EROSION CONTROL:
A TEMPORARY SEEDING MIXTURE IN THE AREAS WHERE STRIPPING
OR FILL HAVE BEEN GRADED SHALL BE SEEDED FOR SILT EROSION
PROTECTION IMMEDIATELY AFTER GRADING. ALL CONSTRUCTION
AREAS ARE TO BE SEEDED AS FOLLOWS:
A. SWALE SEEDING: SEED AND FERTILIZE WITHIN CONSTRuCT1UN
LIMITS WITH 5# /ACRE "REDTOP GRASS ", 20# /ACRE '•RTE
GRASS ", 20,# /ACRE "BLUEGRASS ", 25# /ACRE "FESCUE" AND
600,E /ACRE 12 -12 -12 FERTILIZER.
B. CUT /FILL SEEDING (ALONG PAVED AREAS): SEED AND FERTILIZE
WITH 25# /ACRE "FESCUE ", 20# /ACRE "RYE GRASS ", ligi /ACRE
"BLUEGRASS" AND 60011 /ACRE 12 -12 -12 FERTILIZER
C. SEEDED AREAS SHALL HAVE A SUITABLE MULCH APPLIED FUR
EROSION AND SILT CONTROL MULCH MAY BE STRAW, SHREDUEU
HARDWOOD OR EROSION CONTROL MAT.
D. DEVELOPERS OPTION: CONSTRUCTION AREAS REQUIRING EROSION
CONTROL MAY BE HYDROSE,LDED IN ACCORDANCE WITH ABOVE SEED
AND FERTILIZER SPECIFICATIONS.
PLAN VIEW
STRAW BALES BURIED 3"
STORM BEEHIVE
3' -#4 REBAR STAKE
2'X6" SILT TRAP
TYPICAL SLOTTED RISER
(CAN BE USED INSTEAD
OF STRAW BALES)
TYPICAL SLOTTED RISER
(CAN BE USED INSTEAD
OF STRAW BALES)
STORM BEEHIVE
3 - #4 REBAR STAKE
.��STRAW BALES BURIED 3"
E,4_� \ 2'x6" SILT TRAP
I—
ICI , =���� ►� ���� -111
III ?, ,n cl I.ic�l' ���fill
�1� 311= -If •II.
•
(NO SCALE)
7. SILT TRAPS ARE TO PROTECT ALL EARTH DITCH INLETS, EXISTING WATER SHEDS
AND PREVENT SILTATION ON ADJACENT PROPERTIES. SILT TRAPS AND INLET PROTECTION
TO BE INSTALLED IMMEDIATELY AFTER INSTALLATION OF EACH INLET.
Sri
8. IF EROSION CONTROL IS DISTURBED, IT SHALL BE REPAIRED IMMEDIATELY AFTER
INTERUPTIVE SEQUENCE IS COMPLETE..
PERMANENT VEGETATIVE STABILIZATION
MULCH MAY BE APPLIED ANY TIME CONDITIONS ARE SUITABLE
FOR SPREADING ANCHORING REGARDLESS OF VEGETATIVE COVER. SOME
EXAMPLES OF SUITABLE MULCH INCLUDE:
1. AIR DRIED WHEAT, BARLEY, OAT, OR RYE STRAW, FREE FROM
NOXIOUS WEEDS AND OTHER FOREIGN MATTER. IT SHOULD BE
SPREAD UNIFORMLY SO 80% OF THE SURFACE IS COVERED FIVE OR
SIX STRAWS THICK (TWO BALES PER 1000 SO. FT. OR
APPROXIMATELY TWO TONS PER ACRE).
2. EXCELSIOR BLANKET, JUTE NETTING, PAPER FABRIC, OR A
SIMILAR SYSTEM APPLIED ACCORDING TO MANUFACTURERS'
SPECIFICATIONS.
3. WOOD CELLULOSE FIBER MIXED WITH WATER AND APPLIED WITH A
HYDRO- SEEDER TO FORM A DENSE MAT AFTER DRYING. IT IS BEST
SUITED TO SITES HAVING SLOPES LESS THAN 3% IN GRADE AND
LESS THAN 150 FEET IN LENGTH.
WOOD CELLULOSE FIBER SHOULD NOT CONTAIN GROWTH OR
GERMINATION INHIBITING FACTORS AND SHOULD BE DYED GREEN FOR
METERING. IT SHOULD BE APPLIED IN A UNIFORM MANNER AT A RATE
OF 1,200 POUNDS PER ACRE. MIXING AND APPLICATION SHOULD BE
PERFORMED IN ACCORDANCE WITH THE MANUFACTURER'S
SPECIFICATIONS.
