Loading...
HomeMy WebLinkAbout86.01 Specifications0 O cv v 0 rn c L a� 3 0 rn C M 3 0 i OD M cv z Gi z 0 5 No. 9800085 ?a STATE OF :J %O��` ' ZNDIANP• DATE: 11W, DRAWING' AND HIF IDLA`;, DE;I(,N•; AND CONCEPTS CONTAINED HEREIN ARE. THE EXCLUSI�E INTELLECTUAL PROPERTY OF THE SCHNEIDER CORPORATION, AND ARE NOT TO BE USED OR REPRODUCED, IN WHOLE OR IN PART, WITHOUT THE WRITTEN CONSENT OF THE SCHNEIDER CORPORATION. CC) COPYRIGHTED BY THE SCHNEIDER CORP. (2001) THE SCHNEIDER CORPORATION 12821 E. New Market Street Suite 100 Carmel, IN 46032 Telephone: 317.569.8112 Fax: 317.826.6410 www.schneidercorp.com Architecture Civil Engineering Environmental Engineering Geotechnical Services CIS * LIS Home Builder Services Interior Design Land Surveying Landscape Architecture Transportation Engineering PROJECT NO.: 6/29/01 1238.015 STORM SEWER SYSTEMS CHECKED BY: MG EARTHWORK SHEET TI1LE: SPECIFICATIONS C N: \1238 \015 \DWGS \C901.DWG SHEET NO.: (C 9 (an 8. Earth Work Balance 14 �j I The Contractor shall confirm all earthwork quantities W 11. All sanitary sewer lines upon completion will be required 1. SCOPE OF WORK STREETS H. Curing Concrete - Except as otherwise specified, 1. SCOPE OF WORK prior to start of construction. If an excess or to pass a low pressure air test. Said test shall be Z cure all concrete by one of the methods described shortage of earth is encountered the Contractor shall 9 � conducted according to ASTM 1417 -92, and shall be The work under this section includes all storm sewers, 0 in Section 501.17 of the Indiana Department of A. Extent: The work required under this section confirm with the Owner and Engineer the requirements 9 q W witnessed by an Engineer and a representative of the Clay 'The storm water inlets, and related items, including ~, Transportation Specifications, latest revision. consists of all excavating, fillip rough grading g' 9' 9 9 g for stockpiling, removal or importing of earth. � Waste District. testing shall be in accordance with excavating and backfilling, necessary to complete the 1. SCOPE OF WORK and related items necessary to complete the work Table 1. work shown on the drawings. I. Bituminous Pavement -Hot asphalt concrete indicated on the drawin s and described in the g Minor adjustments to the grades may be required to 12. Deflection tests shall be on all flexible* 2. MATERIALS The work required under this section includes all pavement shall be as specified in Section 402 P P specifications. The Contractor shall notify in the the Engineer earthwork balances when minor excess material or shortages are encountered. It is recognized b the g g y performed pipe after the final backfill has been in place at least 30 days. concrete and bituminous paving and related items P 9 and must comply with Section 401.05 of the Indiana Department of Transportation writing owners and of any changes, found the in parties hereto that the calculations of the Engineer p g No pipe shall exceed a vertical deflection of 5% deflection A. Storm Sewers necessary to complete the work indicated on drawings Y P 9 Specifications latest revisions. Paving will not errors, or omissions on plans or the field, before work is started or resumed. in determining earthwork quantities shall be ac- * test results. (The following are considered non - flexible and described in the specifications, including but not limited to: be permitted during unfavorable weather or when P 9 com lished in accordance with the American Society of P Y pipes: concrete pipe, ductile iron pipe, and cast iron pipe). P P P•P P P 1. Reinforced concrete sewer pipe shall confirm the temperature is 40 degrees F. and falling. Civil Engineers Standards for such calculations. The deflection test shall be performed with a nine -point to ASTM C -76 latest revision, with joints 1. In general, the items of work to be g Further, that these calculations are subject to the 1 mandrel. Proving rings shall be available. g g conforming to ASTM C -443 latest revision. When All streets, parking areas in contract limits Curbs and utters 9 