmitions
Satisfactory: The item Is currently in compliance with the rule
Marginal: . A concern bas beeD Identified; corrective action is strongly recommended to remalnUt compllanl;e
Unsatisfactory: A "tolation hr. beeb Identjfied and the site Is not In compliance; corrective .etlon Is required
Not Ap~lieable~ Does not apply at tbjs stage of coastrlldioD Reviled 4/98