CITY -0 CARMEL
.jAmEs BRAINARD, MAYOR
EXHIBIT B
Disbursement Direction# 2
E-Mail or Fax the signed Disbursement Direction to:
The Huntington.National Bank Corporate Trust Department (INHP22)
Attn: Kim Wilson
Tel: (317) 229-4094
Fax: (317) 229-4094
E-Mail: Kim.Wilson @huntinRton.com
Re: Depositary Agreement between the City of Carmel and the Huntington National Bank,
-Construction Account#4087000986
Dear Kim:
On May 7, 2014, you are hereby authorized and directed as the Depositary under the above-referenced
Agreement, to pay the amounts set forth on the attached Register of Claims from the above-referenced
Trust account and overnight checks to:
Carmel Engineering Department
Attn: Kate Lustig
1 Civic Square
Carmel, TN 46032
City of Cannel, Indiana ///���
r
&LI?
By:
Name: Diana L. Cordray Title: Clerk-Treasurer
* Your Alternate contact at Huntington National Bank will be:
Ellen Campbell
Tel: (616) 235-5941
E-mail: Ellen.Campbell(a�huntington.com
DFPARTNI NI or h.wciNFF:RING
ONE CIVIC SQLAIF, C:IKMLF, IN 46032 OFFici: 317.571.2441 FAN 31.7.571.2439
E iA]L en ineerin}��cann�Lin.,guv
Illinois Street Bond
Construction Account#4087000986
Disbursement Request#02
May 7, 2014
PAYEE AMOUNT DUE CHARACTER OF EXPENDITURE
ALL CHECKS LISTED HEREON
TO BE MAILED TO KATE LUSTIG
CITY OF CARMEL;ENGINEERING
ONE CIVIC SQUARE;CARMEL,IN 46032
• 317-571-2432;KATE LUSTIG
Unless Otherwise Stated
EBB Paving, Inc. $105,176.08 Project 10-10;Illinois Street Extension
17042 Middletown Avenue Invoice#2;PO#25297
Noblesville,IN 46060 Construction
TOTAL $105,176.08
CONSTRUCTION PROJECT INVOICE
DATE: May 7, 2014
COMPANY NAME: E&B Paving, Inc
AND ADDRESS ]7042 Middletown Avenue
Noblesville, Indiana 46060
TELEPHONE NO.: (317)-773-4132
FAX NO.: (317)-773-4137
PROJECT NAME: Illinois Street Extension — City of Carmel Project #10-10.
PROJECT NO.: 10-10
INVOICE NO.: 2
Construction pay items as per Progress Pay Estimates No. 2 as shown on the
attached invoice for work completed between the dates of April 1, 2014 to April 30,
2014
TOTAL PAY THIS ESTIMATE: $116,862.31
MINUS 10% RETAINAGE: (-) $11,686.23
TOTAL NOW DUE: $105,176.08
Submitted by CrossRoad Engineers, PC
Project Rep%q4.
tive - signed name Date
Lance Stahley
Project Representative - printed name
1 of 6
CITY OF CARMEL
CARMEL-ILLINOIS STREET EXTENSION
1 PROJECT NO.10-10
PROGRESS PAY ESTIMATE NO. 02
For work done during the period of: 411114 through 4/30/14
Ito' "4 e' Descnptton y%; a E�+ ,E %X9O nhty thus . Totei Q anntlty, A )1 , „�:Total Pay ,2 l.T1atal4Pay.
