ConstructionlStormwater Pollution Prevention Plan
Technical Review and Comment (Form 1)
Project Name: 'i~:Meri(li
Plan Submittal Date: 10/13/05 Hydrologic Unit Code:
Project Location Description: South of Pennsylvania Parkway west of College
Latitude and Longitude: Lat- 39-55'-52" North Long- 86-08'-48" West
Civil Township: Clay Quarter: NE Section: 11 Township:
County: Hamilton
5120201090050
=
Q
~ Project Owner Name: Lauth Property Group
E Contact: Ryan Gallmeyer
Q
~ Address: 401 N. pennsylvania Parkway
~
~ City: Indianapolis
.~ Phone: 317-575-3127
I-l
~ Plan Preparer Name: Dan Kuester
Affiliation: W oolpert INC
Address: 7140 Waldemar Drive
City: Indianapolis
Phone: 317-299-7500
17N
Range:
3E
State: IN
Zip: 46280
E-Mail: rgallmeyer@lauth.net
FAX:
FAX:
State: IN
317-291-5805
Zip: 46268
E-Mail:
Review Date: 10/13/05
~ Principal Plan Reviewer: John B. South P.E. CPESC
.~ Agency: Hamilton County Soil and Water Conservation District
QJ
~ Address: 1108 South 9th Street
; City: Noblesville
5: Phone: 317-773-2181
Assisted By:
FAX:
State: IN
317-776-1101
Zip: 46060
E-Mail: john-south@iaswcd.org
../ PLAN IS ADEQUATE: A comprehensive plan review has been completed and it has been determined that the
plan satisfies the minimum requirements and intent of 327 lAC 15-5.
o Please refer to additional information included on the following page(s).
o Submit Notice of Intent (NOI): Attach a copy of this cover page when submitting the NOI to the Indiana
Department of Environmental Management. Construction activities may begin 48 hours following the submittal of
the NO/. A copy of the NOI must also be sent to the Reviewing Authority (e.g. SWCD, DNR).
o A preliminary plan review has been completed; a comprehensive review will not be completed within the 28-day
review period. The reviewing authority reserves the right to perform a comprehensive review at a later date and
revisions to the plan may be required at that time to address defic~encies.
D Please refer to additional information included on the following page(s).
D Submit Notice of Intent (NOI): Attach a copy of this cover page when submitting the NOI to the Indiana
Department of Environmental Management. Construction activities may begin 48 hours following the submittal of
the NO/. A copy of the NOI must also be sent to the Reviewing Authority (e.g. SWCD, DNR).
o PLAN IS DEFICIENT: Significant deficiencies were identified during the plan review.
o Please refer to additional information included on the following page(s).
o DO NOT file a Notice of Intent for this project.
o DO NOT commence land disturbing activities until all deficiencies are adequately addressed, the plan re-
submitted, and notification has been received that the minimum requirements have been satisfied.
o Plan Revisions 0 Deficient Items should be mailed or delivered to the Principal Plan Reviewer identified
in the Plan Review Section above.
DNR, Division of Soil Conservation
Page 1 of8
Revised 12/09/03, Form 1
;-
e
e
ConstructionlStormwater Pollution Prevention Plan - Technical Review and Comment (Form 1)
Project Name: Meridian Corporatate Campus Phase 1
Date Reviewed: 10/13/05
The technical review and comments are intended to evaluate the completeness of the Construction/Stormwater Pollution
Prevention Plan for the project. The Plan submitted was not reviewedfor the adequacy of the engineering design. All
measures included in the plan, as well as those recommended in the comments should be evaluated as to their feasibility
by a qualified individual with structural measures designed by a qualified engineer. The Plan has not been reviewed
or other local, state, or federal permits that may be required to proceed with this project. Additional information,
including design calculations may be requested to further evaluate the Plan.
All proposed stormwater pollution prevention measures and those referenced in this review must meet the design criteria
and standards set forth in the "Indiana Stormwater Quality Manual" from the Indiana Department of Natural
Resources, Division of Soil Conservation or similar Guidance Documents.
