HomeMy WebLinkAbout2012 Sewer Bond pay request 28 minumumal 2Carmel Utilities'- :-: :::'-i'
City of Carmel Utilities
760 Third Avenue S.W.,Ste.110•Carmel,IN 46032
Phone:(317)571-2443•Fax:(317)571-2265
www.carmel.in.gov
EXHIBIT B
Disbursement Direction # 28
E-Mail or FAX the signed Disbursement Direction to:
The Huntington National Bank Corporate Trust Department(INHP22) Attn: Kim Wilson Tel: (317) 229-
4094 Fax: (317)229-4094 E-Mail: Kim.Wilson(w.huntington.com
Re: Depositary Agreement between the City of Carmel and The Huntington National Bank,
dated May 16, 2012 -Trust#4087000067
Dear Kim:
On April 29, 2014 , you are hereby authorized and directed, as the Depositary under the above-referenced
Agreement, to pay the amounts set forth on the attached Register of Claims from the above-referenced
Trust account and overnight checks to:
Carmel Utilities
Attn: Lisa Kempa
30 West Main Ste 220
Carmel, IN 46032
City of Carmel, Indiana
,ettpuu
By:
i
Name: Diana L. Cordray Title: Clerk-Treasurer
(*) Your Alternate contact at Huntington National Bank will be:
Ellen Campbell-Tel # (616)235-5941 Ellen.Campbell @huntington.com
CARMEL UTILITIES
Register of Claims
4/29/2014
PAYMENT REQUISITION NO 28
AMOUNT OF Wire
VENDOR ADDRESS FUND CLAIM MEMORANDUM Instructions
2207 Collections
Center Dr Chicago, IL
Hach Chemical Co 60693 Cons $ 1,940.00 testing
2207 Collections
Center Dr Chicago, IL
Hach Chemical Co 60693 Cons $ 1,940.00 testing
3103 Executive
Parkway Ste 300
Jones&Henry Engineers Toledo,OH 43606 Cons $ 6,230.96 engrg services
3103 Executive
Parkway Ste 300
Jones&Henry Engineers Toledo,OH 43606 Cons $ 7,676.70 engrg services
3103 Executive
Parkway Ste 300
Jones&Henry Engineers Toledo,OH 43606 Cons $ 8,662.50 engrg services
3103 Executive
Parkway Ste 300
Jones&Henry Engineers Toledo,OH 43606 Cons $ 11,093.48 engrg services
4520 St Rd 37
Layne Inliner Orleans,IN 47452 Cons $ 313,830.90 construction
PO Box 2533
MK Betts Engineering Anderson, IN 46018 Cons $ 278,810.00 construction
1625 North Post Road
United Consulting Indianapolis, IN 46219 Cons $ 2,351.00 services
TOTAL $ 632,535.54
ALLOWANCE OF CLAIMS
We have examined the claims lis ed on the foregoing Register of Claims,consisting of 1 page,and except for claims not allowed as
shown on the register s h cla s are hereby allowed in the total amount of $632,5 5.54 5.q
John Du i, Utility Dir c D to
PLEASE OVERNIGHT CHECKS TO:
Carmel Utilities
Attn: Lisa Kempa
30 West Main St Ste 220
Carmel,IN 46032
:'-:4 - 0 INVOICE NUMBER 8786988
HACH DATE: 04/15/2014
Page: 1
Be Right"'
DETACH:TOP RTIO'VAND.RETURNWIT 'PAYMENT T0::= TOTAL: $1,940.00 i
Hach Company
2207 Collections Center Drive
Chicago, IL 60693 Have you ordered online ?