STRAW MULCH SHOULD BE ANCHORED BY PRESSING STRAW INTO
THE SOIL A DEPTH OF TWO INCHES WITH THE USE OF A MULCH
ANCHORING TOOL, OR SECURING WITH TWINE OR HEAVY STRING AROUND
PEGS OR STAPLES.
ALL MULCH INSTALLATION TECHNIQUES ARE TO CONFORM WITH THE
URBAN DEVELOPMENT PLANNING GUIDE, FOURTH EDITIUN, JUNE 1990.
This site does not contain any wetlands according to the
National Wetlands Inventory map of Carmel, Indiano dated 1990.
U.S. Department of the Interior, Fish & Wildlife Service.
9
6
POST
4" DIA. w oD oR
1,33 LBS %FOOT STEEL
10' MAX. SPACING
I
WIRE FENCE
14 (SAGE (MIN -E" MESH`
SPACING (MAC) FASTENED
13Y I' WIRE AC 1'
-
I i I
I WIRES, R HOC k
TIE L u uv INVS (l
FILTER FABRIC AWN(;II
LENGTH (NO J0t1vTS)
STAPLE vR WIRE 10 FENC:E�i =
4 "x4" 1RLNCH 1U
BE BACK.FILLED
AND COMPACTED \�
1 DOWN -
UPSLUF E I SLOPE
_
1 - I-
C_
t i �
I
u;
F�
SILT FENCE SECTION
i NO SSCALE)
MAINTENANCE:
1. INSPECT WEEKLY AND AFTER EACH STORM EVENT:
2. IF FABRIC IS TORN OR DETERIORATED, REPLACE SECTION IMMEDIATELY.
3. REMOVE SEDIMENT WHEN HEIGHT REACHES 1/3 OF THE HEIGHT OF THE
FENCE OR IS CAUSING FABRIC TO BULGE.
4. TAKE CARE NOT TO UNDERMINE THE ENTRENCHED FABRIC.
5. AFTER DRAINAGE AREA IS STABILIZED, REMOVE FENCE AND SEDIMENT,
BRING DISTURBED AREA TO GRADE AND STABILIZE IT.
HATER G
RTCH
FEI
t
4 1 3
STABILIZATION
PRACTICE_ JAN. FEB. MAR. APR. MAY JUNE JULY AUG. SEPT. OCT. NOV. DEC.
PERMANENT A- `�� / / / /I / / %/*
�LELANG
uvRhtAld 7 8 ' -'�•"� B '-��
t Mi vtfAlt T � ; -.�D
St t;DINC
htuL F,�Iv:, •.
A = rENTUCKT BLUEGRASS 40 LBS /ACRE, CREEPING RED FESCUE 4U LBS /ACRE;
PLUS 2 TONS STRAW MULCH /ACRE, OR ADD ANNUAL R TEGRASS 20 LBS /ACRE
8 - rENTUCKY BLUEGRASS 60 LBS /ACRE; CREEPING RED FESCUE 60 LBS /ACRE,
PLUS 2 TUNS STRAW MULCH /ACRE, OR ADD ANNUAL RYEGRASS 30 LBS /ACRE
C = SPRING OATS 3 BUSHEL /ACRE
D = WHEAT OR RYE 2 BUSHEL /ACRE.
E = ANNUAL RYEGRASS 4U LBS /ACRE.
F = SOD
G - STRAW MULCH 2 TUNS /ACRE.
• /I /• IRRIGATION NEEDED DURING JUNE, JULY, AND /OR SEPTEMBER
•• IRRIGATION NEEDED FUR 2 TO 3 WEEKS AFTER APPLYING SOD
SEASONAL SOIL PROTECTION CHART
SIDE RIP -RAP
ENERGY DISIPATOR FOR STORM
WATER OUTLET INTO LAKE)
(NO SCALE)
TOTAL ACREAGE = 16.54 - DISTURBED ACREAGE 15,7 *Existing vegetation
in Block C and 97' Conservation Easement to remain undisturbed - See Sheet #9)
RECEIVING WATER WILL BE WILLIAMS CREEK.
le INE[
Ullii' -LINE i
Fail- I"uw: c NosT
• .� nit,ti YiNUil ill
NOTE; AYOIDING DAMAGE DURING CONSTRUCTION
THE SUREST WAY TO PROTECT TREES TmT ARE TO BE SAVED S Tu
(1) WORK WITH THE BUILDER TO LOCATE AND MARK WITH FLA(;0NG AND /OR
Swiv> ALL ONZ,1kU,'11%jN HL4Ai,, PAkr +Nti PLACtS FUR AwkKEkS, ANU
AREAS FOR STORAGE OF bU,LDIN6 MATERALS, GRAVEL AND SOIL,
(2) oURK WITh THE UTIUTr L'vNTRACTURS TO STAKE OUT THE EAACT
LOCATION OF TkENCHES, AND (3) ERECT i4oYSICAL 8ARR,ERS AROUND ALL
"SAVED" TREES OR, BETTER rET, ARUvNO GROUPS OF TREES. NEAR
THE CONSTkVCTION ACFIVlb
BARRIERS THAT EXTEND BEYOND THE DRIPLINE PROTECT TREES DURING CONSTRUCTION.