J. Compacted Aggregate Subbase - the thickness shown performed under this section shall include: interpretations of soil borings as the physical limits P g P � storm pipe is submerged Sidewalks and concrete slabs, exterior steps on the drawings is the minimum thickness of the clearing and grubbing, removal of trees and of the various soil types, also the allowable variation 13. All mandrel testing shall be observed by a Professional B. Manholes full compacted subbase. Compaction shall be Y P P stumps (where required), protection of trees in finish grade and compaction permitted the contractor, Engineer for certification and a representative of the Clay 2. MATERIALS accomplished b rolling with a smooth wheeled P Y 9 to remain, stripping and storage of topsoil, PP 9 9 P and that all of these parameters may cause either an Waste District. 1. Precast reinforced concrete manhole sections roller weighing 8 to 10 tons. Compact to 90% fill compaction and rough grading of entire excess or shortage of actual earthwork materials to complete the project. If such an actual minor excess or 14. The ends of laterals are to be plugged tight with a and steps shall conform to ASTM C -478 latest P A. Concrete - Concrete shall be ready -mixed concrete compaction using Standard Testing Procedures. p 9 9 Along site. revision. and shall be a mix of proportioned fine and curbs, headers and walls and at all laced g P shortage of materials occurs, the contractor shall braced plastic disc or cap capable of withstanding a low coarse aggregates with Portland cement and water. not accessible to the roller, the aggregate 2. Excavated material that is suitable may be contact the engineer to determine if adjustment can be pressure air test without leakage. 2. Casting shall be of uniform quality, free 9 q y Minimum cement content shall be 6 bags per cubic material shall be tamped with mechanical tampers P P used for fills. All unsuitable material and made to correct the imbalance of earth. 15. Bedding for flexible pipe shall be No. 8 crushed stone from blow holes, porosity, hard spots, P Y• P yard of concrete and maximum water content shall or with approved hand tampers. pp p all surplus excavated material not required from 6- inches below the pipe to 12- inches above the pipe. shrinkage distortion or other defects. The 9 Y be 5.5 U.S. gallons per sack of cement, including shall be removed from the site. The Bedding for rigid pipe shall be No. 8 crushed stone from shall be smooth and well cleaned b shot Y moisture in the aggregate. Slump for normal location of dump and length of haul shall be the Contractor's responsibility. 6- inches below the pipe to the spring line of the pipe and -blasting or some other approved method. 9 Y PP weight concrete shall be a maximum of 4 inches 2 inches. the TYPICAL SANITARY SEWER SPECIFICATIONS from this point to 12- inches above shall be filled sand or The shall be coated with asphalt paint Y P P and a minimum of slump of machine placed concrete shall be no less than 1 -1/4 3. Provide and place any additional fill TO BE USED FOR PRIVATE SEWER DEVELOPMENT equivalent. Manholes shall be placed on no less than which shall result in a smooth coating, tough and tenacious when cold, not tack or 9 inches nor more than 3 inches. Standard test material from off the site as may be Y WITHIN 6- inches of No. 8 crushed stone bedding. Y brittle. They shall be gray iron meeting ASTM C -143 shall be used to measure slump. necessary to produce the grades required. CLAY TOWNSHIP REGIONAL WASTE DISTRICT 16. Water and sewer line crossings and separations shall be ASTM A -48 latest revision. Compressive strength of concrete at 28 days shall Fill obtained from off site shall be of kind in accordance with Ten States' Standards. be 4000 psi. All exterior concrete shall have and quality as specified for fills herein REVISED SEPTEMBER, 1999 3. Joints - Manhole sections shall be jointed air entrainment of 5% to 8% by volume per ASTM C and the source approved by the Owner. 