Loading...
HomeMy WebLinkAboutCorrespondence Date: _ .J l. ../. .tJ / rite. ~k~~7'- HAMILTON CO .A )~ PAGE 04/09 .01 ~ ON-SITE EVALUATION FOR EROSION AND SEDIMENT CONTROL HamJItOD County SoU and Water CODsen'atioD Distriet 1108 South 9th Street, NOblesville, IN 46060 Telephone: 317-773-2181 Fax: 317.776-1101 ~ ~~/07/2001 12:23 31"2 16-1101 Project Name: Ptesent at Site: John SOUth, HamlltoD Co. SWCD, _ ~. report was PrOVid~ To: Iriti~* Si~~J'; .rl-' n/"'WltfJOI." .::La.} . Type OF EVALTJATION: I "'~Z"lO tJ Initial D Routine I Follow-up (J Complaint This evaluation is intended to assess the level of compliance with 321 lAC 15-5 (Rule S). It is ZlIso intended to identify areas where additional measures iDay be required to control erosion and sedimentation. All practices recommended in this report should be . evaluated 8.$ to their feasibility 'by a qualified individual with structural practices designed by a qualified engineer. /lOk~ ml!! .' All eros~OD abd sediment control measures shall meet tbe design critan-l1I, riaodards, aDd spec1fteatlons outllbed in the "Indiana Hau.dbook for Erosion Controlln Developing A..-eas" or similar Enidance documents. CulrentSitelt1fonnatioo: 'Bu;ldillf.JS 1114"- 5''I-~ 1AJ1J1'/r 96,\ t~"'Y';;~/ ~'4f ~: : :~fi:t e~~~ ftt"l!t: ~~d~~8~d $.i~ I4JlrJ The Following Items Have Been Evaluated and Assigned a DesiloadoD of: S - SaUsfaetory Mil!! Marainal U ~ Unsatisfactory NA ;;; Not Applt~able Construction Site ManageUleDt for ~rosion and Sediment Control S M tJD NA (1) Disturbed areas have been adequately protected through seeding or other appropriate erosion and sediment eontrol measures. S M aI> NA (:1) Appropriate perimeter sediment control measures have been implemented. ~ M U NA (3) Conveyance channels have been stabilized or protected with appropriate sediment.control measures. S M U CEi) (4) Erosion & sediment control m~sures are installed properly. S M U @ (5) Storm drain inlets have been adequately protected. c:J> M U NA (6) Outlets have been adequately stabilized. S M (i) NA (7) B~istini erosion & sediment control measures ate beinS maintained. IS) . M U NA (8) Public & private roadways are being kept clear of aooumulBted sediment OJ tracked soil. S M U cS:>(9) Erosion &. sediment control measures have been installed and mamtained on individual building sites. StatUI of Sed'lmeot Retention On-Site ~ Site conditions present a high potential for off..site sedimentation. D There is evidence of off site sedimentation. ~ Description provided: j)'lruJf8~t) I..ANO PItAI~S /)11!.~{!,r,r TO SHAI.'- t!,~J(, mJ Pl~se Reter to the Comments Section of this Report Compiled By; Defmitions Satisfactory: The item Is currently in compliance with the rule Marginal: . A concern bas beeD Identified; corrective action is strongly recommended to remalnUt compllanl;e Unsatisfactory: A "tolation hr. beeb Identjfied and the site Is not In compliance; corrective .etlon Is required Not Ap~lieable~ Does not apply at tbjs stage of coastrlldioD Reviled 4/98