TREE PRESERVATION DETAIL
(NO SCALE)
CONTROL SEEDING UMITS
EROSION CONTROL SEEDING LIMITS
GRADE AS SHOWN
ON PLANS
111 �= lilw
DRAINAGE SWALE SECTION
(NO SCALE)
There are no areas of soil stockpiles or borrow areas proposed for this site. GENERAL STAPLE RECOMMENDATIONS
NOTE: RECOMMENDED EROSION CONTROL MEASURES WERE TAKEN
FROM CHAPTER 3 AS STATED IN THE INDIANA HANDBOOK FOR
EROSION CONTROL IN DEVELOPING AREAS ADDITIONAL EROSION
CONTROL MEASURES MAY BE REQUIRED BY INSPECTOR AS
CONDITIONS WARRANT.
EROSION CONTROL NARRATIVE:
WESTCHASE SUBDIVISION CONSISTS OF 13 LOTS AS SHOWN ON THE ENCLOSED PLANS.
STREET & LOTS IN THIS SECTION WILL CONSIST OF CUT & FILL SITUATIONS.
PROPOSED LAKES WILL BE CUT PER HAMILTON CO. STANDARDS. PADS THAT REQUIRE
ADDITIONAL FILL WILL BE DETERMINED ON AN INDIVIDUAL LOT BASIS, TAKING
CONSIDERATION OF HOUSE FLOOR ELEVATIONS IN REGUARDS TO PROVIDING COVER
FOR 100 YEAR FLOOD PROTECTION GRADE.
TOPOGRAPHY AND VEGETATION WILL BE MAINTAINED AND UTILIZED WHERE POSSIBLE.
PROPOSED START DATE FOR CONSTRUCTION WILL BE EARLY SPRING 2000
WITH COMPLETION SCHEDULED FOR SUMMER 2000.
CONSTRUCTION ACCESS AS SHOWN SHALL BE ESTABLISHED AND STABILIZED WITH A
MINIMUM OF 8" OF #2 STONE TO MINIMIZE MUD ACCUMULATION ONTO 146TH STREET.
DUST ON THE PROJECT SITE SHALL BE KEPT TO A MINIMUM BY UTILIZING SPRINKLING,
CALCIUM CHLORIDE, VEGETATION 'COVER, SPRAY ON ADHESIVES OR OTHER APPROVED
METHODS.
HOUSE CONSTRUCTION WILL BEGIN UPON COMPLETION OF CONSTRUCTION OF
THE SUBDIVISION. AT THAT TIME EACH LOT OWNER WILL BE REQUIRED TO
MAINTAIN EROSION/ SILTATION CONTROL PRACTICES. A GRAVEL ENTRANCE TO THE LOT
SHALL BE REQUIRED TO MINIMIZE MUD ACCUMULATION ONTO SUBDIVISION STREETS.
THE FRONT OF THE LOT SHALL HAVE A SILT FENCE /STRAW BALES TO PROTECT THE
STREET FROM SEDIMENTATION. ANY CURB /BEEHIvE INLETS IN CLOSE PROXIMITY WHICH
ARE NOT PROTECTED SHALL BE PROVIDED WITH SILTATION FENCE /STRAW BALES TO
PROTECT ADJACENT LOTS THAT HAVE BEEN COMPLETED
CONTACT THE HAMILTON CO. SOIL & WATER CONSERVATION DISTRICT (317- 773 -1432)
IF YOU SHOULD HAVE QUESTIONS OR CONCERNS ABOUT THE RESPONSIBILITY TO CONTROL
OFFSITE SEDIMENTATION,
4
275
260
226
b 200
175
150
126
16
T6
50
26
e
EROSION CONTROL STATEMENT:
c
C
i
1. THE SCOPE OF THE WORK IS TO REESTABLISH VEGETATIVE COVER
r
BY SEEDING, EITHER PERMANENT \TEMPORARY, OR EROSION CONTROL
TYPES, AS SHOWN ON THE PLAN. AFTER FINISH GRADING, ALL
I
13
CONSTRUCTION AREAS ARE TO BE SEEDED.