1. Standard specifications of the Clay Waste District and P Y 17. Trench shall be opened sufficiently ahead of pipe laying with rubber type gaskets. The rubber type -260. Retempering of delivered concrete will not be allowed. Concrete shall be composed of: 4. The Contractor shall accept the site as he Indiana Department of Highways shall apply for all work and to reveal obstruction, and shall be property protected gaskets shalt meet ASTM C -443 latest revision. When P finds it and shall remove all trash, rubbish materials. Pipe shall be installed in accordance with Section and/or barricaded when left unattended. manhole and storm pipe are continuously in water. 1. Portland cement - Conforming to ASTM C -150, and debris from the site prior to starting 715. Type IA or Type IIIA. excavation. 18. No water shall be permitted to flow into the sanitary C. SUBDRAINS 2. Sanitary sewer pipe shall be PVC in accordance with sewer system during construction. Contractor shall utilize a 2. Aggregates: Conforming to ASTM C -33 B. Work not included: The following tems of 9 ASTM D -3034 S.D.R. 34 and ASTM 2321. PVC pipe shall ( ) P P pump to keep the water level below the pipe. Pump 1. Perforated plastic pipe subdrains shall related work are specified and included in other P have grooved bell and gasket. The pipe shall be made of 9 9 P P discharge shall be directed to a storm outlet. Any pipe conform to ASTM F -405. 3. Water - Shall be clear and free from sections of these specifications: PVC plastic having a cell classification of 12454B. entering existing sewers shall be plugged with screw type injurious amounts of oils, acids, alkalies, mechanical, braced plug until such time as all tests on the 3. APPLICATION organic materials or other deleterious 1. Excavation, grading and backfilling for 3. PVC sewer fittings shall conform to the requirements of sewers have been completed and the lines have passed all substances. utility lines ASTM D- 3034 -89 specification. Fittings in sizes through 8" punch lists. A. Permits and Codes - The intent of this section of shall be molded in one piece with blastomeric joints and 19. All the specifications is that the contractor's bid on B. Welded Steel Wire Fabric - Where required for 2. Storm drainage systems minimum socket depths as specified in sections 6.2 and P P sewer laterals installed the mainline Contractor the work covered herein shall be based upon the concrete reinforcement shall conform to ASTM A185. 7.3.2. Fittings 10" and larger shall be molded or fabricated shall be bedded the same as the main line sewer. h drawings and specifications but that the work 3. Sanitary sewer systems in accordance with section 7.11 with manufacturers standard 20. Forty -eight (48) hours notice shall be given to the shall comply with all applicable codes and C. Premoulded Joint Filler - Shall be of non pipe bells and gaskets. Wall thickness of fittings shall be Clay Regional Waste District prior to the start of sewer regulations as amended by any waivers. Contractor -extruding type meeting ASTM D -544 except that 9 YP 9 P 4. Streets and paving SDR 26 as defined in section 7.4.1 of specifications. P construction. Also, 48 hours notice shall be given prior to shall furnish all bonds necessary to get permits remoulded joint filler used in concrete walk P 1 Gaskets for blastomeric joints shall be molded with a an testing done in the sewer. Y g for cuts and connections to existing sewers. construction may be either non - extruding or 5. Water supply system minimum cross - sectional area of 0.20 square inches and resilient. conform to ASTM F -477 specification. Fittings shall be 21. Manhole castings shall be stamped "SANITARY SEWER" B. Local Standards - the term "Local Standards" as 2. BENCH MARKS manufactured by Harco or equal. (Neenah Casting R 1642 or equal) and be self - sealing type. used herein means the standards of design and D. Bituminous Pavement Materials - All materials Waterproof castings shall be Neenah R- 1916 -Fi and stamped construction of the respective municipal proposed for the construction of bituminous Maintain carefully all bench marks, monuments and other 4. All sanitary manholes shall be "precast concrete" "SANITARY SEWER ". department or utility company. pavements shall comply with the Indiana Department reference points; if disturbed or destroyed, contractor manholes in accordance with ASTM C -478 and Section 720. of Transportation specifications, per latest shall contact engineer. 