Loading...
HomeMy WebLinkAbout81-01 C104 Erosion Control DetailsSeedbed Preparation Apply lime to rake the pH to the level needed for spaces be seeded. Apply 23 pounds or 12 -12 -12 analysts fertiliser (ar equivaend /l)nper 1000 14 it. (approxlmotely 1000 pounds per acre) or fertilise occur q to test. Application or 150 IbIlL of ammonium nitrate on areas low in arganlc matter and fertility will groolly enhance vogetolivo growth. Work the fertilizer and Ilms Into the sot to a depth of 2 -3 indbs with o harrow. disk or rake operated across the slope as much as possible. Seeding Select a seed mixture based an projected use of the area (Figure 5-2). while acnsidering best seeding dotes Set Figure 5-3 this sheet. If taer- ances are a problem. such eat taeronce err seedIngs adjacent to streets and highways, see Figure 5-4 this sheet before final selection. Mach Rote Mulch is to be applied at 2.000 to 3.000 pounds per acre In areas not covered by erosion contra blonksting. Mulch must be onchared using a mulch anchorinpq tool or farm disk with dull. serroted, straight set blades, a bulldozer cleats drHen up and down slope. Figure 5-2: Permanent Seed Mixtures %won SesdIng Rote Suttoblo pH Site Sull"IYO bs /acre Ibs/1000 well s4 ft. Droughty Drained Mkt Level and Sloping, Open Areas 1. Toe Fescue 35 .8 5.5 -8.3 2 1 2 2. TON Fescue 25 6 5.5 -8.3 1 Red Clover•• 5 .12 3, Kentucky ass 15 4 5.5 -7.5 2 1 Creeping Redesow 15 _4 - Stem Batiks and Cuts 4. Toll Feeaue 15 .4 5.8 -7.5 2 1 2 Kentucky Bluegrass 25 .6 5. Tae Fescue 35 8 5.5 -8.3 2 1 Emerald Crownvotch•• 10 .25 Loess and High Maintenance Areas 6. Kentucky f 40 9 5.8 -7.5 2 1 Creeping Red ssoue 40 .6 7. Perennial Ryegrass 170 4.0 5.0 -7.5 1 (Turf Twee) 8. Toil Fescue 170 4.0 - 5.5 -8.3 2 1 2 - • 1 - Prefsrred 2 -MAN Tawate •• Inoculote with specific Inoculant. 0 o_ N ch m N -n CJN Qf 7 lrf m eD OG Temporary Seeding Dotes Jan I Feb I Mar I Apr I May I Jun Jul Ihug ISSP Ioct ov ec Wheat or Rye oats Annual Ryegroes Non- Irrlgoted• Irrigated Dormant soodir,g« ■Irrigollon needed during this period. To control erosion of times other than in the shaded areas. *MAINTENANCE use mach. • Late summer seeding dotes may be extended 5 days RIOR 0 CLEARING AND GRADING PRIOR TO CLEARING AND GRADING if mulch Is applled •• Increone seeding application by 501 TREE CTION FIGURE 5 -3 _- Temporary Seedi ngs - Kind of Seed 1000 S4 Ft. Acre Remarks Wheat or Rye &5 Ibs 2 bar Carver BOW 11 to AFTER FINISH GRADING 1 1/2- deep - Spring oats 2.3 lbs. 3 bu. Cover need /' deep Annual ryegrone 1 b. 40 bar Cover