2. PERMANENT AND TEMPORARY SEEDING SHALL BE IN ACCORDANCE
WITH THE DETAILS SPECIFICATIONS SHOWN.
3. EROSION CONTROL SEEDING: AN INTERIM SEEDING TO BE APPLIED
TO ALL DISTURBED AREAS AS SOON AS FINAL GRADING IS
ESTABLISHED. MIX AND APPLY AS SHOWN IN THE
SPECIFICATIONS. (IF THIS SEEDING IS APPLIED IMMEDIATELY
UPON FINISH GRADING, IT CAN SAVE SOME OF THE FURTHER
SEEDING AND LENGTHEN THE DURATION BETWEEN THE MAINTENANCE
OF THE SILTATION TRAPS AND BARRIERS,)
4. IF GRADING OCCURS DURING DECEMBER, JANUARY OR FEBRUARY,
DORMANT SEEDING PROCEDURES SHALL BE USED. IT IS
IMPERATIVE THAT ALL SEDIMENT FILTERS AND TRAPS ARE IN
PLACE PRIOR TO BULK EARTHMOVING OR CLEARING OPERATIONS
COMMENCE.
5. DURING DRY WEATHER, KEEP LAWNS WATERED WITH SPRINKLERS OR
OTHER APPROVED METHODS. RESEED ANY AREAS NOT GERMINATING
OR DAMAGED AT INTERVALS AS MAY BE REQUIRED ACCORDING TO
SEASONAL CONDITION AND /OR CONSTRUCTION ACTIVITY. WATER
GRASS AND EXECUTE NECESSARY WEEDING UNTIL FULL STAND OF
GRASS HAS BEEN OBTAINED.
6. IF DURING THE CONSTRUCTION PROCESS, THE CONTRACTOR IS ABLE
TO MAINTAIN A 25' MINIMUM WIDTH OF VEGETATIVE COVER AROUND
THE PERIMETER OF THE CONSTRUCTION ACTIVITY, THIS WILL
GREATLY REDUCE OR IN SOME CASES ELIMINATE THE NEED FOR
SOME SILTATION BARRIERS.
7. THE IMPLEMENTATION AND MAINTENANCE OF THIS EROSION CONTROL
PLAN IS THE SOLE RESPONSIBILITY OF THE CONTRACTOR AND /OR
OWNER.
~�
8. IT SHALL BE THE CONTRACTORS AND /OR OWNERS RESPONSIBILITY
TO MINIMIZE SEDIMENTATION (FROM ON -SITE CONSTRUCTION
ACTIVITY) FROM BEING DEPOSITED ONTO ADJACENT PROPERTIES
AND RECEIVING STREAMS /DITCHES IN STRICT COMPLIANCE WITH
"RULE 5" (327 IAC 15 -5, CONSTRUCTION ACTIVITY STORMWATER
RUNOFF CONTROL). IT SHALL ALSO BE THE CONTRACTORS OR
OWNERS RESPONSIBILITY TO OBTAIN ANY APPROVALS REQUIRED
FROM THE LOCAL AUTHORITY AND TO SUBMIT A COMPLETE NOTICE
OF INTENT LETTER TO THE OFFICE OF WATER MANAGEMENT,
INDIANA DEPARTMENT OF ENVIRONMENTAL MANAGEMENT PRIOR TO
ANY CONSTRUCTION ACTIVITY.
EROSION AND SEDIMENT CONTROL MEASURES
1. CONSTRUCTION ENTRANCE AND SEDIMENT TRAPS SHALL BE INSTALLED
0
PRIOR ON SITE. SEEDING
OTO N
APPLIED DISTURBED THAT WILL LAYODORM MORE THAN 4 WEEKS.
2. IF SEDIMENT IS TO RISE ABOVE ONE THIRD THE HEIGHT OF ANY
EROSION CONTROL STRUCTURE, THE STRUCTURE SHOULD BE CLEARED
OF ALL SEDIMENTATION.
3. EROSION CONTROL IS TO BE MAINTAINED THROUGH THE TOTAL
COMPLETION OF THE CONSTRUCTION PROCESS.
4. ALL INLETS AND EROSION CONTROL STRUCTURES ARE TO BE
CHECKED ONCE A WEEK AND AFTER EACH RAINFALL TO INSURE
PROPER PROTECTION FROM SEDIMENTATION.