Please direct questions and/or comments regarding this plan review to:
John B. South P.E. CPESC
Please refer to the address and contact information identified in the Plan Review Section on page 1.
Assessment of Construction Plan Elements (Section A)
The Construction Plan Elements are adequately represented to complete a plan review:
0 Yes 0 No
The items checked below are deficient and require submittal to meet the requirements of the rule.
A A
0 1 Index showing locations of required Plan Elements 0 2 11 by 17 inch plat showing building lot
numberslboundaries and road layout/names
0 3 Narrative describing the nature and purpose of the 0 4 Vicinity map showing project location
project
0 5 Legal Description of the Project Site 0 6 Location of all lots and proposed site
(Include Latitude and Longitude - NOI Requirement) improvements (roads, utilities, structures, etc.)
0 7 Hydrologic unit code (14 Digit) 0 8 Notation of any State or Federal water quality
permits
0 9 Specific points where stormwater discharge will leave 0 10 Location and name of all wetlands, lakes and
the site water courses on and adjacent to the site
D 11 Identification of all receiving waters 0 12 Identification of potential discharges to ground
water (abandoned wells, sinkholes, etc.)
D 13 100 year floodplains, floodways, and floodway fringes D 14 Pre-construction and post construction estimate of
Peak Discharge (10 Year storm event)
D 15 Adjacent landuse, including upstream watershed D 16 Locations and approximate boundaries of all
disturbed areas (Construction Limits)
D 17 Identification of existing vegetative cover D 18 Soils map including soil descriptions and
limitations
0 19 Locations, size and dimensions of proposed stormwater 0 20 Plans for any off-site construction activities
systems (e.g. pipes, swales and channels) associated with this project (sewer/water tie-ins)
0 21 Locations of proposed soil stockpiles and/or 0 22 Existing site topography at an interval appropriate
borrow/disposal areas to indicate drainage patterns
D 23 Proposed final topography at an interval appropriate to
indicate drainage patterns
DNR, Division of Soil Conservation
Page 20f8
Revised 12/09/03, Form 1
e
e
ConstructionlStormwater Pollution Prevention Plan - Technical Review and Comment (Form 1)
Project Name: Meridian Corporatate Campus Phase 1
Date Reviewed: 10/13/05
~
~
~
=
QJ .... .~
...- = ~.
~ QJ ...
= .- ~
O"~<
QJ lC ...
~ ~ ~ B
00 1
0D
0D
0DD
D00
0DD
OD0
000
000
00
00
00
00
00
000
QJ ...-
...- =
~ ~
= .-
0" ~
~~
<~
0D
00
00
00
00
Assessment of Stormwater Pollution Prevention Plan (Sections B & C)
Stormwater Pollution Prevention Plan - Construction Component (Section B)
The construction component of the Stormwater Pollution Prevention Plan includes stormwater quality
measures to address erosion, sedimentation, and other pollutants associated with land disturbance and
construction activities. Proper implementation of the plan and inspections of the construction site are
necessary to minimize the discharge of po llu tan ts. The Project Site Owner should be aware that
unforeseen construction activities and weather conditions may affect the performance of a practice or the
effectiveness of the plan. The plan must be aflexible document, with provisions to modify or substitute
practices as necessary.
Description of potential pollutant sources associated with construction activities
