Loading...
HomeMy WebLinkAboutCorrespondence Donahue-Wold, Alexia K From: Duncan, Gary R Sent: Thursday, May 01, 2014 11:11. AM To: Heidi Shurts (hashurts @gmail.com), Dennis Brackenridge (dbrackenridge @yahoo.com);Wayne Olander(wayne @arteffects.cc) Cc: Barnes, David R; Boone, Tiffany; Conn, Angelina V; Donahue-Wold, Alexia K; Glaser, Fred J, Jordan, Alex; Kashman,Jeremy M; Keesling, Rachel M;Thomas, John G Subject: City of Carmel Docket 14040003 V Brackenridge Addition, Cool Creek Estates, Sec. 1 Lot 9 Follow Up Flag: Follow up Flag Status: Completed Good afternoon. I have reviewed the plans submitted for the addition and have the following questions/comments: 1. The lot is less than 0.25-acres and does not need to provide detention or post construction storm water quality measures. 2. Is the finish floor elevation of the addition the same as the existing building? 3. Please confirm if new sidewalk is being constructed with this project. 4. Please confirm if any new storm piping is being constructed/installed with this project. 5. Please provide a construction phase erosion and sediment control plan with the construction entrance shown. 6. Please check with Fred Glaser as to the need for a right-of-way permit and bond for construction access from the City right-of-way. 7. Has a grading plan been developed? I am not requiring one for this project based on the GIS contours; but if one has been developed, I would prefer to see it. 8. Please confirm that all existing and proposed easements are indicated on the plot plan. 9. Please confirm the need for any of the following,which require approval by the Board of Public Works and Safety: a. Any road or lane closures or restrictions b. Any sidewalk closures c. Reconstructing or modifying the existing drive or building a new drive. Is a new drive proposed? If so, the portion of the driveway within the right-of-way shall conform to City standards in all respects. d. Any open pavement cuts for utility services or other needs. e. Irrigation or other site improvements within an easement or right-of-way. 10. So that we can identify conformance to the Property Maintenance Code, please indicate the following on the plot plan, as applicable: a. Sump pump pipe discharge points b. Pool or hot tub filter pipe discharge points 1 view-a siy;6upuud ano;aq;uawuoJinue ay;JapIsuoo aseald K9 no •ul•lawaeD @ueaunpV (xel) 6£fZ-ILS (LIE) Z1717Z-ILS (LIE) Z£09ti NI lawaeD aienby D!AD auo Sulaaau!Su3 to wawlaedaa lawaep Jo 43 aaa0u3 luelslssy 3d `•Jf`ueouna j AaeD Amp lyanw os s)jueyl .yaps se aaeplpul aseald `pasn aq lllM sped gselds JI s}ulod aaaeyaslp 0140 uleJp jooa •a