5. ALL EXISTING STORM STRUCTURES THAT DRAIN UNDER COUNTY
ROADS OR TOWARD ADJACENT PROPERTIES SHALL BE PROTECTED AS
SHOWN ON THE EROSION CONTROL PLAN.
6. IF SOIL IS TO BE STOCKPILED, IT SHALL BE SURROUNDED WITH A SILT FENCE
TO PREVENT EROSION.
a
v
B 1 7
EROSION CONTROL:
A TEMPORARY SEEDING MIXTURE IN THE AREAS WHERE STRIPPING
OR FILL HAVE BEEN GRADED SHALL BE SEEDED FOR SILT EROSION
PROTECTION IMMEDIATELY AFTER GRADING. ALL CONSTRUCTION
AREAS ARE TO BE SEEDED AS FOLLOWS:
A. SWALE SEEDING: SEED AND FERTILIZE WITHIN CONSTRuCT1UN
LIMITS WITH 5# /ACRE "REDTOP GRASS ", 20# /ACRE '•RTE
GRASS ", 20,# /ACRE "BLUEGRASS ", 25# /ACRE "FESCUE" AND
600,E /ACRE 12 -12 -12 FERTILIZER.
B. CUT /FILL SEEDING (ALONG PAVED AREAS): SEED AND FERTILIZE
WITH 25# /ACRE "FESCUE ", 20# /ACRE "RYE GRASS ", ligi /ACRE
"BLUEGRASS" AND 60011 /ACRE 12 -12 -12 FERTILIZER
C. SEEDED AREAS SHALL HAVE A SUITABLE MULCH APPLIED FUR
EROSION AND SILT CONTROL MULCH MAY BE STRAW, SHREDUEU
HARDWOOD OR EROSION CONTROL MAT.
D. DEVELOPERS OPTION: CONSTRUCTION AREAS REQUIRING EROSION
CONTROL MAY BE HYDROSE,LDED IN ACCORDANCE WITH ABOVE SEED
AND FERTILIZER SPECIFICATIONS.
PLAN VIEW
STRAW BALES BURIED 3"
STORM BEEHIVE
3' -#4 REBAR STAKE
2'X6" SILT TRAP
TYPICAL SLOTTED RISER
(CAN BE USED INSTEAD
OF STRAW BALES)
TYPICAL SLOTTED RISER
(CAN BE USED INSTEAD
OF STRAW BALES)
STORM BEEHIVE
3 - #4 REBAR STAKE
.��STRAW BALES BURIED 3"
E,4_� \ 2'x6" SILT TRAP
I—
ICI , =���� ►� ���� -111
III ?, ,n cl I.ic�l' ���fill
�1� 311= -If •II.
•
(NO SCALE)
7. SILT TRAPS ARE TO PROTECT ALL EARTH DITCH INLETS, EXISTING WATER SHEDS
AND PREVENT SILTATION ON ADJACENT PROPERTIES. SILT TRAPS AND INLET PROTECTION
TO BE INSTALLED IMMEDIATELY AFTER INSTALLATION OF EACH INLET.
Sri
8. IF EROSION CONTROL IS DISTURBED, IT SHALL BE REPAIRED IMMEDIATELY AFTER
INTERUPTIVE SEQUENCE IS COMPLETE..
PERMANENT VEGETATIVE STABILIZATION
MULCH MAY BE APPLIED ANY TIME CONDITIONS ARE SUITABLE
FOR SPREADING ANCHORING REGARDLESS OF VEGETATIVE COVER. SOME
EXAMPLES OF SUITABLE MULCH INCLUDE:
1. AIR DRIED WHEAT, BARLEY, OAT, OR RYE STRAW, FREE FROM
NOXIOUS WEEDS AND OTHER FOREIGN MATTER. IT SHOULD BE
SPREAD UNIFORMLY SO 80% OF THE SURFACE IS COVERED FIVE OR
SIX STRAWS THICK (TWO BALES PER 1000 SO. FT. OR
APPROXIMATELY TWO TONS PER ACRE).
2. EXCELSIOR BLANKET, JUTE NETTING, PAPER FABRIC, OR A
SIMILAR SYSTEM APPLIED ACCORDING TO MANUFACTURERS'
SPECIFICATIONS.
3. WOOD CELLULOSE FIBER MIXED WITH WATER AND APPLIED WITH A
HYDRO- SEEDER TO FORM A DENSE MAT AFTER DRYING. IT IS BEST
SUITED TO SITES HAVING SLOPES LESS THAN 3% IN GRADE AND
LESS THAN 150 FEET IN LENGTH.
