Loading...
HomeMy WebLinkAbout81-01 C901 SpecificationsN m N N_ m -fl C" U Cn 0 0 ce EARTHWORK Minor adjustments to the grades may be required to J. Flushing Sewers - Flush all sanitary sewers except G. Backfilling - for a depth of at least 12 inches above the top of the pipe, backfill with earth or 3. Placing Concrete - Concrete shall be deposited so as to require as little P4 1. SCOPE OF WORK earthwork balances when minor excess material or shortages are encountered. It is recognized by the building sewers with water to obtain free flow through each line. Remove all silt and trash from granular material free from large stones, rock rehandling as practicable. When concrete is R: \904\005\DWGS\C901 SHEET NO.: parties hereto that the calculations of the Engineer appurtenances just prior to acceptance of work. fragments, roots or sod. Tamp this backfill thoroughly, taking care not to disturb the pipe. to be placed at an atmospheric temperature of 35 degrees F. or less, paragraph 702.10 of A. Extent: The work required under this section in determining earthwork quantities shall be ac- in accordance with the American Society of For the remaining trench depth, backfill with the Indiana Department of Transportation consists of all excavating. filling, rough grading 9 9 9 9 9 and related items necessary o complete the work Civil Engin Civil Engineers Standards for such calculations. K. Deflection Testing -All PVC and truss sewer earth or granular material containing stones or Specifications latest revision shall be followed. Y P indicated on the drawings and described in the Further, that these calculations are subject to the interpretations of soll borings as the physical limits (non- lateral) pipe must be tested for deflection with an acceptable go-no-go mandrel. No pipe P 9 9 P P rocks not larger than 4 inches. Bockfill under and within 5' of walks. parking areas. driveways � z specifications. The Contractor shall notify to writing the owners and the Engineer of an changes. 9 9 Y 9 of the various soil types, also the allowable variation in finish can exceed a deflection of 5X The deflection test must be conducted using a mandrel having diameter and street shall be granular material only - thoroughly compacted by approved methods. F. Concrete Curb errors, or omissions found on the plans or in P grade and compaction permitted the contractor. and that t all of these parameters may cause either an r equal to 95X of the inside diameter of the pipe. The 1. Expansion Joints -Shall be 1/2 inch thick the field, before work is started or resumed. excess shortage of actual earthwork materials test must be performed without a mechanical pulling H. Manhole Inverts - Construct manhole flow channels premoulded between storm structures & curb. � complete the project. If such on actual minor excess or shortage of materials occurs, the contractor shall device and the rope used to pull the mandrel must be no stronger than 150 pound test. Tag /trail rope of concrete sewer pipe or brick, smoothly finished and of semi - circular section conforming to the 2. Contraction /Control Joints - Unless otherwise a 1. In general. the items of work to be performed under this section shall include: contact the engineer to determine if adjustment can be to the imbalance may be of any size to allow removal of mandrel. A single individual of average size. weight and strength inside diameter of the connecting sewers. Make changes in size or grade gradually and changes in provided, contraction joints shall be sawed or scored joints spaced 10 feet on center. except for clearing and grubbing, removal of trees and mode correct of earth. 9 9 9 9 without the use of tools to gain leverage must pull direction by true curves. Provide such channels intersection radii where joints shall be placed 5' o.c. stumps (where required). protection of trees the mandrel. All pipe exceeding the allowable for all connecting sewers at each manhole. to remain. stripping and storage of topsoil, deflection must be replaced or repaired and retested. 