Phone: (800) 227-4224 Order at WWW.HACILCOM
87869889 008330458 00000194000 041514
Sort Seg: 694 Tray: 10 DETACH HERE Original
INVOICE NO 8786988 I DATE: 1 04/15/2014
s I.III I..II IIIII..I1III1I.III11'1I"11II1I11III1.II.I11IIII1I'I'11 PURCHASE
0 ORDER
L CITY OF CARMEL NUMBER
Wastewater Treatment Plant
D 760 3rd Ave SW TERMS Net 45 Days From Invoice Date
T Carmel, IN 46032-2072
O United States FREIGHT
•
s CARRIER
H CITY OF CARMEL ACCOUNT 833045
I 760 3RD AVE SW Remit to:
REF. NO, HACH248387
P WASTEWATER TREATMENT PLANT Hach Company
CARMEL, IN 46032-2072 2207 Collections Center Dr
T United States Chicago,IL 60693
O Phone:(800)227-4224
These commodities are sold,packaged,marked,and labeled for destinations in the United States Exportation of these commodities may require special licensing,packaging,marking or labeling.
LN# PRODUCT DESCRIPTION ITEM NO. QUANTITY UNIT PRIC EXT. PRICE
1 DDS SERVICE LEVEL 2 MID TERM Monthly DDS-SL2-MT 1 970.00 970.00
Charge:1::11/15/2013:05/14/2014
2 DDS SERVICE LEVEL 2 MID TERM Monthly DDS-SL2-MT 1 970.00 970.00
Charge:1::11/15/2013:05/14/2014
ORDER CONTACT: SUBTOTAL 1,940.00
TAX 0.00
. Notes: INVOICE TOTAL 1,940.00
PURCHASE AND ACCEPTANCE OF PRODUCT(S)SUBJECT TO HACH COMPANY'S TERMS AND CONDITIONS OF SALE,
PUBLISHED ON HACH COMPANY'S WEBSITE AT WWW-HACH.COM/TERMS
For order discrepancies or product exchanges please call 800-227-4224 or 970-669-3050 to obtain Return Authorization.
FEDERAL TAX ID#42-0704420
Environmental 4-welt" e . 0
R Test systemsr 1i Other brands
from Hach
' YFyRrOtSt Q( PION Products 8 tiP3V1 @C , nJ
• iIij .. ® INVOICE NUMBE- DATE: 03/15/2014
n .. Page: 1
Be Right."'
t d .R TOTAL: $1,940.00
DETaC1i�TQP POItTIfl\6A,\D ItET[�[t��S-ITH P41�AIE\;I'��fl
Hach Company
2207 Collections Center Drive
Chicago, IL 60693 Have you ordered online ?
Phone: (800) 227-4224 Order at WWW.HACH.COM
87417325 008330458 00000194000 031514
Sort Seg: 570 Tray:. 11 DETACH HERE Original
INVOICE NO 8741732 I DATE: 1 03/15/2014
s IPI11I'1'lnn lll'I'I'll"II'I'I'III'I"111111111IIPr111I11II11 PURCHASE
O CITY OF CARMEL ORDER
L NUMBER
D Wastewater Treatment Plant Net 45 Days From Invoice Date
760 3rd Ave SW TERMS
T Carmel,IN 46032-2072
o United States FREIGHT
S CARRIER
H CITY OF CARMEL ACCOUNT 833045
1 760 3RD AVE SW REF. NO. _HACH248387 'Remit to:
P WASTEWATER TREATMENT PLANT
Hach Company
CARMEL, IN 46032-2072
T United States 2207 Collections Center Dr
0 Chicago,!L 60693
Phone:(800)-227-4224
These commodities are sold,packaged,marked,and labeled for destinations in the United States. Exportation of these commodities may require special licensing,packaging,marking or labeling.