seed 1 /4'desp• • Not. necessary where mulch Is appikd Ranking: 1 Good 2 Medium - Not tolerant Sat Tawance (to both sell sots b spray} T Tolerance MT Medium Tolerance S Slight Tolerance FIGURE 5 -4 e 0 e• •o e•e o'e •O•o o.e•o. •e,o•e,e• PUBLIC ROAD ` oOo•.oe•oo..oe° e°6o' ,.ee°••° 6o• .ee • o •e 50' (MIN) .s•o••e•o•e•o•e•e •e e•O•e•O•e•O.O.O•o•O•e•e•O e•o.e•o.e•o.e'o.e•o.e•o.o•O•o • °,e.o,O• °,e•o.o•a..0.e•e.e•o.e e•e•O:e•o•e•O o•o•e•o•e•o•e•o•o•e•o 0.00D.0 •O•e•O•o•O e•O•o•e• •O•o•O•o•o•o •e•O• • •o•e•o•o'e e'e•e' •6'0••'0••'0.0 •o• ....••.... • .e�O.e•O• :OLD 0.0"0.0 O•e •. •.• • •O.O.e•O•e•O•e•e•6•e•6 .. ••:• '6.0'0••'0•• °0.0 °0•• °0.6 ,. • �;• •o.e•o o.0 ..6•a.e•e•• •• •�, •o •;. • :• ° • :X• 0o '•�oO 0 e ,•. 6o• e• 0• .00 O . • e . O e o • o • • • e O o 0 - 0 Oeo. sO•o•O e•6.0•6e.e•0••e• ' °•ee•e•e•o 6 • (MIN) o e • - • e e i o •:.. = °. e. 2e -3° COARSE 12, (MIN) AGGREGATE GEOTEXTILE FABRIC TO STABILIZE FOUNDATION (ESPECIALLY IMPORTANT WHERE WETNESS IS ANTICIPATED) TEMPORARY CONSTRUCTION ENTRANCE DETAIL 2 stakes (typ) per bale staked -- straw bale compacted soil to prevent piping Plan (n.t.s.) Profile (n. t. s. ) fl.. °w straw bale bindings for straw bales to be placed parallel to ground BEEHIVE INLET STRAW BALE PROTECTION EROSION CONTROL SCHEDULE EROSION CONTROL MEASURE *MAINTENANCE INSTALLATION SEQUENCE ST ENTRANCE AS N N RIOR 0 CLEARING AND GRADING PRIOR TO CLEARING AND GRADING SILT FENCE EXISTING INLET PROTE K ANEEKLY, AFTER STORM EVENTS AND AS NEEDED IOR TO CLEARING AND GRADING TREE CTION WEEKLY AFTER STORM EVENTS AND AS NEEDED SOIL CONDITION TEMPORARY - ^ G GRADING ROUG H GRADIN PERMANLNT SEEDING WATER AS NEE AFTER FINISH GRADING Sol i Tolerance STRAW WEEKLY, AFTER ST EVENTS AN AS NEEDED INLET PROTECTION SEED. SOD & LANDSCAPE AROUND WEEKLY AFTER STORM EVENTS AND AS NEEDED AS NEEDM AFTER FINISHED GRADI G PLACED AROUN - FINISHED U I UNITS FINISHED BALES -WATER NA AFTER ALL AREAS DRAINING TO THESE AREAS ARE STABILIZED REMOVAL- OF R T PROTECTION- E­4 AFTER ALL AS DRAINING T SE ARE ARE STABILIZE REMOVAL OF SILT FENCE - N A Sprayl C) Wet ar DrS Dry W 5A Can. Soil Creeping Red Fesw+e 2 a 1 1 Mod. 1 120-25 12 -18 7 -21 S Festuca rubra Kentucky Bluegrass 2 1 1 Med 1 25-35 12 -18 10 -20 MT Poo protinsk Tab Fescue 2 1 1 Low 1 24 -35 24 -36 5 -14 T Festuco L arundinoceo Ji2 Perennial ryegross 2 1 2 Mod 2 15 -20 12 -18 5 -10 MT Lalium perenne High Crownvetch - - - Low 1 5-10 24 14 -21 T Coronwa v ane Red Clover - - - Mod 1 7 -10 16 5-10 S S Trifolk,m protons Ranking: 1 Good 2 Medium - Not tolerant Sat Tawance (to both