3. Finish - Tamp and screed concrete as soon as fill compaction and rough grading of entire SANITARY SEWER SYSTEMS I. Subdrains - All subdrains shall be of the size placed, and fill any honey combed places. site. L. Storm Water Connections No roof drains. tooting shown on the plans and shall be constructed to the Finish square corners to 1/4" radius and 2. Excavated material that is suitable may Y be 1. SCOPE OF WORK drains and/or surface water drains may be grades shown. All drains constructed off -site as part of the outlet drain will be located as shown. other corners to radii shown. used for fills. All unsuitable material and connected to the sewer systems, including e sanitary G. Concrete Walks and Exterior Steps all surplus excavated material not required The work under this section includes all sanitary temporary connections during construction. J. Utilities - It shall be the responsibility of each shall be removed from the site. The location of dump and length of haul shalt be sewers. manholes. cleanouts and related items including excavating and bockfllling. necessary to complete the M. Waterline Crossing - Where water lines and contractor to verify all existing utilities and conditions pertaining to his phase of the work. 1. Slopes - Provide 1/4 inch per foot cross slope. Make adjustments in slopes at walk the Contractor's responsibility. work shown in the drawings. starting five feet outside the building walls. The ends of sewers shall be sanitary sewers cross and water lines cannot be placed above the sewer with a minimum of 18 inches It shall also be the contractors responsibility to intersections as necessary to provide proper 3. Provide and place any additional fill tightly plugged or capped at the terminal points, vertical clearance, the sewer must be constructed contact the owners of the various utilities before work is started. The contractor shall notify in drainage. material from off the site as may e y adjacent to buildings. pending the connecting of all of water works grade ductile iron pipe with writing the owners or the engineer of any changes. 2. Dimensions -Walks and steps shall be one necessary to produce the grades required. such lines to the building drain as specified In the mechanical joints within 10 feet of the water errors or omissions found on these plans or In the course construction and of widths and details Fill obtained from off site shall be of kind plumbing specifications and architectural drawings. line• field before work is started or resumed. shown on the drawings. and quality as specified for fills herein and the source approved by the Owner. 2. MATERIALS N. Utilities - It shalt be the responsibility of K. Contractor to grout joints inside storm 3. Finish - Screed concrete and trowel with a 4. The Contractor shall accept the site as he P A. Sanitary Sewers each contractor to verify all extsti nq utilities and conditions pertaining to his phase of the structures where pipes enter or exit and between structure and casting. steel trowel to a hard dense surface otter surface water has disappeared. Apply medium finds it and shall remove all trash. rubbish and debris from the site prior to starting P q 1. All gravity plastic sewer pipe and fittings work. It shall also be the contractors responsibility to contact the owners of the broom finish and scribe control joints at 5 » foot spacing. Provide 1/2 expansion joints excavation. shall conform to ASTM D3034, SDR -35 and meet various utilities before work is started. The where sidewalks intersect, and at o maximum a cell classification of 12454 B to contractor shall notify in writing the owners and spacing of 48 feet between expansion joints. B. Work not included: The following items of accordance with ASTM 1784, the engineer of any changes. errors or omissions STREETS related work are specified and included in other 2. All sanitary sewer lines upon completion will be found l i these on ese pans or n e e before work th fi k f field b is started or resumed. H. Curing Concrete - Except as otherwise specified, sections of these specifications: required to posy o low pressure air test. Said test cure all concrete by one of the methods described 1. Excavation. grading and bockfgllnq for shall be conducted according to ASTM F1417 -92, and 0. Service Laterals - Individual lot service lines 1. SCOPE OF WORK T Section ion S ci the Indiana Department of Transportation Specifications. latest revision. utility Imes shall be witnessed by an Engineer and a shall be 6" in diameter and of material equal to representative of the Clay Waste District. The testing shall be in accordance with Table 1, that specified