2 Sequence describing stormwater quality measure implementation relative to land disturbing
activities
3 Stable construction entrance locations and specifications (at all points of ingress and egress)
4 Sediment control measures for sheet flow areas
5 Sediment control measures for concentrated flow areas
6 Storm sewer inlet protection measure locations and specifications
7 Runoff control measures (e.g. diversions, rock check dams, slope drains, etc.)
8 Storm water outlet protection specifications
9 Grade stabilization structure locations and specifications
10 Location, dimensions, specifications, and construction details of each stormwater quality measure'
11 Temporary surface stabilization methods appropriate for each season (include sequencing)
12 Permanent surface stabilization specifications (include sequencing)
13 Material handling and spill prevention plan
14 Monitoring and maintenance guidelines for each proposed stormwater quality measure
15 Erosion & sediment control specifications for individual building lots
Stormwater Pollution Prevention Plan - Post Construction Component (Section C)
The post construction component of the Stormwater Pollution Prevention Plan includes the
implementation of stormwater quality measures to address pollutants that will be associated with the
finallanduse. Post construction stormwater qu~lity measures should be functional upon completion of
the project. Long term functionality of the measures are critical to their performance and should be
monitored and maintained.
~
~
~
=
CJ
..
~
~
~
<
...
~ C
1
2
Description of pollutants and their sources associated with the proposed land use
Sequence describing stormwater quality measure implementation
3 Description of proposed post construction stormwater quality measures
(Include a written description of how these measures will reduce discharge of expected pollutants)
4 Location, dimensions, specifications, and construction details of each stormwater quality measure
5 Description of maintenance guidelines for post construction stormwater quality measures
DNR, Division of Soil Conservation
Page 3 of8
Revised 12/09/03, Form 1
tIt
e
rOSo'f.()(J II
Construction/Stormwater Pollution Prevention Plan
Technical Review and Comment (Form 1)
Project Name: ~Meridian Corporatate campus Phase"
Plan Submittal Date: 10/07/05 Hydrologic Unit Code:
Project Location Description: South of Pennsylvania Parkway west of College
Latitude and Longitude: Lat- 39-55'-52" North Long- 86-08'-48" West
Civil T _ ___ -r" Clay Quarter: NE Section: 11 T
County: Hamilton
5120201090050
=
Q
.-
~ Project Owner Name: Lauth Property Group
E Contact: Ryan Gallmeyer
~ Address: 401 N. pennsylvania Parkway
~
~ City: Indianapolis
.~ Phone: 317-575-3127
Q
J.
~
. ~..
.a
17N
R9np'e~
c
3E
FAX:
E-Mail: .0.11
Zip: 46280
/""'\1 ,1 "POt
.I '-/
State: IN
Plan Preparer Name: Dan Kuester
Affiliation: Woolpert INC
Address: 7140 Waldemar Drive
City: Indianapolis
Phone: 317-299-7500
FAX:
State: IN
317-291-5805
Zip: 46268
E-Mail:
Review Date: 10/12/05
~ Principal Plan Reviewer: John B. South P.E. CPESC
.~ Agency: Hamilton County Soil and Water Conservation District
QJ
~ Address: 1108 South 9th Street
; City: N oblesville
5: Phone: 317-773-2181
Assisted By:
FAX:
State: IN
31 7 - 776-1101
Zip: 46060
E-Mail: john-south@iaswcd.org
PLAN IS ADEQITATE: A comprehensive plan review has been completed and it has been determined that the
plan satisfies the minimum requirements and intent of 327 lAC 15-5.
o Please refer to additional information included on the following page(s).
o Submit Notice of Intent (NOI): Attach a copy of this cover page when submitting the NOI to the Indiana
Department of Environmental Management. Construction activities may begin 48 hours following the submittal of
the NO!. A NOI must also be sent to the SWCD,
o A preliminary plan review has been completed; a comprehensive review will not be completed within the 28-day
review period. The reviewing authority reserves the right to perform a comprehensive review at a later date and
revisions to the plan may be required at that time to address deficiencies.
o Please refer to additional information included on the following page(s).
o Submit Notice of Intent (NOI): Attach a copy of this cover page when submitting the NOI to the Indiana
Department of Environmental Management. Construction activities may begin 48 hours following the submittal of
the NO!. A NOI must also be sent to the
o PI.JA.N IS DEFICIENT: Significant deficiencies were identified during the plan review.
o Please refer to additional information included on the following page(s).
o DO NOT file a Notice of Intent for this project.
o DO NOT commence land disturbing activities until all deficiencies are adequately addressed, the plan re-
submitted, and notification has been received that the minimum requirements have been satisfied.
Plan Revisions
Deficient Items should be mailed or delivered to the Principal Plan Reviewer identified
in the Plan Review Section above.
DNR, Division of Soil Conservation
Page 1 of8
Revised 12/09/03, Form 1
e
e
ConstructionlStormwater Pollution Prevention Plan - Technical Review and Comment (Form 1)
Project Name: Meridian Corporatate Campus Phase 1
Date Reviewed: 10/12/05
The technical review and comments are intended to evaluate the completeness of the Construction/Stormwater Pollution
Prevention Plan for the project. The Plan submitted was not reviewed for the adequacy of the engineering design. All
measures included in the plan, as well as those recommended in the comments should be evaluated as to their feasibility
by a qualified individual with structural measures designed by a qualified engineer. The Plan has not been reviewed
or other local, state, or federal permits that may be required to proceed with this project. Additional information,
including design calculations may be requested to further evaluate the Plan.
All proposed s torm water pollution prevention measures and those referenced in this review must meet the design criteria
and standards setforth in the "Indiana Stormwater Quality Manual"from the Indiana Department of Natural
Resources, Division of Soil Conservation or similar Guidance Documents.
Please direct questions and/or comments regarding this plan review to:
John B. South P.E. CPESC
Please refer to the address and contact information identified in the Plan Review Section on page 1.
Assessment of Construction Plan Elements (Section A)
The Construction Plan Elements are adequately represented to complete a plan review:
o Yes 0 No
The items checked below are deficient and require submittal to meet the requirements of the rule.
D 1 Index showing locations of required Plan Elements
0 3 Narrative describing the nature and purpose of the
project
0 5 Legal Description of the Project Site
(Include Latitude and Longitude - NOI Requirement)
D 7 Hydrologic unit code (14 Digit)
0 9 Specific points where stormwater discharge will leave 0
the site
0 11 Identification of all receiving waters 0
0 1.3 100 year floodplains, floodways, and floodway fringes 0
0 15 Adjacent landuse, including upstream watershed 0
0 17 Identification of existing vegetative cover 0
D 19 Locations, size and dimensions of proposed stormwater 0
. systems (e.g. pipes, swales and channels)
o 2 Locations of proposed soil stockpiles and/or
1 borrow/disposal areas
O Proposed fmal topography at an interval appropriate to
23 . d. dr .
m lcate amage patterns
DNR, Division of Soil Conservation
Page 2 of8
o 2 11 by 17 inch plat showing building lot
numbers/boundaries and road layout/names
o 4 Vicinity map showing project location
D 6 Location of all lots and proposed site
improvements (roads, utilities, structures, etc.)
D 8 Notation of any State or Federal water quality
permits
10 Location and name of all wetlands, lakes and
water courses on and adjacent to the site
2 Identification of potential discharges to ground
1. water (abandoned wells, sinkholes, etc.)
14 Pre-construction and post construction estimate of
Peak Discharge (10 Year storm event)
16 Locations and approximate boundaries of all
disturbed areas (Construction Limits)
1.8 ~oi!s ~p including soil descriptions and
hnntatIons
20 Plans for any off-site construction activities
associated with this project (sewer/water tie-ins)
o 22 Existing site topography at an interval appropriate
to indicate drainage patterns
Revised 12/09/03, Form 1
e
e
ConstructionlStormwater Pollution Prevention Plan - Technical Review and Comment (Form 1)
Project Name: Meridian Corporatate Campus Phase 1
Date Reviewed: 10/12/05
Assessment of Stormwater Pollution Prevention Plan (Sections B & C)
The construction component of the Stormwater Pollution Prevention Plan includes stormwater quality
measures to address erosion, sedimentation, and other pollutants associated with land disturbance and
construction activities. Proper implementation of the plan and inspections of the construction site are
necessary to minimize the discharge ofpollutants. The Project Site Owner should be aware that
unforeseen construction activities and weather conditions may affect the performance of a practice or the
effectiveness of the plan. The plan must be a flexible document, with provisions to modify or substitute
B practices as necessary.
Description of potential pollutant sources associated with construction activities
Sequence describing stormwater quality measure implementation relative to land disturbing
activities
Stable construction entrance locations and specifications (at all points of ingress and egress)
Sediment control measures for sheet flow areas
Sediment control measures for concentrated flow areas
Storm sewer inlet protection measure locations and specifications
Runoff control measures (e.g. diversions, rock check dams, slope drains, etc.)
Storm water outlet protection specifications
Grade stabilization structure locations and specifications
10 Location, dimensions, specifications, and construction details of each stormwater quality measure
1..1 Temporary surface stabilization methods appropriate for each season (include sequencing)
12 Permanent surface stabilization specifications (include sequencing)
13 Material handling and spill prevention plan
14 Monitoring and maintenance guidelines for each proposed stormwater quality measure
15 Erosion & sediment control specifications for individual building lots
The post construction component of the Stormwater Pollution Prevention Plan includes the
implementation of stormwater quality measures to address pollutants that will be associated with the
lnallanduse. Post construction stormwater quality measures should be functional upon completion of
the project. Long term functionality of the measures are critical to their performance and should be
monitored and maintained.
Description of pollutants and their sources associated with the proposed land use
Sequence describing stormwater quality measure implementation
Description of proposed post construction stormwater quality measures
(Include a written description of how these measures will reduce discharge of expected pollutants)
Location, dimensions, specifications, and construction details of each stormwater quality measure
Description of maintenance guidelines for post construction stormwater quality measures
DNR, Division of Soil Conservation
Page 3 of 8
Revised 12/09/03, Form 1
e
e
~';060 g>fjO t I
Construction/Stormwater Pollution Prevention Plan
Technical Review and Comment (Form 1)
r]e~t Nil'me:Meridian Corporatate'Campus'Phase 1'~
Plan Submittal Date: 09/19/05 Hydrologic Unit Code:
Project Location Description: South of Pennsylvania Parkway west of College
Latitude and Longitude: Lat- 39-55'-52" North Long- 86-08'-48" West
= Civil Quarter: NE Section: 11
=
~ Project Owner Name: Lauth Property Group
E Contact: Ryan Gallmeyer
o
~ Address: 401 N. pennsylvania Parkway
~
'ti City: Indianapolis
.~ Phone: 317-575-3127
=
J-c
~
County: Hamilton
5120201090050
3E
State: IN
Zip: 46280
E-Mail: rgallmeyer@lauth.net
FAX:
Plan Preparer Name: Dan Kuester
Affiliation: W oolpert INC
Address: 7140 Waldemar Drive
City: Indianapolis
Phone: 317-299-7500
FAX:
State: IN
317-291-5805
Zip: 46268
E-Mail:
Review Date: 09/29/05
=: Principal Plan Reviewer: John B. South P.E. CPESC
.~ Agency: Hamilton County Soil and Water Conservation District
QJ
~ Address: 1108 South 9th Street
; City: Noblesville
5: Phone: 317-773-2181
Assisted By:
FAX:
State: IN
317-776-1101
Zip: 46060
E-Mail: john-south@iaswcd.org
PLAN IS ADEQITAI'E: A comprehensive plan review has been completed and it has been determined that the
plan satisfies the minimum requirements and intent of 327 lAC 15-5.
o Please refer to additional information included on the following page(s).
o Submit Notice of Intent (NOI): Attach a copy of this cover page when submitting the NOI to the Indiana
Department of Environmental Management. Construction activities may begin 48 hours following the submittal of
the NO/. A NOI must also be sent to the SWCD,
o A preliminary plan review has been completed; a comprehensive review will not be completed within the 28-day
review period. The reviewing authority reserves the right to perform a comprehensive review at a later date and
revisions to the plan may be required at that time to address deficiencies.
o Please refer to additional information included on the following page(s).
o Submit Notice of Intent (NOI): Attach a copy of this cover page when submitting the NOI to the Indiana
Department of Environmental Management. Construction activities may begin 48 hours following the submittal of
the NOI. A NOI must also be sent to the
o PI.JAN IS DEFICIENT: Significant deficiencies were identified during the plan review.
o Please refer to additional information included on the following page(s).
o DO NOT file a Notice of Intent for this project.
o DO NOT commence land disturbing activities until all deficiencies are adequately addressed, the plan re-
submitted, and notification has been received that the minimum requirements have been satisfied.
Plan Revisions
Deficient Items should be mailed or delivered to the Principal Plan Reviewer identified
in the Plan Review Section above.
DNR, Division of Soil Conservation
Page 1 of8
Revised 12/09/03, Form 1
e
e
Construction/Stormwater Pollution Prevention Plan - Technical Review and Comment (Form 1)
Project Name: Meridian Corporatate Campus Phase 1
Date Reviewed: 09/29/05
The technical review and comments are intended to evaluate the completeness of the Construction/Stormwater Pollution
Prevention Plan for the project. The Plan submitted was not reviewed for the adequacy of the engineering design. All
measures included in the plan, as well as those recommended in the comments should be evaluated as to their feasibility
by a qualified individual with structural measures designed by a qualified engineer. The Plan has not been reviewed
or other local, state, or federal permits that may be required to proceed with this project. Additional information,
including design calculations may be requested to further evaluate the Plan.
All proposed stormwater pollution prevention measures and those referenced in this review must meet the design criteria
and standards setforth in the "Indiana Stormwater Quality Manual"from the Indiana Department of Natural
Resources, Division of Soil Conservation or similar Guidance Documents.
Please direct questions and/or comments regarding this plan review to:
John B. South P.E. CPESC
Please refer to the address and contact information identified in the Plan Review Section on page 1.
Assessment of Construction Plan Elements (Section A)
The Construction Plan Elements are adequately represented to complete a plan review:
o Yes 0 No
The items checked below are deficient and require submittal to meet the requirements of the rule.
A
o 1 Index showing locations of required Plan Elements
o 3 Narrative describing the nature and purpose of the
project
o 5 Legal Description of the Project Site
(Include Latitude and Longitude - NOI Requirement)
o 2 11 by 17 inch plat showing building lot
numbers/boundaries and road layout/names
o 4 Vicinity map showing project location
o 7 Hydrologic unit code (14 Digit)
o 6 Location of all lots and proposed site
improvements (roads, utilities, structures, etc.)
D 8 Notation of any State or Federal water quality
permits
10 Location and name of all wetlands, lakes and
water courses on and adjacent to the site
12 Identification of potential discharges to ground
. . water (abandoned wells, sinkholes, etc.)
14 Pre-construction and post construction estimate of
Peak Discharge (1 0 Year storm event)
16 Locations and approximate boundaries of all
disturbed areas (Construction Limits)
1.8 ~oi~s ~p including soil descriptions and
lnmtatlons
20 Plans. for an~ off-~ite co.nstruction activities
assocIated WIth this project (sewer/water tie-ins)
o 22 Existing site topography at an interval appropriate
to indicate drainage patterns
0 9 Specific points where stormwater discharge will leave D
the site
0 11 Identification of all receiving waters 0
0 1.3 100 year floodplains, floodways, and floodway fringes 0
0 15 Adjacent landuse, including upstream watershed 0
0 17 Identification of existing vegetative cover 0
D 19 Locations, size and dimensions of proposed stormwater D
systems (e.g. pipes, swales and channels)
o 21 Locations of proposed soil stockpiles and/or
borrow/disposal areas
O Proposed final topography at an interval appropriate to
23 . d. d.
In Icate ramage patterns
DNR, Division of Soil Conservation
Page 2 of8
Revised 12/09/03, Form 1
It
e
ConstructionlStormwater Pollution Prevention Plan - Technical Review and Comment (Form 1)
Project Name: Meridian Corporatate Campus Phase 1
Date Reviewed: 09/29/05
Assessment of Stormwater Pollution Prevention Plan (Sections B & C)
The construction component of the Stormwater Pollution Prevention Plan includes stormwater quality
measures to address erosion, sedimentation, and other pollutants associated with land disturbance and
construction activities. Proper implementation of the plan and inspections of the construction site are
necessary to minimize the discharge ofpollutants. The Project Site Owner should be aware that
unforeseen construction activities and weather conditions may affect the performance of a practice or the
effectiveness of the plan. The plan must be aflexible document, with provisions to modify or substitute
B practices as necessary.
Description of potential pollutant sources associated with construction activities
Sequence describing stormwater quality measure implementation relative to land disturbing
activities
Stable construction entrance locations and specifications (at all points of ingress and egress)
Sediment control measures for sheet flow areas
Sediment control measures for concentrated flow areas
Storm sewer inlet protection measure locations and specifications
Runoff control measures (e.g. diversions, rock check dams, slope drains, etc.)
Storm water outlet protection specifications
Grade stabilization structure locations and specifications
10 Location, dimensions, specifications, and construction details of each stormwater quality measure
11 Temporary surface stabilization methods appropriate for each season (include sequencing)
12 Permanent surface stabilization specifications (include sequencing)
13 Material handling and spill prevention plan
14 Monitoring and maintenance guidelines for each proposed stormwater quality measure
15 Erosion & sediment control specifications for individual building lots
The post construction component of the Stormwater Pollution Prevention Plan includes the
implementation of storm water quality measures to address pollutants that will be associated with the
lnallanduse. Post construction stormwater quality measures should be functional upon completion of
the project. Long term functionality of the measures are critical to their performance and should be
monitored and maintained.
Description of pollutants and their sources associated with the proposed land use
Sequence describing stormwater quality measure implementation
Description of proposed post construction stormwater quality measures
(Include a written description of how these measures will reduce discharge of expected pollutants)
Location, dimensions, specifications, and construction details of each stormwater quality measure
Description of maintenance guidelines for post construction stormwater quality measures
DNR, Division of Soil Conservation
Page 3 of 8
Revised 12/09/03, Form 1
e
e
approved for construction until all Engineering Department and Carmel Utilities issues have been
resolved. The design engineer must certify all drawings submitted for fmal approval. We will
require a minimum of three-sets of drawings for approval after all issues have been resolved. The
drawings will be stamped as approved and will be signed by the City Engineer. One set will be
distributed to the Owner/Developer to be maintained on the construction site. The Engineering
Department will retain two sets. Ifmore than one approved/signed set is desired, we will approve
a maximum of two additional sets for a total of five. However, the additional sets must be
submitted with the required three sets.
5. Please be advised that any installation of signs, walls, irrigation systems, etc. within dedicated
right of way or dedicated easements will require a Consent to Encroach Agreement with the City
of Carmel's Board of Public Works and Safety.
6. We are enclosing copies of the following information for yoUr use:
. Commercial Project Approval Procedures
. Performance Release Procedure
. Building Permits
. Permit Data, Contacts, etc.
BONDING REQUIREMENTS
7. Upon initial review, it appears the following bonding requirements may apply to this project:
Performance Guarantees/Engineer's Estimates
Individual Performance Guarantees will be required for the following subdivision improvements:
. Right of Way Improvements, to include curb and median cuts, asphalt path and all other
improvements.
It is our assumption that the storm sewers/storm drainage system will be privately owned and
maintained.
The amount of the Performance Guarantee is based upon a certified Engineer's Estimate for 100%
of the cost of labor and materials to construct the individual improvements, to be provided by the
design engineer. Please provide detailed Engineers Estimates for each improvement including
unit costs, quantities, materials and types of materials, etc. Upon completion and release of
individual Performance Guarantees, a three-year Maintenance Guarantee will be required. The
Maintenance Guarantee amount is based upon 15% of the Performance amount for Streets and
Curbs and 10% of the Performance amount for all other improvements. Performance Guarantees
may be Performance or Subdivision Bonds or Irrevocable Letters of Credit. Please reference the
enclosures for more detailed explanation of our procedures.
RightoofWayPermit and Bonding
Any work in the dedicated right of way of Pennsylvania Parkway will require a Right of Way
Permit. If the work is included in the scope of work of a posted Performance Guarantee, no
additional bonding will be required. If it is not included, a License & Permit type Right of Way
bond will be required in the amount of $2,000.00 per instance of work in the right of way. Any
open cut in the pavement of Pennsylvania Parkway will require separate Board of Public
Works and Safety approval.
8. We have engaged Crossroad Engineers, PC to review all drainage plans and drainage calculations
submitted to this office for review. We will share Crossroad's comments as they are received.
When construction plans are submitted for review for this development, please provide 2-sets of
plans and calculations to allow us to send the extra set to Crossroad to save some time in the
review process. Please contact Crossroad Engineers to obtain a drainage review checklist. The
Department will expect the design submitted forO the development of construction drawings to
adhere to this checklist.
CONSTRUCTION PLAN COMMENTS
9. The proposed plan (August 2, 2005) is not in accordance with the fax from the City Engineer's
office to Ryan Gallmeyer on June 6, 2005. This fax was the result of a review of the proposed
access to this development between the City Engineer, the Assistant City Engineer, and
~
1-,
e
e
City of Carmel
VIA FAX: 656-3501
Original by mail
August 11, 2005
Fred Simmons
Simmons Architects, LLC
305 E New York Street
Indianapolis, IN 46204
CO~y
RE: Meridian Corporate Plaza (#05080011 DP/ADLS) - Development Plan and Architecture, Design,
Landscaping, Lighting & Signage Applications
Dear Mr. Simmons:
This letter is in response to your DP/ADLS Application for Meridian Corporate Plaza. Members at the TAC
Meeting will make additional comments on August 17. Please complete the following items:
1. Please add the docket number to the site plan, 05080011 DP/ADLS.
2. Please submit the Findings of Fact sheet that accompanies the Development Plan Application, which can
be found at http.//www ci c~rn1e-l1n lls/serviceslr)OC~s/r)OrSA htn1. Remember to include this page in
your info packets.
3. Provide a site plan that includes the adjacent buildings and roads to the site.
4. Label the building dimensions on the site plan.
5. Lighting: provide details/graphics of all lighting on the site, such as wall sconces, security lighting, etc. to
show uniform design, color, etc.
6. Pole Lighting: show flat lens or provide shielding on lights adjacent to residences.
7. Pole Lighting: reduce the height of the parking light poles to 15-ft within 90-ft of residential uses.
8. Lighting Plan: the foot-candles exceed .3 at the west property line; please correct.
9. Please1abel the half right of way of 1-465.
10. Update the label for the 45-ft 12 R/W of College Ave to include the word half.
11. Prepare a certificate of dedication of road right of way for Pennsylvania Pkwy and College Ave, pursuant
to the 20-yr thoroughfare Plan. Contact the Carmel Engineering Dept for more instruction at 571-2441.
12. Show/label the Build-To-Lines on each road frontage per chapter 23B.08.01. Variance approval will be
needed from the BZA for building locations.
13. Signage: provide external lighting details of the ground signs. Also, sign permits will be required.
14. Signage: what material is the ground sign face made of? Please label on the sign detail.
15. Signage: provide the current signage details on the site.
16. Signage: ground signs must be at least 10-ft from the proposed road right of way.
17. Please denote truck turnaround areas on the site plan.
18. Label building materials on the building elevation.
19. Provide the Golden Section analysis of the elevations, per Chapter 23B.09.G.3 & 23B.09.B.
20. Please provide the computer-generated rendering as viewed from a further distance, to encompass most of
the site.
21. Provide color elevation/rendering or a photo of the existing building and explain how the proposed