Loading...
HomeMy WebLinkAbout06010081-Sq. Ft. k. All s dewa ks and driveways I. Sewer and water lines, septic system, (tanks & filed system) and/or well locations m. Drainage flow arrows n. All drainage swales and subsurface facilities (retention / detention areas, etc...) o, Sump pump -- Show sump pump pit(s) and discharge line locations p. Geothermal heat pump discharge locations *NOTE: If land is not within a platted subdivision, a legal description is required, CARMEL ZONING ORDINANCE Z-289, SECTION 29.04.02 (3): "The Director shall approve or deny the Improvement Location Permit within five (5) working days of the receipt of the written application form and accompanying mateda s. The Improvement Location Permit shall ~ issued when the proposed structure improvement, or use and its location conform in ell respects to this ordinance. IN ADDITION TO THE ABOVE-LISTED SUBMI1-FAL REQUIREMENTS, THE BUILDING INSPECTOR WILL BE PROVIDED WITH ANY INFORMATION RELATIVE TO COMMITMENTS MADE IN THE ZONING PROCESS FOR THE PROPERTY INVOLVED. THIS WOULD INCLUDEANY PLAN COMMISION, BOARD OF ZONING APPEALS, AND/OR DEPT. OF COMMUNITY SERVICES ADMINISTRATIVE APPROVALS REQUIRED. ADDITIONAL INFORMATION MAY BE REQUESTED BY, AND WILL BE PROVIDED TO THE BUILDING INSPECTOR, IF THE SUBMITTED PLANS ARE NOT OF SUFFICIENT CLARITY OR DETAIL, TO INDICATE THE NATURE AND EXTENT OFTHE WORK PROPOSED AND TO DETERMINE COMPLIANCE WITH ALL APPLICABLE CODES AND ORDINANCES. SUBMITTAL OF ADDITIONALLY REQUESTED/REQUIRED INFORMATION, AFTER THE INITIAL SUBMII-FAL, WILL EXTEND THE TIME IT TAKES COMPLETE THE PERMIT REVIEW. THE OFFICE OF BUILDING & CODE ENFORCEMENT RECOGNIZES ANY ROOM/AREA DESIGNATED ON CONSTRUCTION PLANSASA"BONUS ROOM"TO BE UN :~-C ~PIABLE UN NI HE _SPACE. IFAN AREA SO LABELED IS TO BE A FINISHED SPACE, CONSTRUCTION PLANS MUST BE LABELED ACCORDINGLY. IF IT IS DETERMINED THAT AN UNFINISHED, "BONUS ROOM" AREA IS TO BECOME A FINISHED AREA AFTER THE IS$ ..i CE F THE P RMIT. THE PLANS AND PERMIT RECORDS MUST BE UPDATED AT THE OFFICE OF BUILDING & CODE ENFORCEMENT, ALL CONSTRUCT/ON ZS SUB3ECT TO FZELD tNSPECT~ON, AND SHOULD NOT BEGZN PRIOR TO THE ZSSUANCE OF THE BUILDZNG PERM.. ONCE THE PERMIT IS ISSUED, WORK SHOULD NOT BE POURED, INSULATED/COVERED, AND/OR OCCUPIED pR]oR TO THE APPROPRIATE INSPECT]ON. Beginning prior to obtaining a building permit and/or proceeding with construction beyond the stage of a required inspection without approval consUtutes Late Fee penalties, per Z-289 of the Carmel/Clay Zoning Ordinance; 29.06.07, and 29,06.08. £ODE ENFORCEMENT; CITY OF CARMEL. One Civic S~.; Carmel, IN 46032. Ph. ¢317) 571-244z.. building I certify that the joining of water will result , on the i with the I further and fluxes. Failure to comply Under the penalties of Pedury (Indiana the information ! have provided in the table below is belief, and that I have not knowingly or intentionally i tO hide, obscure, or otherwise mislead the Dept. of Community Services regarding the truth of the matters addressed therein. Unfinished) Sunroom Ft, of Garages TOTAL 2of2