in 2A of this section. Service lines shall be connected to the main sewer by a The work required under this section includes all 1. Bituminous Pavement - Hot asphalt concrete 2. Storm drainage systems wye of locations generally shown within these concrete and bituminous paving and related items pavement shall be as specified in Section 403 of 3. Sanitary sewer systems B. Manholes pions. Service lines shall be extended and necessary to complete the work indicated on drawings y P q and described in the specifications. including but not the Indiana Department of Transportation Specifications latest revisions. Paving will not 1. Precast reinforced concrete manhole sections capped at a point 5 feet beyond the right -of -way fine or one Pipe length for those services on the limited to: be permitted during unfavorable weather or when 4. Streeter and vin paving and steps Shoff conform to ASTM C -478 latest ep some side of the street as the main. Sewer the temperature Is 40 degrees F. and falling. 5. Water supply s PP Y Ys tem revision. service lines shall be marked on the curb with All streets, parking areas in contract limits Curbs and gutters J. Composted Aggregate Subbase 2. BENCH MARKS 2. Castings sholl be of uniform quality, free from blow holes, porosity. hard spots, red point and at the end of the line with a wooden 2x4 above the ground. Sidewalks and concrete slabs, exterior steps 1. The thickness shown on shrinkage distortion or other defects. They 2. MATERIALS the drawings is the minimum thickness of the Maintain carefully all bench marks, monuments and other shall be smooth and well - cleaned by shot- P. New Sanitary Sewer Main Construction - Contractor fully compacted subbase. Compaction shall be reference oints; if disturbed or destroyed. contractor P Ye blasting or by some other approved method. shall record dimensions of each service line stub A. Concrete - Concrete shall be ready -mixed concrete accomplished by rolling with a smooth wheeled shall contact en 9• sneer. They shall be coated with asphalt point from nearest downstream manhole measured along fine ti f i proportioned ne and and shall be a mix o roller weighing 8 to 10 tons. Compact to 90X which shall result in a smooth coating, the sanitary sewer main. The locations of coarse aggregates with Portland cement and water. compaction using Standard Testing Procedures. 3. REMOVAL OF TREES tough and tenacious when cold. not tack g y or manholes and service lines aloe with other g any Minimum cement content shall be 6 bags per cubic Along curbs, headers and walls and of all placed brittle. They shall be gray iron meeting construction changes are to be incorporated on "Record yard of concrete and maximum water content shall not accessible to the roller, the aggregate A. Remove all trees and stumps from area to be occupied by road and surfaced areas. Removal of ASTM A -48 latest revision. Manhole covers for sanitary sewer shall be Neenah Type the on inol construction drawings and �• Drawing prints submitted to the Town of Westfield be 5.5 U.S. gallons per sock of cement, including material shall be tamped with mechanical tampers P P or with approved hand tampers. trees outside these areas sholl only e done as Y R- 1772 -A with "f" concealed pickhole. and the engineer as soon after completion of construction as possible. moisture in the aggregate. Slump for normal weight concrete sholl be a maximum of 4 inches 2. Compact. following Section 304.05 of the 1995 noted on drawings or approved by the Owner. 3. Joints - manhole sections shall be jointed and a minimum of 2 inches. the slum of machine 1 INDOT Standard Specifications. P B. All brush, stumps, wood and other refuse from the P with sealed "o" rings. The "o" rings shall placed concrete shall be no less than 1/4 inches nor more than 3 inches. Standard test trees shall be buried onsite or removed to disposal areas - meet ASTM C 443 latest revisions. ASTM C -143 shall be used to measure slump. LAKE LM SPECF1 70N off of the site. Disposal by burning shall not be permitted unless proper permits are obtained 4. Bismatic coating shall be applied around STORM SEWER SYSTEMS Compressive strength of concrete at 28 days shall be 4000 psi. All exterior concrete shall have Acceptable liners ore as follows where applicable). The location of on site bur ( l )• Y its shall be designated