pi r k•R?° R r, - : ,:, : 1 4 4 yeEsttmate�°�1 , cto Dater r q 4Puce1 ,,this Estimate E' rtoDate
Ta �1"�Y Asa 6 0 9v V.� 1: # e T Y '1 ":€`� > i¢'t'I d g ,t '"� 1.i.i ° "',a La a1
1 CONSTRUCTION ENGINEERING 0.15 IS 0.30 LS $75,000.00 $11,250.00 $22,500:00
2 MOBILIZATION AND DEMOBILIZATION LS 1.00 LS $273,570.00 $273,570.00
3 CLEARING RIGi-1TOF WAY LS 0,50 LS . $75,000.00 $37,500.00
4 'PAVEMENTREMOVAI. SYS SYS $1.0:00
5 PAVED SIDE DITCH,REMOVE LET LET $8.00
6 CURB,CONCRETE;REMOVE LET LET $5.00
7 CURB AND GUTTER,REMOVE LET LET $4.50
8 INLET,REMOVE EA EA $41.5.00
9 GUARDRAIL END TREATMENT,REMOVE EA_ EA $250.00
10 MAILBOX ASSEIMBLT,REMOVE EA NA 5300.00
11 LIGHT STANDARD AND FOUNDATION,REMOVE _ EA EA $300.00
12 PIPE.REMOVE LFT LET $18 SO
13 EXCAVATION,COMMON CYS CYS 57.15
14 BORROW CYS CYS 51.00
TEMPORARY EROSION&'SEDIMENT CON'T'ROL,
1:5 CURB INLET PROTECTION EA EA $85.00
16 TEMPORARY CHECK DAM,REVETMENTRIPRAP 'FUN TON 526.50
17 TEMPORARY DITCH INLET PROTECTION EA EA $85.00
18 TEMPORARY MULCHING TON TON $700.00_
19 TEMPORARY SEDIMENT TRAP 42.88 TON 42.88 TON $26.50 $1,136.32 $1,136.32
20 TEMPORARY SILTFENCE LET LFT $1.25 1
21 NO 2 STONE 113.82 TON 113,82 TON $1.7.25 $1;963.40 51,063.40
22 SUIIGI/ADE TREATMENT,TYPE IA SYS SYS $6.25
23 SUBGRADE TREATMENT,TYPE 111A SYS SYS $6.10
24 STORMWATER QUALITY STRUCTURE;1,0 CFS EA EA $19,100.00
25 STORMWATER.QUALITYSTRUC'I'URE,1.6.CFS EA EA $25,150.00
26 STORMWATER QUALITY STRUCTURE,3.0 CFS 'EA EA $39,250.00
27 STRUCTURALBACKFILL,TYPE 1 106.80 CYS 417.24 CYS $21.15 $2,258.82 . $8,824.63
28 STRUCTURAL.BACKEILL,TYPE 2 CYS CYS V $27.15
29 'CHEMICAL MODIFICATION,SOILS SYS _ SYS $5.45
30 COMPACTED AGGREGATE,NO.53,BASE TON TON ' $20.00
31 COARSE AGGREGATE,NO 8 TON TON $40.00 _
32 COMPACTED AGGREGATE,NO.53, TON TON $30.00
33 MILLING,ASPHALL';11/2 IN SYS SYS $12.50
IMPA ""i "`grid ><
35 HMA,INTERMEDIATE,TYPE C,00,19,0 MM TON TON $49,00
35 HMA SURFACE,TYPE A TON TON $86.00
37 HMA SURFACE,TYPE C TON TON $78.00
30 DMA INTERMEDIA'T'E,TYPE A 'ION TON $59,00
39 LIMA INTERMEDIATE,TYPE C TON TON $53.00
40 FIMA BASE,TYPE C TON TON $52.00
41 HMA FOR APPROACHES,TYPE B TON TON $75.00
42 ASPHALT FOR TACK COAT TON TON 51.00
43 CONCRETE PAVEMENT,TRUCK APRON,7" SYS SYS 147.52 _
44 GUARDRAIL,REMOVE LET f LIT $5.00