sell sots b spray} T Tolerance MT Medium Tolerance S Slight Tolerance FIGURE 5 -4 e 0 e• •o e•e o'e •O•o o.e•o. •e,o•e,e• PUBLIC ROAD ` oOo•.oe•oo..oe° e°6o' ,.ee°••° 6o• .ee • o •e 50' (MIN) .s•o••e•o•e•o•e•e •e e•O•e•O•e•O.O.O•o•O•e•e•O e•o.e•o.e•o.e'o.e•o.e•o.o•O•o • °,e.o,O• °,e•o.o•a..0.e•e.e•o.e e•e•O:e•o•e•O o•o•e•o•e•o•e•o•o•e•o 0.00D.0 •O•e•O•o•O e•O•o•e• •O•o•O•o•o•o •e•O• • •o•e•o•o'e e'e•e' •6'0••'0••'0.0 •o• ....••.... • .e�O.e•O• :OLD 0.0"0.0 O•e •. •.• • •O.O.e•O•e•O•e•e•6•e•6 .. ••:• '6.0'0••'0•• °0.0 °0•• °0.6 ,. • �;• •o.e•o o.0 ..6•a.e•e•• •• •�, •o •;. • :• ° • :X• 0o '•�oO 0 e ,•. 6o• e• 0• .00 O . • e . O e o • o • • • e O o 0 - 0 Oeo. sO•o•O e•6.0•6e.e•0••e• ' °•ee•e•e•o 6 • (MIN) o e • - • e e i o •:.. = °. e. 2e -3° COARSE 12, (MIN) AGGREGATE GEOTEXTILE FABRIC TO STABILIZE FOUNDATION (ESPECIALLY IMPORTANT WHERE WETNESS IS ANTICIPATED) TEMPORARY CONSTRUCTION ENTRANCE DETAIL 2 stakes (typ) per bale staked -- straw bale compacted soil to prevent piping Plan (n.t.s.) Profile (n. t. s. ) fl.. °w straw bale bindings for straw bales to be placed parallel to ground BEEHIVE INLET STRAW BALE PROTECTION EROSION CONTROL SCHEDULE EROSION CONTROL MEASURE *MAINTENANCE INSTALLATION SEQUENCE ST ENTRANCE AS N N RIOR 0 CLEARING AND GRADING PRIOR TO CLEARING AND GRADING SILT FENCE EXISTING INLET PROTE K ANEEKLY, AFTER STORM EVENTS AND AS NEEDED IOR TO CLEARING AND GRADING TREE CTION WEEKLY AFTER STORM EVENTS AND AS NEEDED PRIOR CLEARING AND GRADING RA'FIER TEMPORARY Y T A G GRADING ROUG H GRADIN PERMANLNT SEEDING WATER AS NEE AFTER FINISH GRADING AFTER FINISH GRADING STRAW WEEKLY, AFTER ST EVENTS AN AS NEEDED INLET PROTECTION SEED. SOD & LANDSCAPE AROUND WEEKLY AFTER STORM EVENTS AND AS NEEDED AS NEEDM AFTER FINISHED GRADI G PLACED AROUN - FINISHED U I UNITS FINISHED BALES -WATER NA AFTER ALL AREAS DRAINING TO THESE AREAS ARE STABILIZED REMOVAL- OF R T PROTECTION- E­4 AFTER ALL AS DRAINING T SE ARE ARE STABILIZE REMOVAL OF SILT FENCE - N A AFTER ALL AREAS DRAINING TO THESE AREAS ARE STABILIZED * - SEE CHART FOR MAINTENANCE KLWIKt MtN I b REQUIREMENTS: CONTRIBUTING DRAINAGE AREA: 1 ACRE MAXIMUM. CAPACITY: RUNOFF FROM A 2 -YR. FREQUENCY, 24 -HR. DURATION STORM EVENT ENTERING THE STORM DRAIN WITHOUT BYPASS FLOW. LOCATION: AT CURB INLETS WHERE PONDING IS NOT LIKELY TO CAUSE INCONVENIENCE OR DAMAGE. GRAVEL: 1 -2 IN. DIAMETER (INDOT CA No. 2). WIRE MESH: CHICKEN WIRE OR HARDWARE CLOTH WITH 1/2 IN. OPENINGS. GEOTEXTILE FABRIC (OPTIONAL): FOR FILTRATION. INSTALLATION: 1. INSTALL GRAVEL CURB INLET PROTECTION AS SOON AS THE STREETS ARE PAVED IN A NEW DEVELOPMENT SITUATION OR BEFORE LAND DISTURBING ACTIVITIES IN STABILIZED AREAS. 