LN# PRODUCT DESCRIPTION ITEM NO. QUANTITY UNIT PRIC EXT. PRICE
1 DOS SERVICE LEVEL 2 MID TERM Monthly DDS-SL2-MT 1 970.00 970.00
Charge:1::11/15/2013:05/14/2014
2 DDS SERVICE LEVEL 2 MID TERM Monthly DDS-SL2-MT 1 970.00 970.00
Charge:1::11/15/2013:05/14/2014
ORDER CONTACT: SUBTOTAL 1,940.00
TAX 0.00
Notes: INVOICE TOTAL 1,940.00
PURCHASE AND ACCEPTANCE OF PRODUCT(S)SUBJECT TO HACH COMPANY'S TERMS AND CONDITIONS OF SALE,
PUBLISHED ON HACH COMPANY'S WEBSITE AT WWW.HACH.COM/TERMS
For order discrepancies or product exchanges please call 800-227-4224 or 970-669-3050 to obtain Return Authorization.
FEDERAL TAX ID#42-0704420
Environmental /'~ " • Other brands
"" Test Systems IIC. ACH
- from Hach
--^--"-rHydrom6t F lmv Products R Services A Mgr,c a..r - a
Jones & Henry Engineers, Ltd.
3103 Executive Parkway, Suite 300
Toledo, Ohio 43606
Flamm Enginsem Uri 419.473.9611
CITY OF CARMEL Invoice number 64300
MR.JOHN DUFFY Date 03/10/2014
UTILITY DIRECTOR
30 WEST MAIN STREET SUITE 220 Project 00451-6770 SEWER REHAB
CARMEL, IN 46032
Professional services performed through February 28, 2014
Professional engineering services in connection with the review and evaluation of the collection system and
assistance during sewer rehabilitation projects in conformance with our agreement No.4-12.
The project fee is$130,000.
9-001 SEWER REHAB
Labor
Billed
Units Rate Amount
CONSTRUCTION SERV SPECIALIST 29.00 87.00 2,523.00
INTERN 17.00 45.00 765.00
PRINCIPAL 12.00 142.00 1,704.00
TECHNICIAN 13.00 73.00 949.00
Labor subtotal 71.00 5,941.00
Reimbursable
Cost Billed
Amount Multiplier Amount
OTHER CONTRACT COST 37.00 1.10 40.70
PRINTING,COPYING,BLUEPRINTING 226.60 1.10 249.26
Reimbursable subtotal 263.60 289.96
Phase subtotal 6,230.96
Invoice total 6,230.96
Contract Summary
Contract Prior Current Total
Description Amount Billed Billed Billed
9-001 SEWER REHAB
Total 130,000.00 104,653.98 6,230.96 110,884.94
Thank you for your business.
Page i
g�
IUD Jones & Henry Engineers, Ltd.
3103 Executive Parkway, Suite 300
Toledo, Ohio 43606
. &,„„„ 419.473.9611
CITY OF CARMEL Invoice number 64304
MR.JOHN DUFFY Date 03/10/2014
UTILITY DIRECTOR
30 WEST MAIN STREET SUITE 220 Project 00451-6846 CARMEL/SMALL
CARMEL, IN 46032 PROJECTS 2013-2014
Professional services performed through February 28, 2014
Professional engineering services in connection with various small projects as requested by the City per our
letter agreement 4-13 and Professional Services Agreement dated November 3, 1999.
The proijected fee is$25,000.
9-001 SMALL PROJECTS 2013-2014
Labor
Billed
Units Rate Amount
CONSTRUCTION SERV SPECIALIST(Sti-f c� 5C-Vrtis,. e/ r�(-•e-') 12.00 90.00 1,080.00
PRINCIPAL Sc- M 12=c ki'1 8.00 148.00 1,184.00
SENIOR ENGINEER — 39.00 115.00 4,485.00
Labor subtotal 59.00 6,749.00
Reimbursable
Cost Billed
Amount Multiplier Amount
Transportation Costs 843.36 1.10 927.70
Phase subtotal 7,676.70
Invoice total 7,676.70
Contract Summary
Contract Prior Current Total
Description Amount Billed Billed Billed
9-001 SMALL PROJECTS 2013-2014
Total 25,000.00 15,855.19 7,676.70 23,531.89
Thank you for your business.