WOOD CELLULOSE FIBER SHOULD NOT CONTAIN GROWTH OR
GERMINATION INHIBITING FACTORS AND SHOULD BE DYED GREEN FOR
METERING. IT SHOULD BE APPLIED IN A UNIFORM MANNER AT A RATE
OF 1,200 POUNDS PER ACRE. MIXING AND APPLICATION SHOULD BE
PERFORMED IN ACCORDANCE WITH THE MANUFACTURER'S
SPECIFICATIONS.
STRAW MULCH SHOULD BE ANCHORED BY PRESSING STRAW INTO
THE SOIL A DEPTH OF TWO INCHES WITH THE USE OF A MULCH
ANCHORING TOOL, OR SECURING WITH TWINE OR HEAVY STRING AROUND
PEGS OR STAPLES.
ALL MULCH INSTALLATION TECHNIQUES ARE TO CONFORM WITH THE
URBAN DEVELOPMENT PLANNING GUIDE, FOURTH EDITIUN, JUNE 1990.
This site does not contain any wetlands according to the
National Wetlands Inventory map of Carmel, Indiano dated 1990.
U.S. Department of the Interior, Fish & Wildlife Service.
9
6
POST
4" DIA. w oD oR
1,33 LBS %FOOT STEEL
10' MAX. SPACING
I
WIRE FENCE
14 (SAGE (MIN -E" MESH`
SPACING (MAC) FASTENED
13Y I' WIRE AC 1'
-
I i I
I WIRES, R HOC k
TIE L u uv INVS (l
FILTER FABRIC AWN(;II
LENGTH (NO J0t1vTS)
STAPLE vR WIRE 10 FENC:E�i =
4 "x4" 1RLNCH 1U
BE BACK.FILLED
AND COMPACTED \�
1 DOWN -
UPSLUF E I SLOPE
_
1 - I-
C_
t i �
I
u;
F�
SILT FENCE SECTION
i NO SSCALE)
MAINTENANCE:
1. INSPECT WEEKLY AND AFTER EACH STORM EVENT:
2. IF FABRIC IS TORN OR DETERIORATED, REPLACE SECTION IMMEDIATELY.
3. REMOVE SEDIMENT WHEN HEIGHT REACHES 1/3 OF THE HEIGHT OF THE
FENCE OR IS CAUSING FABRIC TO BULGE.
4. TAKE CARE NOT TO UNDERMINE THE ENTRENCHED FABRIC.
5. AFTER DRAINAGE AREA IS STABILIZED, REMOVE FENCE AND SEDIMENT,
BRING DISTURBED AREA TO GRADE AND STABILIZE IT.
HATER G
RTCH
FEI
t
4 1 3
STABILIZATION
PRACTICE_ JAN. FEB. MAR. APR. MAY JUNE JULY AUG. SEPT. OCT. NOV. DEC.
PERMANENT A- `�� / / / /I / / %/*
�LELANG
uvRhtAld 7 8 ' -'�•"� B '-��
t Mi vtfAlt T � ; -.�D
St t;DINC
htuL F,�Iv:, •.
A = rENTUCKT BLUEGRASS 40 LBS /ACRE, CREEPING RED FESCUE 4U LBS /ACRE;
PLUS 2 TONS STRAW MULCH /ACRE, OR ADD ANNUAL R TEGRASS 20 LBS /ACRE
8 - rENTUCKY BLUEGRASS 60 LBS /ACRE; CREEPING RED FESCUE 60 LBS /ACRE,
PLUS 2 TUNS STRAW MULCH /ACRE, OR ADD ANNUAL RYEGRASS 30 LBS /ACRE
C = SPRING OATS 3 BUSHEL /ACRE
D = WHEAT OR RYE 2 BUSHEL /ACRE.
E = ANNUAL RYEGRASS 4U LBS /ACRE.
F = SOD
G - STRAW MULCH 2 TUNS /ACRE.
• /I /• IRRIGATION NEEDED DURING JUNE, JULY, AND /OR SEPTEMBER
•• IRRIGATION NEEDED FUR 2 TO 3 WEEKS AFTER APPLYING SOD
SEASONAL SOIL PROTECTION CHART
SIDE RIP -RAP
ENERGY DISIPATOR FOR STORM
WATER OUTLET INTO LAKE)
(NO SCALE)
TOTAL ACREAGE = 16.54 - DISTURBED ACREAGE 15,7 *Existing vegetation
in Block C and 97' Conservation Easement to remain undisturbed - See Sheet #9)
RECEIVING WATER WILL BE WILLIAMS CREEK.