45 GUARDRAIL,END TREATMENT,OS _ CA 13,000.00
46 GUARDRAIL,W-BEAM,6 FT 3 IN SPACING I.FT LET $30.00
47 CURB,CONCRETE,STRAIGHT LET LET $14.00
48 CURB RAMP,CONCRETE,C SYS SYS 5117.00
49 C.URI3 RAMP,CONCRETE,L SYS SYS $106.00
50 HANDRAIL,PEDESTRIAN LET LET $145.00
51 CURB AND GUrrER,TYPE II LET LET $12.00
52 CURE AND GUTTER,TYPE II! LET LET $02.00
53 CURB,MODIFIED,ROLL LFT LET $1.6.00
54 PCCP FOR APPROACHES.9 IN. S S $45.00
55 MAILBOX ASSEMBLY,SINGLE EA EA $200.00
56 GEOTEXTILES 420.67 SYS 420.67 SYS $1,12 $471.15 $47115
57 RIPRAP,REVETMENT TON TON $21.00
SE SCREENING WALL LS LS $142,150.00
59 MOBILIZATION AND DEMOBILIZATION FOR
SEEDING RA EA $200.00
60 EROSION CONTROL BLANKET SY.S. SYS $1.17
61 SEED MIXTURE,T. LB LRS_ $1.35
62 MULCHING MATERIAL TON TON $400.00
63 WATER Kgal Kga! $1.00
64 -TOPSOIL. CYS CYS $1.00
2 61
CITY OF CARMEL
CARMEL-ILLINOIS STREET EXTENSION
PROJECT NO.10-10
PROGRESS PAY ESTIMATE NO. 02
For work done during the period of: 4/1/14 through 4/30/14
1 a a .,i s"� E u * ' R 'g"`€i .g g, a E,5,:74W 4,, ,: , ,. 3 9"'' z ,tr
Item 5 ,pescriptionn0 ,. �4 Quantity this Total Quantity 4,:114 Unit `Totai Pa,190 r Total Pay,
sl!io t r;Nt fie) 4I Eatin?ate '; Ito CUdte' i Puce this Estlm t2. to Date"
r 0E .tz _k :�.4 4. ' ,ass _4 . :,Y .f .._ ( t, -. ff,^: ita -m. 9�f�aSek �, .a�r''�x��:n?���^� ..76` "'�-� � . a�"���"��_�a#
65 SODDING,NURSERY SYS SYS $3.10'
66 IRRIGATION,CONDUIT,PVC,4 IN. LET LET 511.40
67 FIELD OFFICE,C 1.00 MOS 2.00 lIDS 51,500,00 $1,500.00 53,000.00
STRUCTURE,REINFORCED CONCRETE BOX
GR SECTIONS,9 FT X 3 FT 150.00 LFT 150.00 LET $497.35 $74,002.50 $74,602.50
69 PIPE,REINFORCED CONCRETE,CIRCULAR,12 IN LFT LET 5:33.25
70 PIPE,REINFORCED CONCRETE,CIRCULAR,15 IN LET LET $36.00
71 PEPE,REINFORCED CONCRETE,CIRCULAR,15 IN LET LET 539.00_
72 PIPE,REINFORCED CONCRETE,CIRCULAR,24 IN LFT L-"1' $51.00
73 PIPE,REINFORCED CONCRETE,CIRCULAR,30 IN LET I,FT $76.00
74^PIPE.„REINFORCED CONCRETE,CIRCULAR,36 IN LET LET 507.00
75 PIPE,REINFORCED CONCRETE,CIRCULAR,541N I,FI' Lvr $138.00
76 PIPE,REINFORCED CONCRETE,CIRCULAR,60 IN LI"r LET 5191.00
77 VIDEO INSPECTION FOR FIFE LET LFT $1.20
78 PiPE,TYPE 4CIRCULAR6IN LET LFT 55.211
79 AGGREGATE FOR IINDERDRAINS CYS CYS 532.00
80 VIDEO INSPECTION FOR IINDERDRAINS LFT LFT 50.95
81 GEOTEXTILES FOR UNDERORAIN SYS SYS $1.00