b the owner or the P 9 Y each manhole pint from 6 inches above to 6 inches below each joint. Inside joints to 1. SCOPE OF WORK air entrainment of 5% to 896 by volume per ASTM C Engineer. be filled with recoot plug material. P P g -260. Retempering of delivered concrete will not 1. Natural Clay Liner 5. Manholes to be tested per ASTM C1244 -93 for P The work under this section includes all storm sewer; , be allowed. Concrete shall be composed of: A. laboratory testing shag be performed on the designated liner material to determine the optimum liner compaction criteria. Subsequent to determining 4. PROTECTION OF TREES "concrete sewer manholes" b negative y g storm water inlets, and related items. including excavating and backfilling. necessary to complete the 1. Portland cement - Conforming o ASTM C -150. 9 this compaction criteria, permeability testing drag be performed on remolded A. General Protection: The Contractor shall be air pressure (vacuum) test. work shown on the drawings. 9 . Type IA or Type IIIA, samples, compacted to this standard Laboratory testing shall be performed responsible for the protection of tops, trunks 3. APPLICATION 2. Aggregates: Conforming to ASTM C -33 at least one (1) month prior to initiating lining activities. and roots of existing trees on the project site 2. MATERIALS B. The contractor shag identify and retain the engineer- approved liner material that are to remain. Existing trees subject to construction damage shall be boxed. fenced or A. Permits and Codes - The intent of this section of the specifications is that the contractor's bid on A. Storm Sewers 3. Water - Shall be clear and free from injurious amounts of oils, acids, alkalies, for use on mating the side slopes and bottom of the lake. The oplkwm natural liner material shag not be used for other portions of site work prior otherwise protected before any work is started; do not stockpile within branch read. Remove P spread. the work covered herein shall be based upon the drawings and specifications but that the work 9 P 1. Reinforced concrete sewer pipe shall confirm organic materials or other deleterious to verification that adequate resources are available and have been stockpiled interfering branches without injury to trunks and shall comply with all applicable codes and to ASTM C -76 latest revision, with joints substances. It is important that the stockpiled soils be stared in as small an area as possible to retain natural moisture. The contractor should anticipate that cover scars with tree point. regulations as amended by any waivers. Contractor conforming to ASTM C -443 latest revision. When storm pipe is submerged B. Welded Steel Wire Fabric - Where required for additional sail work may be required to bring the liner material to required 5. HANDLING OF TOPSOIL shall furnish all bonds necessary to get permits for cuts and connections to existing sewers. concrete reinforcement shall conform to ASTM A185. uniform moisture level. A. Remove all organic material from the areas to be B. Local Standards - The term "local standards" as B. Manholes C. Premoulded Joint Filler -Shall be of non - extruding type meeting ASTM D -544 except that C. A representative of the testing engineer shop be present for inspection of the base and side dopes of the loke prior to and during compoction of the occupied by buildings. roads, walks and parking areas. Pile and store topsoil at a location used herein means the standards of design and construction of the respective municipal 1. Precast reinforced concrete manhole sections and steps shall conform to ASTM a sect latest premoulded joint filler used in concrete walk liner materials. where it will not interfere with construction department of utility company. P Y revision. construction may be either non - extruding or resilient. D. The day lining material. approved by the testing engineer. shall be operations. Topsoil shall be reasonably free from subsoil, debris. weeds, grass. stones. ect. C. Existing Improvements - Maintain in operating 2. Casting shall be of uniform quality. free D. Bituminous Pavement Materials - All materials compacted to a minnium of 12 inches thick on the upper two thirds of the side slopes and 18 inches an the lower one third A compacted minimum B. After completion of site acing and subsurface condition all active utilities, sewers