2. PLACE WIRE MESH OVER THE CURB INLET OPENINGS AND /OR GRATE SO IT EXTENDS AT LEAST 12 IN. BEYOND BOTH TOP AND BOTTOM OF THE OPENING /GRATE. 3. INSTALL GEOTEXTILE FABRIC OVER THE WIRE MESH. FOR ADDITIONAL FILTRATION (OPTIONAL). 4. PILE GRAVEL OVER THE WIRE MESH TO ANCHOR IT AGAINST THE CURB, COVERING THE INLET OPENING COMPLETELY. 12' CRAWL FILTER /- /- SEDMENT LADEN WIRE MESH -%, _ i ! RUN -OFF WATER SEDIMENT CURB N4.ET ---- MM v tQVI --- FILTERED WATER MAINTENANCE: * AFTER EACH STORM EVENT, REMOVE SEDIMENT AND REPLACE THE GRAVEL; REPLACE THE GEOTEXTILE FILTER FABRIC IF USED. * PERIODICALLY REMOVE SEDIMENT AND TRACKED -ON SOIL FROM THE STREET (BUT NOT BY FLUSHING WITH WATER) TO REDUCE THE SEDIMENT LOAD ON THE CURB INLET PRACTICE. * INSPECT PERIODICALLY. AND REPAIR DAMAGE CAUSED BY VEHICLES. * WHEN THE CONTRIBUTING DRAINAGE AREA HAS BEEN STABILIZED, REMOVE THE GRAVEL. WIRE MESH, GEOTEXTILE FABRIC. AND ANY SEDIMENT AND DISPOSED OF THEM PROPERLY. COMMON CONCERNS: SEDIMENT NOT REMOVED FROM ROADWAY AND GRAVEL AND FABRIC NOT REPLACED FOLLOWING A STORM EVENT- - RESULTS IN INCREASED SEDIMENT TRACKING, TRAFFIC HAZARD, AND EXCESSIVE PONDING. DRAINAGE AREA TOO LARGE -- CAUSES SEDIMENT OVERLOAD AT THE INLET AND /OR BY -PASS FLOW. SLOPE CONSIDER R PLACING WITH OR USING NACOMB NATION /WITHDA SANDBAG CURB INLET PROTECTIONH (PRACTICE 3 6 )� GRAVEL ' CURB INLET PROTECTION EROSION CONTROL MEASURES MAINTENANCE REQUIREMENTS STRAW BALE DAM MANTENANCE REQUIREMENTS 1. INSPECT STRAW BALE DAMS AFTER EACH STORM EVENT AND PROMPTLY REMOVE ANY SEDIMENT DEPOSITS TO ENSURE ADEQUATE STORAGE VOLUME FOR THE NEXT RAW. TAKING CARE NOT TO UNDERMINE THE ENTRENCHED BALES, 2. INSPECT PERIODICALLY FOR DETERIORATION OR DAMAGE FROM CONSTRUCTION ACTIVITIES AND REPAIR IMMEDIATELY. 3. AFTER THE CONTRIBUTING DRAINAGE AREA HAS BEEN STABILIZED. REMOVE ALL STRAW BALES AND SEDWT, BRING THE DISTURBED AREA TO GRADE. AND STABLUE it SILT FENCE MAINTENANCE REQUIREMENTS 1. 16KCT THE SILT FENCE PERIODICALLY AND AFTER EACH STORM EVENT. 2. IF FENCE FABRIC TEARS. STARTS TO DECOMPOSE. OR IN ANY WAY BECOMES NEFFECi1Yl~ REPLACE TIE AFFECTED PORTION IMMEDIATELY 3. REMOVE DEPOSITED SEDIMENT WHEN IT REACHES HALF THE HMT OF THE FENCE AT ITS LOWEST POINT OR IS CAUSING THE FABRIC TO BULGE. 4. TAKE CARE TO AVOID UNDERMINING THE FENCE DURING CLEAN OUT. & AFTER THE CONTRIBUTING DRAINAGE AREA HAS BEEN STABILIZED. REMOVE THE FENCE AND SEDIMENT DEPOSITS. BRING THE DISTURBED AREA TO GRADE. AND STAPL M TEMPORARY SEDIMENT TRAP MAINTENANCE REQUIREMENTS 1. INSPECT TEMPORARY SEDIMENT TRAPS AFTER EACH STORM EVENT AND IMMEDIATELY REPAIR ANY EROSION AND PIPING HOLES. 