82 INLET,CAP EA EA $460.00
83 INLET,E.,7 EA EA $1,275.00 _
84 INLET,F7 EA EA $1,300.00
85 INLET,J10 EA EA , 51;600.00
86 INLET,M10 PA EA $1,600.00
57 CATCH BASIN,E7 EA EA 51,500.00
88 CATCH BASIN,K10 LA EA 51,700.00
89 PIPE CATCH BASIN,18 IN EA EA $1,300.00
90 MANHOLE,C4 EA EA 51,800.00
91 MANHOLE,L4 EA EA $5,900.00
92 MANHOLE,J4 EA EA $2,000.00
93 CATCH BASIN,M10 EA EA $1,900.00
94 STRUCTURE„REINFORCED CONCRETE.THREE-
SIDED SECTIONS,24111NX 72IN _ LET LFT $2,029.50 _
95 SANITARY STRUCTURES,ADJUST'10 GRADE EA EA $920.00
96 PUMP:AROUND 1.00 EA 1,00 EA 512,000,00 $12,000.00 $12,000.00
97 ROAD CLOSURE SIGN ASSEMBLY EA 4.00 EA $270,00 $1,080.00
98 DETOUR ROUTE MARKER ASSEMBLY 18,00 EA 18,00 EA $100.00 $1,800.00 $1,800.00
99 CONSTRUCTION SIGN,A 7.00 EA 11,00 EA $200.00 $1,400.00 .$2,200.00
100 MAINTAINING TRAFFIC 0.15 LS 0.30 LS $23,866.61 $3,579.99 $7,159.98
101 BARRICADE,1118 LET 24.00 LET $10.00 $240.00
102 DECORATIVE STREET SIGN ASSEMBLY EA EA $1,425.00
SIGN POST,SQUARE,TYPE 1,REINFORCED
103 ANCHOR BASE LET LET 511.00
104 SIGN,SHEET,WITH LEGEND 0.080"THICKNESS , SET $14.00
105 SIGN,SHEET,WITH LEGEND 0.100"THICKNESS ' SET SF'1' $15,00
106 DECORATIVE STREET LIGHTING,WIRING AND
INSTALLATION . EA EA $8,875.00 _
107 CABLE IN'I'ERDUCT LFT LFT $9.50 _
108 LIGHTING POWER DISTRIBUTION PANEL EA EA $5,200.00
109 HANDHOLE,LIGHTING EA EA 5600.00
110 CONDUIT,STE:NL GALVANIZED,2IN LFT LFT 110.50
111 WIRE,NO 6 COPPER IN PLASTIC DUCT,IN
CONDUIT41/C LEE LET 57,25
WIRE,NO 6 COPPER IN PLASTIC DUCT,I N
112 TRENCH;4 VC LET . LET $7,25
113 H ANDHOLE EA EA . 5850.00
114 TRANSVERSE MARKING,THERMOPLASTIC,
"SHARICSTEETH" LET LET $5.00
775 LINE,'I'HERMOPL.AS'FIC,BROKEN,WHITE,12 IN,3
FT STRIPE-3 FT GAP , LFT LET- $2.00
•
3 of 6
CITY OF CARMEL
CARMEL-ILLINOIS STREET EXTENSION
PROJECT NO. 10-10
PROGRESS PAY ESTIMATE NO. 02
For work clone during the period of: 4/1/14 through 4!30114
: a, + 5Z e : z `_ ,, r, s , ,3 rik g€ 3 3�„i '� i. '� ` `,€3 aye, eb cxx€" 5 nai,,• a
Item r. r 4-�; r Description C - (r ,.,E Quantity this Total QuentttyO i UTt .q i :Total Pay Total Pay
iNo' t f� :T a Esth sate ,-ilo Date: 0 ' Pnoa�l thls�Estlrnate to Date€
'rF�,t�; �, a.. fi ,....-.v�-4 Yei 4-� dN A�ta.3 k.6-,�- _ x 3�-a^a,.$; , 4t: SH Ila �p�a��Q a.,�,_"ti. ,. ,w��+6���r A