Page 1
Jones & Henry Engineers, Ltd.
3103 Executive Parkway, Suite 300
Toledo, Ohio 43606
419.473.9611
CITY OF CARMEL Invoice number 64299
MR.JOHN DUFFY Date 03/10/2014
UTILITY DIRECTOR
30 WEST MAIN STREET SUITE 220 Project 00451-6733 106TH ST.PUMP STATION
CARMEL, IN 46032 INTERCEPTOR
Professional services performed through February 28,2014
Professional engineering services in connection with the design and construction of capacity improvements to
the 106th St. Pump Station and the North-South Interceptor in conformance with our agreement no.4-12.
The project fee is$280,000.
9-001 PUMP STATION IMPROVEMENTS
Labor
Billed
Units Rate Amount
INTERN 6.00 45.00 270,00
SENIOR ENGINEER 52.00 105.00 5,460.00
TECHNICIAN 42.50 69.00 2,932.50
Labor subtotal 100.50 8,662.50
Phase subtotal 8,662.50
Invoice total 8,662.50
Contract Summary
Contract Prior Current Total
Description Amount Billed Billed Billed
9-001 PUMP STATION IMPROVEMENTS
9-002 N-S INTERCEPTOR
9-003 CONSTRUCTION
Total 280,000.00 184,224.15 8,662.50 192,886.65
Thank you for your business.
Page 1
tair, Jones & Henry Engineers, Ltd.
3103 Executive Parkway, Suite 300
Toledo, Ohio 43606
""°'f, 419.473.9611
CITY OF CARMEL Invoice number 64298
MR.JOHN DUFFY Date 03/10/2014
UTILITY DIRECTOR
30 WEST MAIN STREET SUITE 220 Project 00451-6531 WWTP SECONDARY
CARMEL, IN 46032 EXPANSION
Professional services performed through February 28,2014
Professional engineering services in connection with a new final calrifier,septage receiving, belt filter press,
diversion structure covers and modifications to final clarifier 1 in conformance with our Letter Agreement No. 1-
12 as authorized by Professional Services Agreement dated November 3,The projected fee is$386,000.
9-001 DSGN-SECONDARY EXPANSION
Reimbursable
Cost Billed
Amount Multiplier Amount
MAILING COST!UPS COSTS 27.48 27.48
9-002 CONST-SECONDARY EXPANSION
Labor
Billed
Units Rate Amount
CONSTRUCTION SERV SPECIALIST 40.00 84.00 3,360.00
PRINCIPAL 29.00 139.00 4,031.00
SENIOR ENGINEER 35.00 105.00 3,675.00
Labor subtotal 104.00 11,066.00
Phase subtotal 11,066.00
Invoice total 11,093.48
Contract Summary
Contract Prior Current Total
Description Amount Billed Billed Billed
9-001 DSGN-SECONDARY EXPANSION
9-002 CONST-SECONDARY EXPANSION
Total 386,000.00 359,340.75 11,093.48 370,434.23
Thank you for your business.