0 -rings shall conform to C -443. Kent Seal or equivalent 22. The minimum slope for sewer acceptance by the Clay C. Existing Improvements - Maintain in operating revision. 3. REMOVAL OF TREES shall also be applied to all joints and between riser rings Township Regional Waste District are: condition all active utilities, sewers and other and castings. Manhole step spacing shall be no ore than Size of Pipe Minimum Constructed Slope drains encountered in the sewer installation. E. Compacted Aggregate Subbase: Shall be crushed A. 16- inches. Manholes shall be air tested for leakage in Repair to the satisfaction of the owner any damage stone or gravel. Crushed gravel shall be a Remove all trees and stumps from area to be accordance with ASTM C1244 -93, Standard Test Method for 8 -inch 0.40% to existing active improvements. minimum of 35% crushed material. Chert shall be occupied by road and surfaced areas. Removal of Concrete Sewer Manholes by the Negative Air Pressure 10 -inch 0.28% limited to a maximum of 8% of the total. Material trees outside these areas shall only be done as (Vacuum) Test. 12 -inch 0.22% D. Workmanship - To conform to all local, state and shall be free from an excess of flat, elongated, noted on drawings or approved by the Owner. 15 -inch 0.15% national codes and to be approved by all local and thinly laminated, soft or disintegrated pieces; B. All brush, stumps, wood and other refuse from the A Installation and operation of vacuum equipment and 18 -inch 0.12% state agencies having jurisdiction. and shall be free from fragments coated with dirt. trees shall be buried onsite or removed to disposal areas indicating devices must be in accordance with manufacturer's recommendations and performance 23. The Contractor shall provide measurements of the slope E. Trenching - Lay all pipe in open trenches, except Compacted aggregate shall be graded as follows: off of the site. Disposal b burning hall not P y g permitted unless proper permits are obtained specifications which have been provided by the manufacturer of the sewer for each manhole section as construction when the local authority gives written permission SIEVE SIZE %PASSING (where a Ilcable The location of on site bur (w PP ) Y and accepted by the Engineer. progresses. Such measurements shall be certified by a Registered Land for tunneling. Open the trench sufficient ahead 1 -112" 100 its shall be designated b the owner or the 9 y 2. With the vacuum tester set in place: Surveyor or Engineer and be available g Y g of i ela in to reveal an obstructions. The P P Y 9 Y „ 1 Engineer. 1. Inflate the compression band to forty (40) psi to effect a on -site for observation by the District's Inspector. No more width of the trench shall be the inside pipe 80 -100 g seal between the vacuum base and the structure. than three manhole sections can be constructed in advance diameter plus 24 inches for 12 inches above the 3/4" 70 -90 1/2" 55 4. PROTECTION OF TREES 2. Connect the vacuum pump to the outlet part with the of such measurements. pipe. Sheet and brace trench as necessary to -80 #4 35 -60 valve open. protect workmen and adjacent structures. All A. General Protection: The Contractor shall be 3. Draw a vacuum of ten (10) nches of H And close the ) g' 24. In the event the Contractor does not meet the minimum trenching to comply with Occupational Safety and #8 25 -50 #30 12 -30 responsible for the protection of tops, trunks valve. slopes, the sewer section and any other affected sewer Health Administration Standards. Keep trenches # 200 5 -10 and roots of existing trees on the project site 3. Accepted standards for leakage will be established