LINE,THERMOPLASTIC,BROKEN,WHITE,6 IN,3
116 FT STRIPE-3 FT GAP LFT LET $1.00
PAVEMENT MESSAGE MARKING,
117 THERMOPLASTIC,FISHHOOK LANE INDICATION
ARROW EA EA $80.00
118 TRANSVERSE MARKING THERMOPLASTIC J
CROSSWALK,SVII1TE 24' LET LFT $6.00
119 L€NE.THERMOPLASTIC,BROKEN,mom,4IN _LET LET $0.60
320 LINE,THERMOPLASTIC,SOLID,WHITE,4IN. LET LET $0.50
121 LINE,THERMOPLASTIC,SOLID,YELLOW,4 IN LET LFT $0.60
22 PAVEMENT MESSAGE MARKING,
THERMOPLASTIC,LANE INDICATION ARROW EA EA $50.00
123 SNOWPLOWAI3LE RAISED PAVEMENT MARKER EA EA $200.00
124_GENERAL CONDITIONS LS LS $5.000.60
12$ IMPORTED FILL CYS CYS $6.65
126 GRADING CYS CYS $6.50
127 ASPHALT SURFACE COURSE TON TON $87.63
128 ASPHALT INTERMEDIATE COURSE TON TON $69.60
129 1353 CRUSHED LIMESTONE TON TON $20.00
130 36"RCP STORMWATER PIPE LET 256.00 LET $80.00 $20,480.00
131 CONCRETE END SECTION EA 6.00 EA $1,410.00 4 $8,460.00
132 6 FOOT PRECAST WALL SYSTEM LET _ LET $143.00
133 8FOOT PRECAST WALL SYSTEM LFT LET $197.43
134 SEGMENTAL BLOCK WALL FE FE $35.00
135 IRRIGATION SYSTEM I..S LS $97,500.00
136 OVERSIZED COBBLE STONE CYS ' CYS $10000
137 LARGE MERAMEC STONE CYS CYS $90.00
138 STONE BARK CYS CYS $130.00
139 RIP RAP 80.33 CYS 80.33 CYS $61.00 $4,900.13 $4;900.13
140 MESH,PRAIRIE MIX AC AC $3,820.00
141 LOW STATURE PRAIRE MIX AG AC $3,155.00
142 YARROW SEED AC AC $1,960.00
143 CREEPING.RED FESCUE SET SKr $0.10
144 TURF SEED SFr SET $0.10
145 GINKGO(MALE) EA EA $400.00
146-SWAMP WFIITE OAK EA EA $360.00
147 RED OAK EA EA $330.00
148 DOWNYSERVICERERRY EA EA $160.00
149 KOUSA DOGWOOD EA EA $190.00
150 EASTERN ftEDBUD EA EA $165.00
151.KWANYAN CHERRY EA EA $165.00
_152 WHITE PINE EA EA 5185,00
153 BLACKCHOKEBERRY EA EA $45.00
154 KARL FOERSTER REED GRASS EA EA $23.00
155 ARTIC FIRE DOGWOOD EA _ EA $37.00
156 GREY OWL IUNIPER EA . EA $37.00
157 HAMELIN DWARF FOUNTAIN GRASS EA EA $15.00
158 NINEBARK EA CA $40.00 _
159 DAPPLED WILLOW EA EA $10.00
160 DWARF DELPHINIUM EA EA $4.20^_
161 KIM'S KNEE.HIGH CONEFLOWER EA EA $14.00
162 IOLYENE NICHOLE DAYLILY EA EA 31160-
163 EVERGREEN CANLIYTI.IFT EA NA $4.20 _
164 BLACK EYED SUSAN EA EA $14.00
16$ TEMPORARY SILT FENCE LET LET $1.25
160 EROSION CONTROL BLANKET 511' SET $0.20
167 INLET PROTECTION EA EA $150.00
168 PEDESTRIAN STOP SIGN EA 4 EA $200.00
