HomeMy WebLinkAbout14050187 Correspondence CUSTORAL�B�I0�1�:
d�sign-plan-Fuild�
Specifications to Project
2/26/14
Prepared For:
Brauer Residence
Carmel, IN
General Project Description:
• Remodel the kitchen, and rear entry as follows
CUSTOM ����f��C
disign-plan-Foi1A�
SITE PREPARP;TION
• Owner is responsible to have all personal belongings removed from the areas of
construction prior to the start of work
• Owner understands that during construction of home there will be more dust and
particuiates ventilating through home and Custom Living can at an additional
charge have ductwork cleaned prior to completion of project
• All materials provided by homeowner need to be on-site prior to the start of
construction to ensure there are no dela s in construction
R'OUGM CARPE'NTRY
• Plastic off dining room, living room, and sunroom
• Cover hardwoods with cardboard
• Demo all cabinets and countertops
• Remove the drywall on the walls and ceiling of the kitchen
• Move all appliances to garage
• Remove wall and closets of non load bearing walls between kitchen and family
room
o Owners understand that if the walls are bearing there will be an additional
cost for engineering and carpentry labor/material
o Electrician will disconnect electric
• Remove the non load bearing walls to the rear entry
o Non bearing header for doorway will be a flush beam
• All other doorways will stay the same
• Hardwood in the kitchen will stay
• Remove shoe molding and flooring in rear entry and '/� bathroom
MASONRY
• There is no mason work in this sco e of work
PL3l1MBING
• Disconnect and cap the existing plumbing lines for the kitchen sink and
refrigerator prior to demolition
• Area below kitchen is unfinished
• Instail (1) kitchen sink, (1) faucet, (1) garbage disposal, (1) dishwasher line
o Customer will provide all fixtures
o Dishwasher, sink and refrigerator will stay in the same location
• Install in wall valve shutoff for refrigerator
• Remove and re-install toilet in '/ bathroom for hardwood install
ELECTRlC
• Disconnect all electric during demolition for new opening
• Relocate switches to family room for walls being removed
• Install (2) in cabinet LED puck lights and (2) under cabinet puck iights for butiers
pantry cabinet
o Puck lights will be on a switch and will be dimmabte
• Install (3) can lights as shown on prints in family room
• Install (3) pendant lights as shown on prints
o Switch for sink will be separate from island pendants
• Install 2 outlets on the island cooktop island
• Install dedicated line for double oven on new wall
2 ]nitials
CUSTOM ���Of���
d w��;�-�i.,�-n��m�
• Install dedicated line for the garbage disposal on a switch
• Add a dedicated line for the new microwave location
• Install all new switch plate covers, and devices for kitchen
• Install hardwired electrical in house to code
HVAC
• Install downdraft vent through the unfinished basement to the backyard for the
cooktop
• Move vent to the upstairs in the wall being removed
• Relocate cool air retum in closet being removed between the kitchen and family
room
� R ALL
• Drywall patch all areas from demolition, beam installation, cabinetry removal and
installation, and electrical relocations
• Drywall ceilings necessary from demolition and match texture
• Subfloor will be scraped and swept daily
• Include a d wail atch followin cabinet, and counterto installation
RIM C` RPEMTRY
• Install all cabinets, toe kick moldings, pantry shelving, and crown moldings as
shown on cabinetry plans
• Install new shoe molding in the kitchen, entry, and dining room
• Install new baseboard to match in the kitchen
FLOOR4NG
• Install hardwoods to match the kitchen from the existing point off the entry to the
sunroom wall roughly
• Install hardwoods with a header in the rear hallway
• Refinish all hardwoods following installation
o Kitchen, nook in sunroom, rear
• Homeowner's understand that he hardwood floors wili need to be brought into
the home for approximately 48 hours prior to the installation of the wood and we
will need a designated location to set the materials outside of the construction
areas
• Homeowner's understand that during flooring refinish they will not be able to
sleep in the house for roughly 5 days
O tional ricin to remove tile and install travertine in the ent wa
COUNTERTOPS
• Install granite countertops on all kitchen cabinets
• Allowance is for a level 1 granite with a standard edge profile with a 4"
backsplash
• Owners understand that there will be a delay of up to two weeks from the granite
template to installation
o During that delay there may not be work being done in the home
o Final paint and drywall touchups wili take place following countertop
installation to avoid extra costs in tri char es for d all re airs
PAINT
• Sand/putty/caulk all existing and new trim prior to painting in the kitchen and
family room
3 Initials
CUSTOML�0�/0(��:
a��K„-�i:,�-n�n<��
o The sanding will be over the entire surface area to remove any debris
from construction prior to painting
• Prime and paint ceilings in the kitchen and family room
• Prime all wails in the kitchen and family room with a tinted primer prior to drywall
touchups
• Paint one coat of semi-gloss paint on all the new trim in the kitchen and family
room
• Provide final drywall and paint touchup following cabinet and countertop
installation
• Paint will be included in estimate
ASTE MANAGEMEfVT & GLEANUP
• Scavenger service is included to remove Custom Living's debris for its work
under this contract. Any additional scavenger pick-up by ciient for non-related
debris will be charged to Homeowner. Custom Living is to remove all related
debris from 'ob site upon com letion
PERMIT FEES
• Custom Living assumes the responsibility to submit and receive appropriate
permits for ro'ect.
G'ENERAL CONDITIONS
• These specifications are supplementary to our architectural plans, with the
approval of those pians taking precedence
• Final selections, plans, and walkthrough will confirm estimated pricing prior the
start of construction
� The Buyer represents and warrants that they are the owner of the premises to be
improved and have the right to improve the same
• All change orders will need to be in writing and paid for in full to avoid delays in
construction. There is also an understanding that change orders will delay the
overall completion date of the project
4 Initials