from sections shall be reconstructed to meet such minimum free from water while construction is in progress. that are to remain. Existing rees subject to 9 1 the elapsed time for a negative pressure change from ten P g P g slopes. Under no circumstances lay pipe or appurtenances in standing water. Conduct the discharge from 3. APPLICATION construction damage shall be boxed, fenced or (10) inches to nine (9) inches of mercury. The maximum trench dewatering to drains or natural drainage otherwise protected before any work is started; allowable leakage rate for a four (4) foot diameter manhole channels. A. Grading - Do any necessary grading in addition to do not stockpile within branch spread. Remove must be in accordance with the following: that performed in accordance with Earthwork interfering branches without injury to trunks and Minimum Elapsed Time for a F. Special Supports - Whenever in the opinion of the Section, to bring subgrades, after final cover scars with tree paint. Manhole Depth Pressure Change of 1 Inch Hg Engineer the soil at or below the pipe grade is compaction, to the required grades and section unsuitable for supporting sewers and appurtenances for site improvement. 5. HANDLING OF TOPSOIL 10 feet or less 60 seconds specified in this section, such special support, >10 feet but <15 feet 75 seconds in addition to those shown or specified, shall be B. Preparation of Subgrade - Remove spongy and A. Remove all organic material from the areas to be >15 feet but <25 feet 90 seconds provided as the Engineer may direct, and the otherwise unsuitable material and replace with occupied by buildings, roads, walks and parking contract will be adjusted. stable material. No traffic will be allowed on areas. Pile and store topsoil at a location For manholes five (5) feet in diameter, add on additional prepared subgrade prior to paving. where it will not interfere with construction fifteen (15) seconds and for manholes six (6) feet in operations. Topsoil shall be reasonably free P P Y diameter, add an additional thirty (30) seconds to the time G. Backfilling - for a depth of at least 12 inches C. Compaction of Subgrade - The first 6 inches below from subsoil, debris, weeds, grass, stones, ect. requirements for four (4) foot diameter manholes. For all above the top of the pipe, backfill with earth or granular material free from large stones, rock the subgrade shall be compacted to at least 100% B. After completion of site grading and subsurface manholes deeper than twenty-five 25 feet. Engineer will P Y- • ( ) 9 fragments, g roots or sod. Tamp this backfill of the maximum dry density as determined by the provisions of AASHO T -99. Water shall be utility nstallation, to soil shall be replaced y P P determine the applicable minimum elapsed time. thoroughly, taking care not to disturb the pipe. prevented from standing on the compacted subgrade. in areas designated on the erosion control plan 4. If the manhole fails the test, necessary repairs must be Y P For the remaining trench depth, backfill with for seeding and /or sodding. Any remaining top made and the vacuum test and repairs mut be repeated earth or granular material containing stones or D. Utility Structures - Check for correct elevation soil shall be used for finished grading around g 9 until the manhole passes the test. rocks not larger than 4 inches. Backfill under of all manhole covers, valve boxes and similar structures and landscaping areas. 5. If manhole joint sealants are pulled out during the and within 5' of walks, parking areas, driveways structures located within areas to be paved, and vacuum test, the manhole must be disassembled and the and street shall be granular material only - make, or have made, any necessary adjustments in joint sealants replaced. thoroughly compacted by approved methods. such structures. 