169 18 IN THERMOPLASTIC STOP BAR LFT LFT $6.00
170 WEED BARRIER FABRIC SET SET $0.18
171 D011I3LE SHREDDED HARDWOOD MULCH CYS CYS $60.00
172 STEEL EDGING LFT LET $5.25 4.
173 AUSTRIAN PINES(PINES NIGRA) EA EA 4 $230.00
1 TOTAL 44 $116,862.31 $481,888.10
I
4of6
CITY OF CARMEL
CARMEL-ILLINOIS STREET EXTENSION
PROJECT NO. 10-10
PROGRESS PAY ESTIMATE NO. 02
For work done during the period of: 4/1114 through 4/30114
'Y7R4:' 'r..W 2 , six s @ € ,7i y t 5: t K s"v}„�'c", , «. * r4Y �Yx IIII. ,I,, ' s
It�enl 174 " paOIIPho) e } ±'�°+ Quantity t 41. 7e Tntal Qu nti '" I Unrt Total Pa f y
'�0 €'a k z s � M. e ,�%",- �,�+, 9 gexY 4 x s � �m y x�TOlei pd �
'r. 4 tr it
No �+ ;� � � ��,, ,a"� s,T , 1Estimate 1�" to[jatep�.� Pne � a thislrstima3e to-0afe
Awl s'41>�-.- N „€ �: 'sec "s a '', 'S RP &; �e S " z}a ,5 A �f x '-� �"4 ?r.'p e ' wa
�.. 9�tt m.?�_� .. _ , � � ' s. zc��' n �ro� s. ��..�,b �, x�"�Ys.�a ws .,._ � �.;�.iA ._�� t a�:: `,v.,#�
ALTERNATE BID A
Al CONSTRUCTION ENGINEERING LS LS $10,000.00
A2 MOBILIZATION AND DEMOBILIZATION LS LS $44,400.00
A3 CLEARING RIGHT OF WAY LS LS $7,(1(14.00
A4 CURB,CONCRETE,REMOVE •LFT LET $5.00
AS CURB AND GUTTER,REMOVE. LFT LET $4.50
A6 INLET,REMOVE TEA_ EA $415.00
A7 LIGHT STANDARD AND FOUNDATION,REMOVE EA EA_ $300.00
A7A LEGHT STANDARD,REMOVE EA EA $300.00
A8 PIPE,ABANDON AND GROUT FILL LET I.FT $11.00
A9 EXCAVATION,COMMON CYS _ CYS $23.00
TEMPORARY EROSION E SEDIMENT CONTROL,
All CURB INLET PROTECTION TEA EA $85.00
All TEMPORARY SILT FENCE LOT LFT $1.25
Al2 NO 2 STONE TON TON $17.25 _
A13 SURGRADE TREATMENT,TYPE 1 SYS SYS $6.24
A14 SUBGRADE TREATMENT,TYPE IIIA SYS SYS $12.00
A1S STRUCTURAL BACKEILL,TYPE 1 CYS CYS $23.15
Alb CHEMICAL MODIFICATION,SOILS SYS SYS $5.45
Al) COMPACTED AGGREGATE,NO.13,BASE TON TON $20.00
7118 COARSE AGGREGATE,NO 8 TON TON $40.00
Al9 MILLING,ASPHALT,1 1/2 IN SYS SYS $0.90
A20 PROFILOGRAPH.IIMA LS LS $1.00 _
421 DMA,INTERMEDIATE.,TYPE C,OG,19.0 MM TON TON $52.00
A22 HMA SURFACE,TYPE A TON TON $106.00
All HMA SURFACE,TYPE C TON TON $65.00
A24 11MA INTERMEDIATE,TYPE A TON TON $60.00
A25 HMA INTERMEDIATE,TYPE C TON TON $52,00
A'26 BMA BASE,TYPE C TON TON $49.00
A27 ASPHALT FOR TACK COAT ._TON TON $1.00
A28 C11RB RAMP,CONCRETE.TYPE C SYS SYS $113.00
A29 CURB:RAMP,CONCRETE,TYPE K SYS SYS $130.00