le INE[
Ullii' -LINE i
Fail- I"uw: c NosT
• .� nit,ti YiNUil ill
NOTE; AYOIDING DAMAGE DURING CONSTRUCTION
THE SUREST WAY TO PROTECT TREES TmT ARE TO BE SAVED S Tu
(1) WORK WITH THE BUILDER TO LOCATE AND MARK WITH FLA(;0NG AND /OR
Swiv> ALL ONZ,1kU,'11%jN HL4Ai,, PAkr +Nti PLACtS FUR AwkKEkS, ANU
AREAS FOR STORAGE OF bU,LDIN6 MATERALS, GRAVEL AND SOIL,
(2) oURK WITh THE UTIUTr L'vNTRACTURS TO STAKE OUT THE EAACT
LOCATION OF TkENCHES, AND (3) ERECT i4oYSICAL 8ARR,ERS AROUND ALL
"SAVED" TREES OR, BETTER rET, ARUvNO GROUPS OF TREES. NEAR
THE CONSTkVCTION ACFIVlb
BARRIERS THAT EXTEND BEYOND THE DRIPLINE PROTECT TREES DURING CONSTRUCTION.
TREE PRESERVATION DETAIL
(NO SCALE)
CONTROL SEEDING UMITS
EROSION CONTROL SEEDING LIMITS
GRADE AS SHOWN
ON PLANS
111 �= lilw
DRAINAGE SWALE SECTION
(NO SCALE)
There are no areas of soil stockpiles or borrow areas proposed for this site. GENERAL STAPLE RECOMMENDATIONS
NOTE: RECOMMENDED EROSION CONTROL MEASURES WERE TAKEN
FROM CHAPTER 3 AS STATED IN THE INDIANA HANDBOOK FOR
EROSION CONTROL IN DEVELOPING AREAS ADDITIONAL EROSION
CONTROL MEASURES MAY BE REQUIRED BY INSPECTOR AS
CONDITIONS WARRANT.
EROSION CONTROL NARRATIVE:
WESTCHASE SUBDIVISION CONSISTS OF 13 LOTS AS SHOWN ON THE ENCLOSED PLANS.
STREET & LOTS IN THIS SECTION WILL CONSIST OF CUT & FILL SITUATIONS.
PROPOSED LAKES WILL BE CUT PER HAMILTON CO. STANDARDS. PADS THAT REQUIRE
ADDITIONAL FILL WILL BE DETERMINED ON AN INDIVIDUAL LOT BASIS, TAKING
CONSIDERATION OF HOUSE FLOOR ELEVATIONS IN REGUARDS TO PROVIDING COVER
FOR 100 YEAR FLOOD PROTECTION GRADE.
TOPOGRAPHY AND VEGETATION WILL BE MAINTAINED AND UTILIZED WHERE POSSIBLE.
PROPOSED START DATE FOR CONSTRUCTION WILL BE EARLY SPRING 2000
WITH COMPLETION SCHEDULED FOR SUMMER 2000.
CONSTRUCTION ACCESS AS SHOWN SHALL BE ESTABLISHED AND STABILIZED WITH A
MINIMUM OF 8" OF #2 STONE TO MINIMIZE MUD ACCUMULATION ONTO 146TH STREET.
DUST ON THE PROJECT SITE SHALL BE KEPT TO A MINIMUM BY UTILIZING SPRINKLING,
CALCIUM CHLORIDE, VEGETATION 'COVER, SPRAY ON ADHESIVES OR OTHER APPROVED
METHODS.
HOUSE CONSTRUCTION WILL BEGIN UPON COMPLETION OF CONSTRUCTION OF
THE SUBDIVISION. AT THAT TIME EACH LOT OWNER WILL BE REQUIRED TO
MAINTAIN EROSION/ SILTATION CONTROL PRACTICES. A GRAVEL ENTRANCE TO THE LOT
SHALL BE REQUIRED TO MINIMIZE MUD ACCUMULATION ONTO SUBDIVISION STREETS.
THE FRONT OF THE LOT SHALL HAVE A SILT FENCE /STRAW BALES TO PROTECT THE
STREET FROM SEDIMENTATION. ANY CURB /BEEHIvE INLETS IN CLOSE PROXIMITY WHICH
ARE NOT PROTECTED SHALL BE PROVIDED WITH SILTATION FENCE /STRAW BALES TO
PROTECT ADJACENT LOTS THAT HAVE BEEN COMPLETED
CONTACT THE HAMILTON CO. SOIL & WATER CONSERVATION DISTRICT (317- 773 -1432)
IF YOU SHOULD HAVE QUESTIONS OR CONCERNS ABOUT THE RESPONSIBILITY TO CONTROL
OFFSITE SEDIMENTATION,
4
275
260
226
b 200
175
150
126
16
T6
50
26
e
C
c
C
i
a
A
B
I
13
0'
r
A
R
4.
