Loading...
HomeMy WebLinkAbout44-01 Plans March 22 2001 Foundation Slab PlanANCHOR BOLT SCHEDULE DIAMETER (D) *MINIMUM EMBEDMENT (E) a a a T CONC 11/4"xYxY WASHER W/ DBLE STD NUT ASTM A36 STEEL 3000 PSI CONC Cl TS6x6x1 /4 5/8" 8" 3/4" 3/4 "x10 %10 ", (4) 3/4" A36 A.B.'S 7/8" 12" 1 " 14" 1 1/8" 16" 1 1/4" 18" CONT.x4'- 0 "x1' -2" (4) #5 CONT. BOTTOM #5 @16" 0/C LATERAL CENTERED IN FTG DIAMETER OF BOLT PER COL. SCHEDULE NOTES: 1. DEVELOPS FULL TENSILE CAPACITY OF SINGLE BOLT. 2. SEE COL. SCHEDULE FOR ADD'L ANCHOR BOLT INFO. COLUMN - SEE PLAN AND SCHEDULE POURABLE GROUT POUR GROUT UP - r ON BASE PLATE LEVELING NUTS 1/4 "x3"x3" WASHER W/ DBLE STD NUTS SCALE: 1" = 1' -0" 2 _g• WALL SEE PLAN BASE PL - SEE SCHEDULE DOUBLE NUTS AND WASHERS, SEE ANCHOR BOLT TYPES TOP OF PILE CAP OR FOOTING 6" PROJECTION TYP, CONTRACTOR & STL FABRICATOR TO VERIFY REQUIRED PROJECTION TO ACCOMMODATE BASE PL'S 41 EMBEDMENT LENGTH SEE SCHEDULE i 7 CONTROL JOINT FLOOR SLAB ISOLATION JOINT — 1/2" ISOLATION JOINT 1/2" PREFORMED JOINT MATERIAL CONTRACTOR PREFORMED JOINT MATERIAL OPTION A SIMILAR IB SIMILAR \:FLOORSLAB CORNER COLUMN WOOD HEADER FLOOR 'DILATION Rio CONTROL JOINT SlAO "DIAMOND" CONCRETE I INTERIOR COLUMN _IfI 1/Y PREFORMED n -! _ b „* JOINT MATERIAL ATTACH TO SLAB FOOTING 1 SECTION 431$ S�DD SCALE: NTS CONCO006 w C> 0 0 Li w V) U) a W V) or HANDRAIL DESIGN AND ATTACHMENTS BY CONTRACTOR EQ. TREADS SEE PLAN #3 x STAIR WIDTH `l �0 =.J. SEE PLAN FOR DIM #4 @ 12” O.C. 2' -0" 0 I N l --� N- #3 @ 12 O.C. J EA, WAY �. COMPACTED OR GRANULAR FILL — #3 @ 12" O.C. #3 @ 12" O.C. A r WALL SEE PLAN A SIMILAR B SIMILAR PERIMETER COLUMN FLOOR SLAB �lmill v1 Ti 1 6 "t FOOTING rrA" SEE PLAN FOR WALL CONSTRUCTION CONC. FLOOR SLAB T /SLAB EL..�. X X 'ter SEE PLAN RECESS SLAB INTO BRICK LEDGE CAVITY, LOCATE JOIST @ CENTER OF THRESHOLD. SEE PLAN FOR WALL SECTIONS SCALE: 1/2" = 1' - 0" CONCO061 A 6' -4" NEW 11" BRICK LEDGE 3 Pr C4 EMBEDDED IN BLOCK r TO FOOTING T E SEE CIVIL FOR 1. I I 82' -0 I RFT_ WAI I I �- FACE OF BRICK FOUNDATION NOTES: 1 • UNCONTROLLED FILL EXISTS IN SEVERAL AREAS AT THIS SITE BELOW EXISTING GRADE, SEE 5/S301 FOR FOOTING ON UNSUITABLE SOIL. 2. ELEVATIONS: T /WALL FTG.= +87' -0" UNO. T /COL FTG.= +87' -4" UNO, T /CONCRETE WALL = +99' -7" UNO. T /CMU WALL = +99' -2" UNO. (SEE S201) T /SLAB BASEMENT FLOOR= +88' -0" UNO. T /SLAB FIRST FLOOR= +100' -0" UNO (SEE CIVIL FOR ACTUAL) 3. SLAB ON GRADE: TYPICAL: 4" WITH EITHER 6x6xW1.4xW1.4 WWF, OR FIBERMESH (1 -1/2 LB /CUYD) THICKENED: 6" WITH 6x6xW2.9xW2.9 WWF ALL SLABS ON 6" DRAINABLE COMPACTED FILL ON 6 MIL VAPOR BARRIER. 4. CMU WALLS ARE REINFORCED AS FOLLOWS: 8" NORMAL WEIGHT WITH #5 BARS @ 40" O/C IN GROUTED CELLS (16" O.C. ABOVE LINTELS) 12" NORMAL WEIGHT WITH (2) #6 BARS @ 40" 0/C IN GROUTED CELLS. 5. SJ - SAW CUT JOINT CJ - CONSTRUCTION JOINT CONTRACTOR MAY RECONFIGURE CONSTRUCTION JOINT LOCATIONS AS REQ'D FOUNDATION /SLAB PLAN SCALE: 1/81, = 1' -0" COLUMN SCHEDULE MARK SIZE BASE PLATE Cl TS6x6x1 /4 3/4 "OON10 ", (4) 3/4" A36 A.B.'S C2 TS6x6x3 /8 3/4 "x10 %10 ", (4) 3/4" A36 A.B.'S C3 TS4x4x3/16 5/8"6%11", (4) 3/4" A36 A.B.'S C4 TS5x4x3/16 OR R3(4) x3 /4"x4 "'. EMBED /EPO Y6 ANCHORS 0 0 0 0 C1, C2 1112" TYP. 0 1112" TYP. n C3 ASE PLATES 1 112" TYP, C4 NORTH T /EXISTTNG BRICK LEDGE EL= 87' -4" 1 1.3 2 2.7 3 3.3 4 5 FOUNDATION SCHEDULE MARK SIZE (L x W x D) REINFORCING REMARKS 5.5 5'- 6 "x5'- 6 "x1' -2" (6) #5 EW BOTTOM 6.5 6'- 6 "x6'- 6 "x1' -4" (6) #6 EW BOTTOM WF2.25 CONT.x2'- 3"x1' -0" (3) #5 CONT. BOTTOM WF4.0 CONT.x4'- 0 "x1' -2" (4) #5 CONT. BOTTOM #5 @16" 0/C LATERAL CENTERED IN FTG FOUNDATION DESIGN INFORMATION: NET ALLOWABLE SOIL BEARING PRESSURE = 3,000 PSF PER SOILS REPORT PREPARED BY: EARTH EXPLORATION, DESIGNATED REPORT #1-5752, DATED: 11/15/1999 INC.