6. DISPOSITION OF UTILITIES: 6. Manholes will be subject to visual inspection with all visual leaks being repaired. H. Manhole Inverts - Construct manhole flow channels E. Placing Concrete A. Rules and regulations governing the respective of concrete sewer pipe or brick, smoothly finished utilities shall be observed in executing all work and of semi - circular section conforming to the 1. Subgrade - Place concrete only on a moist, under this section. 5. Butyl rubber coating shall be applied around each inside diameter of the connecting sewers. Make compacted subgrade or base free from loose manhole joint from 6- inches above to 6- inches below each changes in size or grade gradually and changes in material. Place no concrete on a muddy or B. If active utilities are encountered but not shown joint. The appropriate primer shall be applied prior to direction by true curves. Provide such channels frozen subgrade. on the drawings, the Engineer shall be advised applying the rubber coating. Inside joints to be filled with for all connecting sewers at each manhole. before work is continued. precoat plug material. 2. Forms - All forms shall be free from warp, C. Inactive and abandoned utilities encountered in 6. The manhole chimp including chimney's all riser rings shall be I. Subdrains - All subdrains shall be of the size t shown on the pions and shall be constructed to the tight enough to prevent leakage and excavating and grading operations shall be sealed using Infi - Shield "Uniband" or approved equal. Prior grades shown. All drains constructed off -site as substantial enough to maintain their shape and position without springing or settling, reported to the Engineer. They shall be removed, to placement, the top 4- inches of the manhole cone and part of the outlet drain will be located as shown. when concrete is placed. Forms shall be plugged or capped as directed by the Utility casting frame shall be cleaned and primed. The Uniband clean and smooth immediately before Company and the Engineer. shall extend from 3- inches below the top of the cone J. Utilities - It shall be the responsibility of each concreting. section to 2- inches over the flange of the manhole casting contractor to verify all existing utilities and D. It shall be the responsibility of each contractor frame. conditions pertaining to his phase of the work. to verify all existing utilties and conditions It shall also be the contractors responsibility to 3. Placing Concrete - Concrete shall be pertaining to his phase of the work. It shall P 9 P 7. The casting elevations are set b Ian. However, the 9 Y P contact the owners of the various utilities before deposited so as to require as little also be the contractors responsibility to contact castings are to be adjusted in the field by the Engineer's work is started. The contractor shall notify in rehandling as practicable. When concrete is the owners of the various utilities before work representative, should a discrepancy occur between plan writing the owners or the engineer of any changes, to be placed at an atmospheric temperature of is started. grade and existing grade. New manhole ring and cover shall errors or omissions found on these plans or in the 35 degrees F. or less, paragraph 702.10 of be installed to establish grade. Maximum height of field before work is started or resumed. the Indiana Department of Transportation 7. SITE GRADING: adjusting rings shall be 12- inches. Specifications latest revision shall be K. Contractor to rout joints inside storm g followed. A. Grades: Contractor shall perform all cutting, 8. Backfill around all structures and all cuts under paved structures where pipes enter or exit filling, compacting of fills and rough grading areas with granular material. Trenches opening within and between structure and casting. F. Concrete Curb required to bring entire project area to grade as 5 -feet of paved roadways shall be backfilled with granular TABLE 1 shown on the drawings. material in accordance with Section 211. Backfill under 1. Expansion Joints - Shall be 1/2 inch thick sidewalks shall be granular, unless the walks are constructed TIME IN MINUTES AND SECONDS REQUIRED FOR FOR PRESSURE DROP FROM 3.5 PSIG TO 2.5 PSIG premoulded between storm structures &curb. B. Rough Grading: the tolerance for paved areas a minimum of 6 months after backfill has been in place. (Based on 0.003 cfm per sq. ft. and 2.0 cfm) shall not exceed 0.04 feet plus or minus above Pipe Diameter D in Inches 2. Contraction /Control Joints - Unless otherwise the established subgrade. All other areas shall 9. The Contractor shall be responsible for verifying that all 4 6 8 10 12 15 18 21 24 27 30 33 36 39 provided, contraction joints shall be sawed not exceed 0.10 feet plus or minus the state highways, city, and county permits have been obtained or scored joints spaced 10 feet on center, except for established grade. All banks and other breaks in by the developer prior to start of construction. 25 :04 :10 :18 :28 :40 1:02 1:29 2:01 2:58 3:20 4:08 4:59 5:56 6:58 25 intersection radii where joints shall be placed 5' o.c. grade shall be rounded at top and bottom. 10. The Contractor shall be required to furnish the 50 :09 :20 :35 :55 1:19 2:04 2:58 4:03 5:17 6:41 8:15 9:59 11:53 13:57 50 3. Finish - Tamp and screed concrete as soon as C. Compaction Requirements: developer's Engineer with a set of prints, marked in red 75 :13 :30 :53 1:23 1:59 3:06 4:27 6:04 7:55 10:01 12:23 14:58 17:00 18:25 75 placed, and fill any honey combed places. 1. All building pad areas shall be compacted to pencil, showing actual sewer location and invert, to include "as 100 :18 :40 1:11 1:50 2:38 4:08 5:56 8:05 10:39 12:45 14:11 15:35 100 Finish square corners to 1/4" radius and lateral location, depth and length. Such built" prints other corners to radii shown. standards specified by local and /or state must be received by the Engineer before the final contract 125 :22 :50 1:28 2:18 3:18 5:09 7:26 9:55 11:20 125 building codes. payment can be authorized. The sanitary sewer laterals and 150 :26 :59 1:46 2:45 3:58 6:11 8:30 150 G. Concrete Walks and Exterior Steps stubs termination shall be indicated on the surface with a 2. For compaction requirements of paved areas, metal fence post set immediately above the said termination 175 :31 1:09 2:03 3:13 4:37 7:05 175 1. Slopes - Provide 1/4 inch per foot cross see street specifications. point. 200 :35 1:19 2:21 3:40 5:17 200 slope. Make adjustments in slopes at walk 225 :40 1:29 2:38 4:08 5:40 225 intersections as necessary to provide proper drainage. 250 :44 1:39 2:56 4:35 250 275 :48 1:49 3:14 4:43 275 2. Dimensions - Walks and steps shall be one 300 :53 1:59 3:31 300 course construction and of widths and details shown on the drawings. 350 1:02 2:19 3:47 350 400 1:10 2:38 400 3. Finish - Screed concrete and trowel with a steel trowel to a hard dense surface after 450 1:19 2:50 450 surface water has disappeared. Apply medium 500 1:28 500 broom finish and scribe control joints at 5 550 1:37 550 foot spacing. Provide 1/2" expansion joints where sidewalks intersect, and at a maximum 600 1:46 600 spacing of 48 feet between expansion joints. 650 1:53 2:50 3:47 4:43 5:40 7:05 8:30 9:55 11:20 12:45 14:11 15:35 17:00 18:25 650 Gi z 0 5 No. 9800085 ?a STATE OF :J %O��` ' ZNDIANP• DATE: 11W, DRAWING' AND HIF IDLA`;, DE;I(,N•; AND CONCEPTS CONTAINED HEREIN ARE. THE EXCLUSI�E INTELLECTUAL PROPERTY OF THE SCHNEIDER CORPORATION, AND ARE NOT TO BE USED OR REPRODUCED, IN WHOLE OR IN PART, WITHOUT THE WRITTEN CONSENT OF THE SCHNEIDER CORPORATION. CC) COPYRIGHTED BY THE SCHNEIDER CORP. (2001) THE SCHNEIDER CORPORATION 12821 E. New Market Street Suite 100 Carmel, IN 46032 Telephone: 317.569.8112 Fax: 317.826.6410 www.schneidercorp.com Architecture Civil Engineering Environmental Engineering Geotechnical Services CIS * LIS Home Builder Services Interior Design Land Surveying Landscape Architecture Transportation Engineering DATE: PROJECT NO.: 6/29/01 1238.015 DRAWN BY: CHECKED BY: MG SHEET TI1LE: SPECIFICATIONS C N: \1238 \015 \DWGS \C901.DWG SHEET NO.: (C 9 (an r-� 14 �j I W O Z co o z 0 W 0" ~, Q Q� � E-+ c� F --I- -I DATE: PROJECT NO.: 6/29/01 1238.015 DRAWN BY: CHECKED BY: MG SHEET TI1LE: SPECIFICATIONS DRAWING FILES: N: \1238 \015 \DWGS \C901.DWG SHEET NO.: (C 9 (an