Page 1
Contractor's Application For Payment No. 2
Application Period:December 2,2013-April 9,2014 Application Date:April 15,2013
To(Owner): City of Carmel,Indiana From(Contractor): Layne Inliner,LLC Via(Engineer):Jones&Henry Engineers,LTD
Project: Contract 81(Sewer and Manhole Rehabilitation) Contract: Contact 81
Owner's Contract No.:Contract 81 Contractor's Project No.:27882 Contract P.O.Number:
Application for Payment
Change Order Summary
Approved Change Orders 1. ORIGINAL CONTRACT PRICE
$438,550.00
Number Additions Deductions 2. Net change by Change Orders $96,087.02
Change Order No.1 $ 83,410.00 3. CURRENT CONTRACT PRICE(Line 1±2) $634,637.02
Change Order No.2-PENDING $ 12.677.02 4. TOTAL COMPLETED AND STORED TO DATE $534,637.02
6. RETAINAGE:
a. 5 %x$_Work Completed $21,927.50
b. 6 %x$ Stored Material $0.00
c. Total Retalnage(Line 6a+Line 5b) $21,927.60
6. AMOUNT ELIGIBLE TO DATE(Line 4-Line 5c) $512,709.52
TOTALS $ 96,087.02 $ - 7. LESS PREVIOUS PAYMENTS $198,878.62
8./AMOUNT DUE THIS'APPLICATION : • ". $313,830.90
NET CHANGE BY CHANGE ORDERS $ 96,087.02 9. BALANCE TO FINISH,INCLUDING RETAINAGE $21,927.50
is recommended by: I1{/Z /il
Contractor's Certification (Engineer) (Date)
The undersigned Contractor certifies that: (1)all previous progress payments received from Owner is recommended by:
on account of Work done under the Contract have been applied on account to discharge (Date)
Contractor's legitimate obligations incurred in connection with Work covered by prior Applications for
Payment;(2)title of all Work,materials and equipment incorporated in said Work or otherwise listed
in or covered by this Application for Payment will pass to Owner at time of payment free and clear of Payment of. $
all Liens,security interests and encumbrances(except such as are covered by a Bond acceptable to (Line 8 or other-attach explanation of other amount)
Owner indemnifying Owner against any such Liens,security interest or encumbrances);and(3)all
Work covered by this Application for Payment is in accordance with the Contract Documents and is
is approved by:
not defective.
(Owner) (Date)
By: Date: Approved by:
Funding Agency(if applicable) (Date)
EJCDC No.C-620(2002 Edition)
Prepared by the Engineers'Joint Contract Documents Committee and endorsed by the Associated General Contractors of America and the Construction Specifications Institute.
Page 1
APPLICATION AND CERTIFICATE FOR PAYMENT AIA DOCUMENT 0702 (Instructions on reverse sides PACE ONE OF PAGES
TO (OWNER): City of Carmel PROJECT: Final Clarifier & Misc. APPLICATION NO:Thirteen Distribution to:
Once Civic Square Improvements – Contract 79 (13) L; OWNER
Carmel, IN 46032 PERIOD TO: 03/31/14 C ARCHITECT
C CONTRACTOR
FROM (CONTRACTOR): VIA (ARefiVrEt : ARCHITECT'S ' C
M. K. Betts Engineering Engineer: Jones & Henry Engineers PROJECT NO: C
& Contracting, Inc.
CONTRACT FOR: Invoice 13-124. 13 CONTRACT DATE:
CONTRACTOR'S APPLICATION FOR. PAYMENT Continua ion Sh et,fAlA Document G703,tiss att chedconnection with the Contract.
CHANCE ORDER SUMMARY 1. ORIGINAL CONTRACT SUM $ 3,423,000.00
Change Orders approved in I ADDITIONS DEDUCTIONS 2. Net change by Change Orders , $ (77,841.50)
previous months by Owner 3. CONTRACT SUM TO DATE (Line 1 -L-2) $ 3,345,158.50
TOTAL 4. TOTAL COMPLETED & STORED TO DATE $ 2,721,937.32
•
Approved this Month (Column G on G703)
Number Date Approved 5. RETAINAGE:
—C0I61 + 24 391.50 $102,233.00 a. — % of Completed Work $
$ – (Column D+E on G703)
b. _ % of Stored Material $
(Column F on G703)
Total Retainage (Line 5a+5b or
TOTALS + $ 24,391.50 – $102,233.00 Total in Column I of G703) $ 171 ,150.00
Net change by Change Orders 6. TOTAL EARNED LESS RETAINAGE $ 2,550,787.32
g g – $ 77,841.50
The undersigned Contractor certifies that to the best of the Contractor's knowledge, (Line 4 less Line 5 Total)
information and belief the Work covered by this Application for Payment has been 7. LESS PREVIOUS CERTIFICATES FOR
completed in accordance with the Contract Documents, that all amounts have been PAYMENT (Line 6 from prior Certificate) $ 2,271,977.32
paid by the Contractor for Work for which previous Certificates for Payment were 8. CURRENT PAYMENT DUE $ 278,810.00
issued and payments received from the Owner, and that current payment shown 9. BALANCE TO FINISH, PLUS RETAINAGE $ 794,371.18
herein is now due.