A30.CURB AND GUTTER,TYPE II LET LET $1.2.00
A31 CURB AND CUTTER,TYPE Ill I LOT LET $12.00
A32 PCCP FOR APPROACHES,9 IN. SYS SYS $52.00
MOBILIZATION AND DEMOBILIZATION FOR
A33 SEEDING EA EA 5200.00
A34 SEEDMIXTURE,T 1.8S LBS $1.35
A35 MULCHING MATERIAL TON TON $400.00
A30 WA'T'ER Kga1 K 0 $1.00
A37 TOPSOIL CYS CYS $1.00
A36 SODDING,NURSERY SYS SYS $3,11
A39 PIPE,REINFORCED CONCRETE,CIRCULAR 12 IN LET ' LET $33.21
A40 PIPE,REINFORCED CONCRETE,CIRCULAR 18 IN LET LET $45.00
A41 PIPE,REINFORCED CONCRETE,CIRCULAR 21 IF1 LFT 1,1 r $76.00
A42 PIPE,REINFORCED CONCRETE,CIRCULAR 24 IN LET LET $60.00
A43 VIDEO INSPECTIO FOR PIPE LET 1.FT $2.00
A44 PIPE.TYPE 4 CIRCULAR 6IN LET LFT $5.20
A4S AGGREGATE FOR UNDERDRAI NS CYS CYS _ $32.00
A46 GEOTEXTILES.FOR 1JNDERDRA]N SYS SYS $0.95
A47 CASTING,ADJUST TO GRADE EA EA $665.00
A48 INLET,CAP FA i _EA $460.00
A49 INLET,I10 EA EA ' 51,600.00
A50 INLET MID EA EA $1,000.00
A51 MANHOLE,04 EA EA $1,800.00
A52 MANHOLE,J10 EA EA 53,300.00
A53 ROAD CLOSURE SIGN ASSEMBLY EA EA $270.00
A54 DETOUR ROUTE MARKER ASSEMBI.Y EA EA $65.00
ASS CONSTRUCTION SIGN,A F.A EA $100.00
A56 MAINTAINING TRAFFIC LS LS $6,064.97
AS7 BARRICADE,EI1-B LFT T $10.00
A58 SIGNPOST,SQUARE„TYPE 1,REINFORCED
ANCHOR BASE LFT LET $11.00
A59 SIGN.SHEET,WITH LEGEND 0.080 IN THICKNESS SF SF $14.00
I
5of6
CITY OF CARMEL
CARMEL-ILLINOIS STREET EXTENSION
PROJECT NO. 10-10
PROGRESS PAY ESTIMATE NO. 02
For work done during the period of: 4/1/14 through 4/30114
rS 7 an t at " ,' r -
os Mte i ? ' 1 1 NCr !01s , rt T s"'�I nUty hs Z x g Toaf Cuariyz V ',]-3,..-LJn t 4 -�E,Tal ?a0� Tot a
l Pa
?Nu "0 4 � Estimte �to Dte" a #xPIce �EthiEtrnae o Da
flik 0
a��,� _ I ;NS i Ra-ti : . , . it4; ::,:.*',,To Aili f .i 0 t
- .._ Ufa'I `. 42v3
AGO SIGN,SHEET,WITH LEGEND 0.100 IN THICKNESS SE SP $15.00
DECORATIVE STREET LIGHTING,WIRING AND
A61 INSTALLATION EA L _ EA 58,300.00
BL
A62 CAEIN'IER.UCT LET LOT $9.50
A63 HANOI-101.E,LIGHTING EA EA $600.00
A64 CONDUIT,STEEL;GALVANIZED,2:IN LFT LET $10,50
A65 WIRE,NO 6 COPPER IN PLASTIC DUCT.fN
TRENCH,4 1/3 LET LET $7.25
A66 HANDHOLE EA EA 3850.00
A67 WIRE;NO 6 COPPER IN PLASTIC DUCT,IN
CONDUIT 41/3 LOT_ LET $7.25
A60 TRANSVERSE MARKING THERMOPLASTIC
CROSSWALK,WHITE 24" LFT L. LFT $10.00
AGO LINE,ThERMOPLASTIC,NROKICN,WHITE,4K LET LOT $1.00