and other drains encountered to the sewer Installation. from blow holes. porosity, Nord spots. shrinkage distortion or other defects. The g Y proposed for the construction of bituminous pavements shall comply with the Indiana Department of 18 to 24 inches approved lniing material shag be placed across the base of the lake. utility installation. top so shall be replaced in areas designated on the erosion control plan Repair to the satisfaction of the owner any damage to existing active improvements. shall be smooth and well cleaned b shot Y - blasting or by some other approved method. of Transportation specifications, per latest for seeding and /or sodding. Any remaining top They shall be coated with asphalt point revision. E. The day liner material sholl be regularly sampled and tested for sod shall be used for finished grading around landscaping D. Workmanship - To conform to all local. state and which shall result in a smooth coating. tough and tenacious when cold, not tacky or E. Compacted Aggregate Subbase: Shall be crushed conformance to the moisture and Ailerberg I'srnits established far the appr al(s). Field density and moisture testing shag also be approved ce otter structures and areas. notional codes and to be approved b all local and Y state agencies having jurisdiction. brittle. They shall be gray iron meeting stone or ravel. Crushed ravel shall be a g 9 y chuing construction to establish a correlation between performed frequently ASTM A -48 latest revision. minimum of 3596 crushed material. Cheri shall be density and field permeability. It is imperative that moisture levels be Y P� Y P 6. DISPOSITION OF UTILITIES: E. Trenching - Lay all pipe in open trenches. except 3. Joints - Manhole sections shall be jointed limited to a maximum of 8% of the total. Material shall be free from an excess of flat. elongated. maintained crier optimum as determined in laboratory testing. Only by moniann this condition will it be a to oath the zero voids 9 tf approach A. Rules and regulations governing the respective when the local authority ves written permission Y 9 P for tunneling. Open the trench sufficiently ahead with rubber type gaskets. The rubber type thinly laminated, soft or disintegrated pieces; and shall be free from fragments coated with dirt. condition and maximize natural finer capabilities. Off -site sources for der aP Y utilities shall be observed in executing ll work g of pipe-laying to reveal an obstructions. The y gaskets shall meet ASTM C -443 latest When Composted aggregate shall be graded oil follows: liner material may be used with approval by the Owns s representotive and on-site testing engineer. under this section. width of the trench shall be the inside pipe revision. manhole and storm pipe are B. If active utilities are encountered but not shown diameter plus 24 inches for 12 inches above the pipe. Sheet and brace trench as necessary to cont y In water. continuously SIEVE SIZE X PASSING F. Compoctim of the natural liner shag be performed by equipment operating on the drawings. the Engineer shall be advised protect workmen and adjacent structures. All C. SUBDRAINS 1 -1/2 100 up and down the dope. Engineered natural day liners shall not be compacted before work is continued. trenching to comply with Occupational Safety and 1" 80 -100 by equipment operating around the slopes on or near the some elevation. Health Administration Standards. Keep trenches 1. Perforated plastic pipe subdrains shall 3/4 70 -90 It is important that hydration of the day liners takes place after installation C. Inactive and abandoned utilities encountered in free from water while construction is in progress. nf coorm to ASTM F -405. 1/2 55 -80 is complete. This b typically accommprishW by natural rainfall or by application excavating and grading operations shall be Under no circumstances shall pipe or appurtenances #4 35 -60 of fresh water of the rate of one quarter gallon per square fool for of least reported to the Engineer. They shall be removed. be laid in standing water. Conduct the discharge 3. APPLICATION 18 25 -50 72 hours. This recommended rate of hydration will help prevent shrinkage plugged or capped as directed by the Utility from trench dewatering to drains or natural 130 12 -30 and cracking of the day liner and maintain its integrity Company and the Engineer. drainage channels. A. Permits and Codes - The intent of this section of . 