(Line 3 less Line 6)
CONTRACT()' M. K. Betts Engineering & Contracting, Inc.. State of: Indiana County of: Madison
Subscribed and sworn to before me this 31st day of March , 2014
Notary Public: vim.
B . . ��✓ /«�i.�� Date: March 31 , 2014 My Commission expires: October 28 , 2015 .
l
ARC ECT'S CERT1FIC ;0"E FOR PAYMENT AMOUNT CERTIFIED S
(Attach explanation if a •.unt certified differs from the amount applied for.)
In accordance with the Contract Documents, based on on-site observations and the ARCHITECT:
data comprising the above application,the Architect certifies to the Owner that to the
_ 7 l/�
best of the Architect's knowledge,information and belief the Work has progressed as g., . Date:
indicated,the quality of the Work is in accordance with the Contract Documents,and This Certificate is not negotiable. The AMOUNT CERTIFIED is payable only to the
the Contractor is entitled to payment of the AMOUNT CERTIFIED. Contractor named herein. Issuance,payment and acceptance of payment are without
prejudice to any rights of the Owner or Contractor under this Contract.
Ala n nr11nAFAIT.r-M• a7D1 it]Tif'... .�,r,rcr.v,r,r.., ran n......... _ ..... ...... - _.-
P/5
1625 North Post Road
UNITED
Indianapolis, IN 46219
Bus. (317) 895 2585
Consulting= Fax (317)895-2596
Carmel Utilities Invoice number 1390101-13
John Duffy, Director Date 04/16/2014
30 West Main Street
Carmel, IN 46032 Project 13-901 Carmel -Cool Creek Bank
Stabilization Project
For Professional Services Rendered Through: March 31, 2014
Project No.: 13-901-01 Carmel Utilities-Task Order No. 2013-1
Project Description: Cool Creek Bank Stabilization Project
Professional Engineering Services in connection with the above referenced project. This period we continued
erosion control design and final bid document preparation.
We appreciate having the opportunity to work with Carmel Utilities.
Please feel free to contact our office if you have questions about this invoice or project.
Invoice Summary
Contract Percent Prior Total Current
Description Amount Complete Billed Billed Billed
13-901-01 Survey&Right of Way I Property Line 6,300.00 100.00 6,300.00 6,300.00 0.00
Services
13-901-01 Design&Permitting Services 53,100.00 52.47 25,509.80 27,860.80 2,351.00
13-901-01 Bid Phase Services 10,500.00 0.00 0.00 0.00 0.00
13-901-01 Construction Phase Services 34,300.00 0.00 0.00 0.00 0.00
13-901-01 Additional Temporary Land Acess 5,000.00 32.60 1,630.00 1,630.00 0.00
Services
Total 109,200.00 32.78 33,439.80 35,790.80 2,351.00
Design&Permitting Services
Professional Fees
Billed
Hours Rate Amount
Principal
Keith Bryant
Project Time 3.00 190.00 570.00
Project Engineer
Scott M. Siple
Project Time 10.00 125.00 1,250.00
CADD Designer
Darcy A. Robinette
Project Time 4.50 118.00 531.00
Invoice total 2,351.00
Carmel Utilities Invoice number 1390101-13
Page 1 of 2
Carmel Utilities Invoice number 1390101-13
Project 13-901 Carmel-Cool Creek Bank Stabilization Project Date 04/16/2014
Approved by:
Keith Bryant
Vice President
Carmel Utilities Invoice number 1390101-13
Page 2of2