A70 LINE,THERMOPLASTIC,SOLID,WHITE,4 IN. LID' LET $1.00
A71 LING THERMOPLASTIC,SOLID,YELLOW.4€N LET LFT _ $100
TRANSVERSE MARKING THERMOPLASTIC STOP
A.2 LINE,24" LET LOT $10.00
A73
PAVEMENT MESSAGIPAVEMENT MESSAGE MARKING,
THERMOPLASTIC,LANE/INDICATION ARROW EA EA $50.00
A74 PAVEMENT MESSAGE MARKING, --
THERMOPLASTIC,WORD,"ONLY" EA EA 5100.00
A75 SNOWPLOWABLE RAISED PAVEMENT MARKER EA EA $200.00
A76 SIGNAL SUPPORT FOUNDATION,36 IN X 144 IN EA EA $2,100.00
A77 SIGNAL STRAIN POLE,STEEL.,30 FT EA EA $4,500.00
A78 HANDHULE,SIGNAL EA EA $875.00
A70 CONDUIT.STEEL,GALVANIZED,2 IN,
UNDERGROUND LOT LIT $10.50
A80 SIGNAL CABLE,1C/14 GA LFT LET $0.15
CONTROLLER AND CABINET,MASTER,MENU
A81 DRIVEN,8 PHASE EA EA $8,655.00
A8l TRAFFIC SIGNAL HEAD,3-FACE,12 IN RED,
AMBER,GREEN EA EA $620.00
TRAFFIC SIGNAL HEAD,5.FACE,12 IN RED,
A83 AMBER,GREEN,AMBERARROW,GREENARROW EA EA $925.00
A84 SPAN,CATENARY,AND TETHER P..A EA 51,700,00
A85 DISCONNECT HANGER EA EA $275.00
A86 SIGNAL CABLE,5C/14 GA LET LET $1.50_
A87 SIGNAL.CABLE.7C/14GA LOT LET $1.65
AB8 SIGNAL CABLE,3C/8 GA LIT LET $2.50
A89 SIGNAL CABLE;2C/16 GA,SHIELDED LFT LET $0.75
A90 SIGNAL DETECTOR HOUSING EA EA $850.00_
A91 SAW CUT FOR ROADWAY LOOP AND SEALANT L LOT LFT $6.00
A92 CONTROLLER CABINET FOUNDATION,31 EA EA $1,025.00
A93 SIGNAL SERVICE EA EA $800.00
A94 LOOP DETECTOR DELAY AMPLIFIER,2 CHANNEL EA EA $25000
MISCELLANEOUS EQUIPMENT FOIL TRAFFIC
A95 SIGNALS I.S 15 $500.00
TOTAL ALTERNATE BID A "'
TOTAL BASE,ALTERNATE A AND ANY ADDITIONAL ITEMS I $116,862.31 I $481,888.10 I
TOTALS AND PAY ESTIMATE CALCULATIONS
TOTAL PAY THIS ESTIMATE $116,862.31
TOTAL PAY TO DATE I $481,888.10
1.
6of6
CITY OF CARMEL
CARMEL-ILLINOIS STREET EXTENSION
PROJECT NO.10-10
PROGRESS PAY ESTIMATE NO. 02
For work done during the period of: 411114 through 4130/14
lea ��Descnphon Quantifythis Total QuantityUnit Ta1a1 Pay Tofa1 Pay
c a r a� Estimate o to Date z � Pnce� 1 this Estimate to.Date
^^® ,W a �8 mt "
w' _�". .��. +�a-s w a�.h�3��s w�R ���4�Y9,�a �,k"��._,.rs.Zou.azM°kh:e 4
DEDUCT 10% RETAINAGE $48,188.81
DEDUCT PREVIOUS NET PAY ESTIMATES $328,523.22
L
NET PAY ESTIMATE NO, 02 $105,176.08
CrossRoad Engineers, PC C77//
Inspoang Firm y Date f!
E&B Paving, Inc �`Lam— t� 6 /9
Contractor ,/ 8y Date