0200 5 -10 the specifications is that the contractors bid on IL Bentonite D. It shall be the responsibility of each contractor F. Special Supports - Whenever, in the opinion of the the work covered herein shall be based upon the 3. APPLICATION A. Materials and instalbtion method to be reviewed by the testing engineer and to verify all existing utilities and conditions Engineer. the soil at or below the pipe grade drawings and specifications but that the work approved by the Engineer. pertaining to his phase of the work. It shall also be the contractors responsibility to contact is unsuitable for supporting sewers and appurtenances specified in this section, such shall ha comply w li bl s all with l a applicable codes an d d regulations as amended by any waivers. Contractor A. Grading - Do any necessary grading in addition to that performed in accordance with Earthwork ' Ill. Synthetic Liner the owners of the various utilities before work special support. in addition to those shown or shall furnish all bonds necessary to get permits Section, to bring subgrades, after final A. Materials and installation method to be reviewed by the testing engineer and Is started. specified, shall be provided as the Engineer may for cuts and connections to existing sewers. compaction. to the required grades and sections approved by the Engineer. 7. SITE GRADING: direct. and the contract will be adjusted. S. Local Standards - the term "Local Standards" as for site improvement. A. Grades. Contractor shall perform all cutting, G. Backfilling - for a depth of at least 12 inches above the top of the pipe, backfill with granular use i th t d d herein means e standards o design an d and f d construction of the respective municipal B. Preparation of Subgrade - Remove spongy and otherwise unsuitable material and replace with filling. compacting of fills and rough grading material free from large stones, rock fragments, department or utility company, stable material. No traffic will be allowed on TABLE 1 required to bring entire project area to grade as shown on the drawings. roots or sod. Compact this backfill thoroughly, taking care not to disturb the pipe. for the C. Existing Improvements - Maintain in operating prepared sub rode prior to paving. g P g TIME IN MINUTES AND SECONDS REQUIRED FOR FOR PRESSURE DROP FROM 3.5 PSIG TO 2.5 PSIG remaining trench depth. backfill with earth or condition all active utilities. sewers and other C. Compaction of Subgrade -The first 6 inches below (Based on 0.003 cfm per sq. ft. and 2.0 cfm) B. Rough Grading: the tolerance for paved areas 9 9 P shall not exceed 0.10 feet plus or minus above P granular material containing stones or rocks not larger than 4 inches. Backfill under and within 9 drains encountered in the sewer installation. Repair to the satisfaction of the owner any damage the Subgrade shall be composted to at least 10096 of the maximum dry density as determined by the Pipe Diameter D in Inches 4 6 8 10 12 15 18 21 24 27 30 33 36 39 the established subgrade. All other areas shall 5' of walks, parking areas, driveways and streets to existing active improvements. provisions of AASHO T -99. Water shall be not exceed 0.10 feet plus or minus the established grade. All banks and other breaks in shall be granular material onl y g y thorou hl compacted. by approved methods. D. Workmanship - To conform to all local, state and prevented from standing on the compacted subgrade. 25 :04 :10 :18 :28 :40 1:02 1:29 2:01 2:58 3:20 4:08 4:59 5:56 6:58 25 grade shall be rounded at top and bottom. national codes and to be approved by all local and D. Utility Structures - Check for correct elevation 50 :09 :20 :35 :55 1:19 2:04 2:58 4:03 5:17 6:41 8:15 9:59 11:53 13:57 50 H. Flow Channels - The flow channels within manholes state agencies having jurisdiction. of all manhole covers, valve boxes and similar 75 :13 :30 :53 1:23 1:59 3:06 4:27 6:04 7:55 10:01 12:23 14:58 17:00 18:25 75 C. Compaction Requirements: shall be an integral port of the precast base. The channels shall be shaped and formed fora E. Trenching - Lay all pipe to open trenches. except structures located within areas to be paved. and have in 100 :18 :40 1:11 1:50 2.38 4:08 5:56 8: OS 10:39 12:45 14:11 15:35 ' 100 1. All building pad areas shall be compacted to clean transition with proper hydraulics to allow P when the local authority gives written permission make. or mode, any necessary adjustments such structures. 