HomeMy WebLinkAbout14050141 Correspondence Universiry HighSchool of indiana Mail -Permit excep[ion inquiry S/14�14 112 PM
UNTVERSII'Y
I-II�rI-I S�.I-IQQL Elizabeth Orians <eorians c�i universityhighschool.org>
O i 1 .. D I n N n
Permit exception inquiry
Moses, Dave <dmoses@dhs.in.gov> Mon, Apr 28, 2014 at 4:36 PM
To: Dave Vesper <dvesper@universityhighschool.org>
Cc: "Robison, Bonnie" <brobison@dhs.in.gov>, Elizabeth Orians <eorians@universityhighschool.org>, Stacey Summitt-
Mann <ssummittmann@universityhighschool.org>
Dave, the proposed work will not require filing with the State for design release requirements per the General
Administrative Rules.
You may still be required to obtain local permits.
Thanl<s
Dave Moses CPE, CBI
Assistant Director of Plan Review
Indiana Department of Homeland Security
Division of Fire and Building Safety
317-232-1426
Beginning March 2, 2013 we will no longer accept appiications for standard or partial filings that do not
include our new application documents approved for use in 2013. A copy can be obtained at our website at
the following link: http://www.in.gov/dhs/3681.htm. The Appiication for Storage Facilities for Flammable
and Combustible Liquidsand Gases has also been revised and approved for use in 2013. A copy can be
obtained at our website at the following link: http://www.in.gov/dhs/3712.htm
From: Dave Vesper [mailto:dvesper@universityhighschool.org]
Sent: Monday, April 28, 2014 11:25 AM
h[tpsi/maiLgooglamm�mail/u/0/?ui=2&ik=6e5cb84806&view=p[&q=._search=query&msg=145aa236ab43ic46&dsqt=l&sim1=145aa236ab437c46 Page l of 2
EllzabethOrians �Y�IB�Jpf+T�,Eq1�1�9O�:B01FB@�s1�e�JAQpYJHM�mec4:29:6dA9:Ak:5@�52
Universiry High School of Indiana Mail-Permit exception inquiry 5/14/14 1:12 PM
To: Moses, Dave
Cc: Robison, Bonnie; Elizabeth Orians; Stacey Summitt-Mann
Subject: Permit exception inquiry
Mr. Moses:
I am writing to inquire if a planned structure at University High School is except from the design release requirement.
675 IAC 12-6-4 sec 4(a)(6)(c) lists 'personnel shelters' under 500 sq ft, such as gazebos and picnic shelters, as
exempt for design release. We are planning a structure on the campus grounds whose design is a 320 sq ft picnic
shelter (roof, open on all four sides, no power or HVAC). Students will be using it for studying, as an outdoor
classroom. I believe this is exempt as a personnel shelter, but I wanted to verify.
Is this planned structure exempt from design release? Is there any additional information you need to address this?
Thank you in advance,
Dave Vesper
Dave Vesper
Asst Head of School
(317)733-4475 x128
Elizabetn Orians Wednesday,May 14,2014 1:1220 PM Eastem Dayligh�Tme c42c:03:OC:ae:52
https:/lmail.google.com�mail/u/0/?ui=2&ik=6e5c684806&view=pt&q=..sear<h=query&msg=145aa236ab437c4b&dsqt=l&simI=145aa236ab437c4b Page 2 of 2
Elizabeih Orians Tuestlay,May 20,2014 155:06 PM Eastern Daylight Time c42c�.03:OC.ae:52