Loading...
HomeMy WebLinkAboutSwiezey Remodel Floor Plan 3TYP'IC AL FRAME ROOF: SHINGLES AS SPECIFIED 7/16" ROOFING SHEATHING 2x8 RI DOEBOARU 2x6 RAFTERS 16" o.c. OR AS REO'D FOR SPAN 2X4 COLLAR TIES rJ 48" o.c. 2XC, CEILIJ JOISTS (d� 16" o.c. OR AS REO'D FOR SPAN w/ 2 >,4 RIBBON TIE R38 BATT INSUL. 6 PAIL POLY V.B. 1l2" DRYWALL TAPED & SANDED TYPICAL 2X4 SIDING EXTERIOR COMPOSITION SIDING 7116 " WALL SHEATHING 2x4 STUDS C� 16" o.c. F'v BATT INSULATION 6 IAIL POLY V.B. 1/2" DRYWALL TAPED AND SANDED PROVIDE 1 " AIR GAP OR HOUSE WRAP AT ALL EXTERIOR WALL SURFACES TYP1,­ AL 2X4 BRICK EXTERIOR WALL: BRICK VENEER 7 GAUGE CORRUGATED GALVANIZED METAL BRICK TIES AIR SPACE 1// 2" INSUL. SHEATHING 2x4 STUDS a 16" c.c. R13 BATT INSULATION 6 MIL POLY V.B. 1/2" DRYWALL TAPED AND SANDED il'PIC_' AL SILL A. ,: � AIBLY: DIA. ANCHOR B01_T C 72" 2x4 PRESSURE TRFA.TED ;ILL. PLATE 1/4" SILL GA:�KE F WEEP HOLES yT SECOND COURSE OF BRICK MAX. SPAC IN OF 33„ METAL FLASHING FROM TOP OF CONC. WALL ROLL OVER BRICK LEDGE UNBALANCED BACKFILL HT. NOT TO EXCEED T'TFIC AL 10" B A. [VIENT WAI -L 1/" DRYWALL 6 m, POLY r ,P J Y B !\RRIER 2" x 4" S l JDS Q) 24" o.c. BATT ITSULATIOrJ 10 ONCRETE FOUNDATION WALL e ASPHALT DA[APF'ROOFING �Ico TYPICAL WALL SECTION DETAIL: EXISTING BEDROOM 6' -O" -------------------- - - - - -- q■ EXISTING BEDROOM t0 2' -6" 11 II 11 II II II I II II II II II II II II II II II II I� II 11 II II II II II II 11 II II II II II II II EXISTING WINDOW i i EX STING WINDOW I I III I I EXISTING `- I BATH J o 0 3' -l" Ile 04 3'4�2° II' -1011 3' -I " 04854 -4854 NEW WINDOW NEW WINDOW Orono -' 6' -D" R— VALUES: 6 S -8° 0 O LINEN 4' -I�" -O" LON 3' -3" SLOPE I�' -6i�° CLG. INSULATION R —.38 I 1 I 1 I 1 1/2" DRYWALL $' R —.45 BEAM INSIDE AIR FILM O TEMPR'D R —.68 v i 2X4 STUD WALL W/ BATT R —.13 I 1/2" HIGH R INSUL SHEATHING R -4.6 N - OUTSIDE AIR FILM �ry R —.17 I 1/2" COMPOSITION SIDING R —.1.05 I I TOTAL R —VALUE I I R— .19.95 z R— VALUES: N 1 I I I 1/2" DRYWALL I R —.45 L-- -- - - -- 8' 0' CLG. LINE I INSIDE AIR FILM I R —.68 1-4" w I 2X4 STUD WALL W/ BATT R -13 I I 1/2" HIGH R INSUL SHEATHING R -4.6 I OUTSIDE AIR FILM I R —.17 I I 3/4" AIR SPACE I R -1.0 1 I 4" BRICK VENEER I R —.8 1 I TOTAL R —VALUE R -20.7 �Ico TYPICAL WALL SECTION DETAIL: EXISTING BEDROOM 6' -O" -------------------- - - - - -- q■ EXISTING BEDROOM t0 2' -6" 11 II 11 II II II I II II II II II II II II II II II II I� II 11 II II II II II II 11 II II II II II II II EXISTING WINDOW i i EX STING WINDOW I I III I I EXISTING `- I BATH J o 0 3' -l" Ile 04 3'4�2° II' -1011 3' -I " 04854 -4854 NEW WINDOW NEW WINDOW Orono -' 6' -D" ro 6 S -8° 0 O LINEN 4' -I�" -O" LON 3' -3" SLOPE I�' -6i�° u ° S �q I 1 I 1 I 1 I I $' I CLG, I I BEAM O TEMPR'D DNI Q v i NEW O GLASS I I ° I I I N - O �ry I SITTING ROOM I L I I I I I I I I I I 1 DOOR z I I N 1 I I I I I L-- -- - - -- 8' 0' CLG. LINE I 0 I I 1-4" w I I I x I I I I I I I I I -US-0 te 'i) VAN T T- cf, 4' -2" 3' -3° 2' -2" 2' -6" O 5'-I" O m 2' -2" 9 ctl EXISTING BEDROOM 11 RUBBER MEMBRANE ROOFING S`r'STEM 11 SECOND FLOOR PLAN SCALE: 1/4" = 1' -O" I I 15 I I I I I I I I I I I 1 I 1 I 1 I 1 I I 1 I 1 I I I BEAM DNI Q I I I I I I I I I I I I I L I I I I I I I I I I 1 I I I I I I I I 1 I I I I I I I I I I I I I I I I I I I I I I I I I I I 1 1 I I I 1 1 I 1 NEW 5MOKE DETECTOR ------------------------------- N \ I - - - - -- - - - - - -- ' I 1 I- --- ------------------- I I --- - - - - -- ' — 1 1 I I I I I I I I 1 I I 19'-6" I I I I I I EXISITING ' I I MASTER SUITE I I I I 10' -6" FLAT CL's. I 1 ' � - - -- --------------------- - - - - -- ' SLOPE CLG. \ \\ N --- - - - - -- ------------- -- ------ - - - - -- S' -O" FLAT CLG, \ 1 --- - - - -'' 0 N 2' -6' -------- ----- ------ - - - - -- - - 2' -6' EXISTING FLUSH BEAM CLOSE- RELOCATE DOOR TO SERE STORAGE -- - - - - -- NEW DORMER LC' 2x6 CEILING ,.GISTS -S 16" o.c. O `n NEW JINDOWS C/T 460VE 5' -O" 1 5' -0" 5' -l0" 1 I D -O" FURLINS REQ'D AS NOTED BELOW FURLIN BRACING Q 11' -ro" MAX HORIZONTAL, FURLIN TO BE 2 -2X6, W/ 2X4 VERTICAL SUPPORTS s 48" O.C. s MIN. ANGLE 45 DEGREES DOWN TO BEARING WALL. TYPICAL TRUSS ROOF: SHINGLES AS SPEC'D l!16" ROOFING SHEATHING C/W 'H' CLIPS 2xa BLOCKING AT PEAK PRE - ENGINEERED TRUSSES sD 24" o,c, 2x4 TRUSS BRACING R38 BATT INSULATION 6 MIL POLY V,B, 5/5" CEILING BOARD TAPED a S, PRO` /IDE VENTING g 48" o.c, TYPICAL TYPICAL 2X4 BRICK EXTERIOR L BRICK VENEER -7 GAUGE CORRUGATED GALVANIZED METAL BRICK TIES 1/2" AIR SPACE -1/16" PLYWOOD SHEATHING 2x4 STUDS 9 16" o,c, R13 BATT INSULATION 6 MIL POLY V,B, 1/2" DRYWALL TAPED AND SANDI TYPICAL SILL ASSEMBLY: 1/2" DIA, ANCHOR BOLT w 72" o,c 2x4 PRESSURE TREATED SILL PL, 1/4" SILL GASKET 8" CONCRETE BLOCK FOUNDATION WALL 16" WIDE x 8" DEEP CONCRETE FOOTING c/w 2 - RUNS 15i"f REBAR NOTE: VENTILATE ROOF TO 1 /300TH OF INSULATED CEILING AREA u/s of ceiling O O to of slab top of foundation N to of faotin TYPICAL GARACxE SECTION SCALE: 1 /4" = 1' -0" ------------------ -- - - -- -- - - - - -- -------------------- ------------- - - - - -r ------------------ - - - - -- -- - - - - -- ------ - - - - -2 X 12 BEAM------------ - - - - -� 04854 NEW WINDOW 11 — II I1 � II II � II II 0 5' -2" WALL HT, u I o ' N _ 1 I I ---------------------- ---------------- &' -0" CLG. LINE N z NEW ul EXERCISE ROOM v FLUSH - -- N `p a0 0 BEAM Q NEW SMOKE X U \'o tQ DETECTOR - O 4 - -- - - - - -- --------------------------------------- - - - - -- - - - - -- � 1 ATTIC STORAGE I I Z A'TIC BUILT IN ; ACCESS DRESSERS O 1 ul , U = 1 � 1 NEW D --------- - - - - -- - - -- W.I,C, ------ - - - - -- 8' -O" CLG. LINE I I I I I I I---------- -T---- ----------------- -- - - - --- -- ' � I I I I 8' -O CLG. LINE ; 81 -0" 1 5-T' WALL HT, WALL HT,; - - - - - --- ---- - - - - -- ; I S, 5-2" WALL HT. �ry PLT HT. oo O O cil p - z O U z m PLT HT. III oo lo oo ti z r� w D O i w w uj O �4 O r W O I 0 cn v November 10, 2003 DRAWN B1': R. KRONICK SCALE: AS SHOWN REVISIONS: SKEET: �Iw z v N 0� a0 \'o 0 z Z � a0 L N - on o �� >G z r� w D O i w w uj O �4 O r W O I 0 cn v November 10, 2003 DRAWN B1': R. KRONICK SCALE: AS SHOWN REVISIONS: SKEET: �Iw