125 :22 :50 1:28 2:18 3:18 5:09 7:26 9:55 11:20 125 standards specified by local and /or state the smooth conveyance of flow through the manhole. for tunneling. Open the trench sufficient ahead 150 :26 :59 1:46 2:45 3:58 6:11 8:30 150 building codes. The bench wall shall be formed to the crown of the of ptpeloying to reveal any obstructions. The E Placing Concrete E. g inlet and outlet pipes to forma U shaped width of the trench shall be the inside pipe 175 :31 1:09 2.03 3:13 4.37 7.05 175 2. For compaction requirements of paved areas, channel. The bench wall shall slope back from the diameter plus 24 inches for 12 inches above the 1. Subgrade - Place concrete only on a moist, 200 :35 1:19 2:21 3:40 5 :17 200 see street specifications. crown at 1/2 inch per foot to the manhole wall, pipe. Sheet and brace trench as necessary to protect workmen and adjacent structures. All compacted subgrade or base free from loose 225 :40 1:29 2:38 4:08 5:40 225 I. Infiltration - The contractor shall furnish trenching to comply with Occupational Safety and material. Place no concrete on a muddy or frozen subgrade. 250 :44 1:39 2:56 4:35 250 & EARTH WORK BALANCE necessary equipment to test sewers for Health Administration Standards. Keep trenches 275 :48 1:49 3.14 4.43 275 The Contractor shall confirm all earthwork quantities infiltration. Infiltration rates sholl not exceed the Local Standards. All sanitary sewer lines free from water while construction is in progress. Under no circumstances lay pipe or appurtenances 2. Forms - All forms shall be free from warp. tight to leakage 300 :53 1:59 3:31 300 prior to start of construction. If an excess or shortage of earth Is encountered. the Contractor shall upon completion will be required to pose a low in standing water. Conduct the discharge from trench dewotering to drains or natural drainage enough prevent and substantial enough to maintain their Shope 350 1 :02 2:19 3:47 350 confirm with the Owner and Engineer the requirements pressure air test, unless otherwise directed by Hamilton Western Utilities. Said test shall be channels. and position without springing or settling. when concrete is placed. Forms shall be 400 1.10 2:38 400 for stockpiling. removal or Importing of earth. P q conducted according to NCPI Standard Method, and clean and smooth immediately before 450 1:19 2:50 450 shall be witnessed by an inspector authorized by F. Special Supports - Whenever in the opinion of the Engineer the soil at or below the pipe grade is concreting. 500 1:28 500 Hamilton Western Utilities. Infiltration under test shall not exceed 200 gallons per inch of inside diameter unsuitable for supporting sewers and appurtenances 550 1:37 550 of sewer pipe per mile of sewer in 24 hours and specified in this section, such special support. 600 1 :46 600 inclusive of all appurtenances within the section being tested such as manholes, house connections, in addition to those shown or specified, shall be provided as the Engineer may direct. and the 650 1:53 2:50 3:47 4 :43 5:40 7:05 8:30 9:55 11:20 12:45 14:11 15:35 17:00 18:25 650 etc. contract will be adjusted. `��t1111111111/r� GOR.. CR No. ' 920350 err STATE OF 01�`s INDIAN?`: � 0 ........... A L t �� c DATE: (p rr d THIS DRAWING AND THE IDEAS, DESIGNS AND CONCEPTS CONTAINED HEREIN ARE THE EXCLUSIVE INTELLECTUAL PROPERTY OF THE SCHNEIDER CORPORATION, AND ARE NOT TO BE USED OR REPRODUCED, IN WHOLE OR IN PART, VATHOUT THE WRITTEN CONSENT OF THE SCHNEIDER CORPORATION. Q COPYRIGHTED BY THE SCHNEIDER CORP. (2001 obi Schneider THE SCHNEIDER CORPORA11ON Historic Fort Harrison 8901 Otis Avenue Indianapolis, IN 46216 -1037 Telephone: 317.826.7100 Fax: 317.826.7200 www.schneidercorp.com Architecture Civil Engineering Environmental Engineering Geotechnical Services GIS * LIS Home Builder Services Interior Design Land Surveying Landscape Architecture Transportation Engineering DATE: PROJECT NO.: 06/15/01 904.005 DRAWN BY: P4 W SHEET TITLE: SPECIFICATIONS DRAWING FILES- R: \904\005\DWGS\C901 SHEET NO.: N� 0 2 d z � z W^ O � w W � N a W DATE: PROJECT NO.: 06/15/01 904.005 DRAWN BY: CHECKED BY: p DT R SHEET TITLE: SPECIFICATIONS DRAWING FILES- R: \904\005\DWGS\C901 SHEET NO.: