Loading...
HomeMy WebLinkAbout71-01 SP Maintenance of Traffic PlanCONSTRUCTION Barricade Placement A ■ During Construction B ■ At the End of Construction Day PAVEMENT DUMBARTON STREET ®1F 'II7RLAFFM11C a.1FaTE7%lID — ROAD CONSTRUCTION SIGN WITH: TYPE "A" CONSTRUCTION WARNING LIGHT (LOW INDUSTRIAL FLASHING) • — BARREL ® — NEW PAVEMENT WITHIN R/W 0 — ROAD CONSTRUCTION AHEAD (XW20 -1); 48 "08" END CONSTRUCTION (XG20 -1); 60 "x24" FLAGGER AHEAD (XW20 -7) �'— — DIRECTION OF TRAFFIC — FLAGGER REQUIRED HORSFERRY ROAD ENTRANCE STRIPING PLAN Dumbarton Street & West 131st Street SCALE: 1' =50' DUMBARTON STREET HOLEY MOLEY SAYS "DON'T DIG BLIND "IT'S THE LAW" CALL 2 WORKING DAYS BEFORE YOU DIG 1- 800 - 382 -5544 CALL TOLL FREE PER INDIANA STATE LAW IS -69 -1991. IT IS AGAINST THE LAW TO EXCAVATE WITHOUT NOTIFYING THE UNDERGROUND LOCATION SERVICE TWO (2) WORKING DAYS BEFORE COMMENCING WORK. NOTE: ALL PAVEMENT MARKINGS TO BE THERMOPLASTIC. W, Imo\ > I I' i ASSUMED NORTH 1. IT SHALL BE THE RESPONSIBILITY OF EACH SUBCONTRACTOR TO VERIFY ALL EXISTING UTILITIES AND CONDITIONS PERTAINING TO THEIR PHASE OF WORK. IT SHALL ALSO BE THE SUBCONTRACTOR'S RESPONSIBILITY TO CONTACT THE OWNERS OF THE VARIOUS UTILITIES FOR PROPER STAKE LOCATIONS OF EACH UTILITY BEFORE WORK IS STARTED. THE SUBCONTRACTOR SHALL NOTIFY, IN WRITING, THE OWNER AND THE ENGINEER OF ANY CHANGES, OMISSIONS, OR ERRORS FOUND ON THESE PLANS OR IN THE FIELD BEFORE WORK IS STARTED OR RESUMED. 2. ALL CONSTRUCTION ACTIVITY ON THIS SITE IS TO BE PERFORMED IN COMPLIANCE WITH APPLICABLE O.S.H.A. STANDARDS FOR WORKER SAFETY. 3. ALL CONSTRUCTION INSIDE PUBLIC RIGHT -OF -WAY SHALL BE PERFORMED IN ACCORDANCE WITH THE REQUIREMENTS OF THE INDIANA DEPARTMENT OF TRANSPORTATION ( INDOT) FOR CONSTRUCTION INCLUDING MATERIALS, METHODS OF CONSTRUCTION, - AND TRAFFIC CONTROL. 4. MAINTENANCE OF TRAFFIC DEVICES ARE TO CONFORM TO INDIANA DEPARTMENT OF TRANSPORTATION STANDARD SPECIFICATIONS, DATED 1995 (LATEST EDITION). FOR MORE DETAIL SEE INDIANA DEPARTMENT OF TRANSPORTATION STANDARD DRAWINGS. 5. ALL TRAFFIC CONTROL METHODS AND PROCEDURES AND LAYOUT, AS DETERMINED BY THE CONTRACTOR, SHALL BE IN COMPLIANCE WITH LOCAL REQUIREMENTS AND THE INDIANA MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES FOR STREETS AND HIGHWAYS, LATEST EDITION. 6. IT IS THE CONTRACTOR'S RESPONSIBILITY TO NOTIFY INDOT BEFORE ANY ROAD CONSTRUCTION IS TO BEGIN. 7. THE CONTRACTOR SHALL FURNISH, INSTALL AND MAINTAIN IN PROPER WORKING ORDER, ALL CONSTRUCTION SIGNS, LIGHTS, BARRELS AND OTHER TRAFFIC CONTROL EQUIPMENT AS MAY BE REQUIRED TO FULLY MAINTAIN, AS NEARLY AS POSSIBLE, NORMAL TRAFFIC WITHIN THE CONSTRUCTION AREA. CONSTRUCTION SIGNS SHALL REMAIN IN PLACE UNTIL ALL ROAD CONSTRUCTION IS COMPLETE. 8. THE CONSTRUCTION WILL CONSIST OF ADDING AN ACCELERATION /DECELERATION LANE WITH BARREL ARRAYS AND SIGNS POSTED AT EACH END OF THE WORK ZONE AS SHOWN ON THE PLAN. UPON COMPLETION OF WORK THE BARRELS WILL BE REMOVED. 9. CONSTRUCTION HOURS IN THE INDOT RIGHT -OF -WAY WILL BE ONLY FROM 9:00 A.M. TO 4:00 P.M., OR AS AUTHORIZED BY INDOT. 10. DURING NON- CONSTRUCTION HOURS, BOTH LANES OF 116th & 121st STREET WILL BE OPENED FOR PUBLIC USE. THIS WILL HORSFERRY ROAD 1AINTENANCE OF TRAFFIC PLAN Dumbarton Street & West 131 st Street SCALE: 1' =50' k RFC�F1 \ ►« p ;SS z 0 5 w `\`�,o•�``��p K s . T �. QP G�STf,p�:04 No. 9500028 '700 .. STATE OF �k�F.... /iypl ANP.. DATE: L THIS DRAWING AND THE IDEAS. DESIGNS AND CONCEPTS CONTAINED HEREIN ARE THE EXCLUSIVE INTELLECTUAL PROPERTY OF THE SCHNEIDER CORPORATION, AND ARE NOT TO BE USED OR REPRODUCED, IN WHOLE OR IN PART, WITHOUT THE WRITTEN CONSENT OF THE SCHNEIDER CORPORATION. © COPYRIGHTED BY THE SCHNEIDER CORP. (2003 f q 4bi Schneider THE SCHNEIDER CORPORATION 12821 E. New Market Street Suite 100 Carmel, IN 46032 Telephone: 317.569.8112 Fax: 317.826.6410 www.schneidercorp.com Architecture Civil Engineering Environmental Engineering Geotechnical Services GIS * LIS Home Builder Services Interior Design Land Surveying Landscape Architecture Transportation Engineering DATE:: PROJECT NO.: 6/30/03 1238.9006 DRAWN'BY: O DATE:: PROJECT NO.: 6/30/03 1238.9006 DRAWN'BY: CHECKED BY: MLB SHEETI TITLE: MAINTENANCE OF TRAFFIC PLAN DRAWING FILES: N: \1238 \9006 \DWGS \C302.DWG XREF: - 9006BS.DWG XREF: 1009BS.DWG XREF: 1OPOrev30403.dwg SHEET NO.: CC3® 2