2. REMOVE SEDIMENT WHEN IT HAS ACCUMULATED TO ONE -HALF THE DESIGN DEPTH 3. REPLACE SPILLWAY GRAVEL FACING IF CLOGGED. 4. INSPECT VEGETATION. AND RE -SEED IF NECESSARY. S. CHECK THE SPILLWAY DEPTH PERIODICALLY TO ENSURE A MINIMUM OF 1.5 FT. DEPTH FROM THE LOWEST POINT OF THE SETTLED EMBANKMENT TO HIGHEST POINT OF THE SPILLWAY CREST, AND FILL ANY LOW AREAS TO MAINTAIN DESIGN ELEVATION. & PROMPTLY REPLACE ANY DISPLACED RIPRAP. BEING CAREFUL THAT NO STONES IN THE SPILLWAY ARE ABOVE DESIGN GRADE. 7. AFTER ALL DISTURBED AREAS HAVE BEEN STABILIZED, REMOVE THE STRUCTURE AND SEDIMENT. SMOOTH THE SITE TO BLEND WITH ADJOINING AREAS. AND STABILIZE. SANDBAG CURB INLET SEDIMENT BARRIER MAINTENANCE REQUIREMENTS 1. INSPECT FREOUENTLY FOR DAMAGE BY VEHICULAR TRAFFIC. AND REPAIR IF NECESSARY 2. WSPECT AFTER EACH STORM EVENT. 3. REMOVE SEDIMENT. VIMTHOUT FLUSHING. WHEN IT REACHES HALF THE HEKXiT OF THE BARRIER. 4. DEPOSIT REMOVED SEDIMENT WHERE IT WILL NOT ENTER STORM DRAINS. BLOCK AND GRAVEL CURB INLET PROTECTION MAINTENANCE REQUIREMENTS 1. AFTER EACH STORM EVENT. REMOVE THE SEDIMENT AND REPLACE THE GRAVEL; REPLACE THE GEOTEXTILE FABRIC. IF USED. 2. PERIODICALLY REMOVE SEDIMENT AND TRACKED -ON SOIL FROM THE STREET, WITHOUT FLUSHING. TO REDUCE THE SEDIMENT LOAD ON THE CURB INLET PROTECTION. 3. INSPXT PERIODICALLY FOR DAMAGE AND REPAIR; KEEP GRATES FREE OF DEBRIS, 4. WHEN THE CONTRIBUTING DRAINAGE AREA HAS BEEN STABILIZED. REMOVE THE GRAVEL. SIZE MESH, GEOTEXTILE FABRIC, AND ANY SEDIMENT, AND DISPOSE OF THEM PROPERLY. EROSION CONTROL BLANKET (SURFACE APPLIED) MAINTENANCE REQUIREMENTS 1. DURING VEGETATIVE ESTABLISHMENT, INSPECT AFTER STORM EVENTS FOR ANY EROSION BELOW THE BLANKET. 2. IF ANY AREA SHOWS EROSION. PULL BACK THAT PORTION OF THE BLANKET COVERING IT. ADD SOS.. RE -SEED THE AREA. AND RE -LAY AND STAPLE THE BLANKET. I AFTER VEGETATIVE ESTABLISHMENT, CHECK THE TREATED AREA PERIODICALLY. TEMPORARY GRAVEL CONSTRUCTION ENTRANCE MAINTENANCE REQUIREMENTS 1. INSPECT ENTRANCE PAD AND SEDIMENT DISPOSAL AREA WEEKLY AND AFTER STORM EVENTS OR HEAVY USE. 2. RESHAPE PAD AS NEEDED FOR DRAINAGE AND RUNOFF CONTROL. 3. TOPDRESS WITH CLEAN STORE AS NEEDED. 4. IMMEDIATELY REMOVE MUD AND SEDIMENT TRACKED OR WASHED ONTO PUBLIC ROADS BY BRUSHING OR SWEEPING FLUSHING SHOULD ONLY BE USED E THE WATER IS CONVEYED INTO A SEDIMENT TRAP OR BASIN. 