1 STAPLE PER SQ. YD.
4:1 3:1 2:1 1:1 CHANNU
SLOPE GRADIENT LINING
A
AUDMON" STAPLES AS REQUIRED
x
X $ x
♦' x
(NO SCALE)
2 1 1
SOILS LEGEND
The first capital letter is the initial one of the soil name.
The lower case that follows separates mapping units having
names that begin with the same letter, except that it does
not separate sloping or eroded phases. The second capital
letter indicates the class of slope. Symbols without a slope
letter are those with a slope range of O to 2 percent, or
they are for miscellaneous areas with considerable range of
slope. A final number, 2 or 3, in the syn-lboi indicates that
the soil is eroded or severely eroded, respectively.
Br Brookston -silty clay loam
CrA Crosby silt loam, 0 to 3 percent slopes
FnA Fox loam, 0 to 2 percent slopes
FnB2 Fox loam, 2 to 6 percent slopes, eroded
FxC3 Fox clay loam, 8 to 18 percent slopes, severely eroded
Ge Genesee silt loam
HeF Hennepin loam, 18 to 50 percent slopes
Ho Houghton muck
MmA Miami silt loam, 0 to 2 percent slopes
MmB2 Miami silt loam, 2 to 6 percent slopes, eroded
MmC2 Miami silt loam, 6 to 12 percent slopes, eroded
MmD2 Miami silt loam, 12 to 18 percent slopes, eroded
MoC3 Miami Clay loam, 6 to 12 percent slopes, severely eroded
MoD3 Miami clay loam, 12 to 18 percent slopes, severely
eroded
MxA Milton Variant silt loam, 0 to 2 percent slopes
NnA Nineveh loam, 0 to 2 percent slopes
OcA Ockley silt loam, 0 to 2 percent
OcB2 Ockley silt loam, 2 to 6 percent slopes, eroded
Or Orthents
Pa Palms muck
Pn Patton silty clay loam
Ps Patton silty clay loam, limestone substratum
Pt pits
Ra Randolph Variant silt loam
Ro Ross loam
Sh Shoals silt loam
St Sleeth loam
Sx Sloan silty clay loam, sandy substratum
We Westland silty clay loam, sandy substratum
Wh Whitaker loam
A A
C C/L SWALE
X STRAW BALES BURIED 3"
2 ST L E PER SQ. YD. t-
CHANNQI . LININGS UTaJZ8 STAPLE PATTERN 1 1/2 STAPLE PER SQ. YD.
"C" WITH ADDMONAL STAPLES ON SIDE SLOPES.
NOTSS: STAPLE PArrICRNS APPLY TO ALL NORTH AUMCAN GREEN EROSION CONTROL BLANKETS.
STAPLJI PATTERNS MAY VARY DEPENDING UPON SOIL TYPE AND AVERAGE ANNUAL RAINFALL.
AT SWP9 L9NGTHS GREATER THAN 3OU FM OR 1 kW" DRAWAGi OVER LARGE AREAS
13 DIRi>LTLtrD ONTO THE BLANKETS. STAPLE PArr2RN "C' SHOULD BE UTILIZED.
CEIANNI L LININGS REQUUtED A 2.0' MINIMUM OVERLAP AT LUNGITULANAL JOINTS.
SIDRSLOPZS SMALL REQUIRE A 6' MINIMUM OVERLAP. WIWM OVERLAP$ OCCUR.
THE UPSTRRW DLIINICI:"T SHALL OVERLAP THE DOWNSTRCA1l.
IF' OTHER TITAN NORTH AMERICAN GREEN EROSION CONTROL BLANKETS ARE INTALLED
FIQUoQW = INS'1'A1,IATION DLRECTIONS RECONiIfMJW BY THAT PRODUCTS COMPANY,
EROSION CON TROL BLANKET STAPLE: PAT TERN
(NO SCALE)
F7
I` -3' -#4 REBAR STAKE
STRAW BALE PL A CEMEN T
FOR EROSION CONTROL
(NO SCALE)
4 1 3
file: STRAW.DWG
2
SOILS MAP
f.
1 ■ vi
V
a
W
W
z
a
0
Z
W ;4
Wo
_ 8
�.. H
W x
OEM
�i
9
O L
o I1 0
°w V_ M
a� o
0 0 E o
31PI I" �o
m
v
u
V
•
A oW
O �
O �tqe
V
^I rw
1v
AO
w v
�W
SHEET NO.
C7