5. REPAIR ANY BROKEN ROAD PAVEMENT IMMEDIATELY. EROSION AND SEDIMENT CONTROL PLAN SUMMARY AND 'RULE 5° DATA Project: Hazel Dell Corner Lot J4 Nature and Purpose. Commercial Retail Building Estimated Start: August 1. 2001 Estimated Completion of Site Development: December 1, 2001 FIoodplains, Floodway Fringes, Floodways- Mitchener Ditch Lakes, Streams, Channels. Ditches, Wetlands, etc.: Mitchener Ditch Existing Sod Types & Description (refer to cover sheet for soils map): Shoals silt loam: Deep, somewhat poorly drained sod, moderate permeability Miami sit loam: Deep, well drained soil with moderate permeability Westland Soils: Deep, poorly drained soils with slow permeability Receiving Waters- White River through Mitchener Ditch. Potential Areas Where Stormwater May Enter Groundwater: None known Existing Vegetation: The site currently under construction as part of commercial subdivision. Existing tree row is to be preserved on west boundary. Contact Person: Corby D. Thompson Plum Creek Partners LLC 11911 Lakeside Drive Fishers, IN 46038 (317) 849 -7607 Adjacent Land Use., North - Residential South - Commercial East - Commercial West - Residential Site Specific Sequence and Additional Notes: The perimeter swales should be constructed and stabilized as early as practical to prevent run -off from leaving the site or clean off -site water from washing through the site. Erosion control at oil inlets shall be installed immediately after inlet installation. Silt fence shall be installed prior to the start of earth work. Z� O 0! �0t1111111111,1 CROSS'''% O' • s. No. = 5 A20350) STATE OF ii 01 ' r / DATE: � IS DRAWING AND THE IDEAS, DESIGNS AND CONCEPTS CONTAINED HEREIN ARE THE EXCLUSIVE INTELLECTUAL PROPERTY OF THE SCHNEIDER CORPORATION. AND ARE NOT TO BE USED OR REPRODUCED. IN WHOLE OR IN PART, WITHOUT THE WRITTEN CONSENT OF THE SCHNEIDER CORPORATION. COPYRIGHTED BY THE SCHNEIDER CORP. 2001 f q 4bi Schneider THE SCHNEIDER CORPORATION Historic Fort Harrison 8901 Otis Avenue Indianapolis, IN 46216 -1037 Telephone: 317.82 6.7100 Fax: 317.826.7200 www.schneidercorp.com Architecture Civil Engineering Environmental Engineering Geotechnical Services GIS * LIS Home Builder Services Interior Design Land Surveying Landscape Architecture Transportation Engineering DATE: PROJECT NO.: 06/15/01 904.005 DRAWN BY: CHECKED BY: W SHEET TITLE: EROSION CONTROL DETAILS DRAWING FILES: R- \904 \005 \DWGS \C104 0 �►../ zold d 1.4 A z A z N-4 E­4 a w Q C) x x Cn W a DATE: PROJECT NO.: 06/15/01 904.005 DRAWN BY: CHECKED BY: DTR SHEET TITLE: EROSION CONTROL DETAILS DRAWING FILES: R- \904 \005 \DWGS \C104