HomeMy WebLinkAbout05-28-2014 Revisions pg 2SOIL AND WASTE PIPE SHALL SLOPE 2% MINIMUM, UNLESS OTHERWISE NOTED OR REQUIRED BY CODE
2. ALL DRAWN WATER & GAS LINES SHALL BE KEPT TIGHT TO THE UNDERSIDE OF EQUIPMENT & SECURED IN
PLACE.
3. VERIFY THE LOCATION OF THE EXISTING SANITARY SEWER ON THE EXISTING SITE/ BUILDING PLANS AND IN FILED
PRIOR TO BID SUBMISSION, REVISE THE SANITARY & GREASE SEWER SYSTEM AS REQUIRED.
4. PROVIDE TRAP PRIMERS FOR NEW FLOOR DRAINS INDICATED, WHERE REQUIRED BY CODES. PROVIDE DEEP
SEAL TRAPS FOR FLOOR DRAINS WITHOUT TRAP PRIMERS.
5. ALL CLEANOUTS SHALL BE INSTALLED WHERE READILY ACCESSIBLE. THE CONTRACTOR SHALL COORDINATE ALL
CLEANOUT LOCATIONS WITH EQUIPMENT, CABINETS, ETC. AND THE OWNERS REPRESENTATIVE PRIOR TO ANY
INSTALLATION.
6. ALL VALVES, TRAP PRIMERS, WATER HAMMER ARRESTORS OR OTHER EQUIPMENT SHOWN IN WALLS OR ABOVE
NON - ACCESSIBLE CEILING SHALL BE INSTALLED BEHIND AN ACCESS PANEL.
7. ALL PLUMBING FIXTURE VENTS SHALL TERMINATE A MINIMUM OF 12 INCHES FROM ANY VERTICAL SURFACE AND
10 FEET FROM ANY OUTSIDE AIR INTAKE.
8. PROVIDE GAS PIPING TO NEW EQUIPMENT AND ALL FINAL CONNECTIONS REQUIRED FOR OPERATION,
9. INSTALL SHUT -OFF VALVES ON ALL HOT & COLD WATER LINES TO FIXTURE OR APPLIANCE. ALL EXPOSED WATER
AND WASTE LINES TO BE CHROME PLATED.
10. PROVIDE A LEVER HANDLE GAS SHUT -OFF VALVE IN THE BRANCH PIPING OF EACH APPLIANCE OR PIECE OF
EQUIPMENT, FOR EACH APPLIANCE INSTALL QUICK DISCONNECT, FLEXIBLE PIPE WHEN ALLOWED BY CODE AND
RESTRAINING DEVICE FURNISHED BY OWNER, PROVIDE PRESSURE REDUCING VALVES AT EACH PIECE OF
EQUIPMENT OR APPLIANCE. IF GAS PRESSURE GREATER THAN 107wc IS USED DOWNSTREAM FROM THE GAS
METER.
11. ALL VALVES, UNIONS, ETC. SHALL BE SAME SIZE AS PIPE UNLESS OTHERWISE INDICATED ON DRAWINGS.
12. REFER TO KITCHEN EQUIPMENT DRAWINGS FOR PLUMBING ROUGH -IN SCHEDULE & FOR ADDITIONAL WORK TO
BE FURNISHED & INSTALLED BY CONTRACTOR. ALL ROUGH -IN PLUMBING AND FINAL CONNECTIONS TO KITCHEN
EQUIPMENT SHALL BE MADE BY THE CONTRACTOR U.O.N.
13. REFER TO MECHANICAL SHEETS FOR HVAC AND HOOD PLUMBING REQUIREMENTS.
14. ALL GAS LINES SHALL BE SUPPORTED SEE SPECS.
15. ALL FLOOR SINKS AND FLOOR DRAINS IN TRAFFIC AREAS SHALL BE INSTALLED FLUSH TO FLOOR SURFACE.
16. PROVIDE WATER HAMMER/ SHOCK ARRESTOR FOR ALL HAND SINKS AND WATER LINES.
17. PROVIDE AIR GAPS FOR INDIRECT DRAINS AS REQUIRED BY CODE. AIR GAP SHALL BE MINIMUM 2 TIMES THE
DIAMETER OF THE INDIRECT DRAIN.
18. PRIOR TO COMMENCING WORK ON THIS PROJECT, VERIFY DEPTH, SIZE, LOCATION AND CONDITION OF ALL
EXISTING UTILITIES IN FIELD. SHOULD CONDITIONS EXIST OTHER THAN THOSE INDICATED WHICH WOULD CAUSE
THE DESIGN TO BE ALTERED, CONTRACTOR SHALL NOTIFY OWNER IMMEDIATELY.
19. COORDINATE INSTALLATION OF PLUMBING WORK WITH ALL OTHER TRADES SO AS TO AVOID UNNECESSARY
DELAY OR INTERFERENCES. CONTRACTOR SHALL REVIEW ARCHITECTURAL AND EQUIPMENT SHEETS.
20. FURNISH & INSTALL ALL BACKFLOW PROTECTION DEVICES REQUIRED BY AGENCIES HAVING JURISDICTION.
BACKFLOW DEVICES REQUIRING TESTING SHALL BE INSTALLED NO HIGHER THAN S -0" A.F.F. EXISTING EUIPMENT
TO REMAIN.
21. PROVIDE CONDENSATE DRAIN FROM COOLER/ FREEZER TO APPROVED DRAIN,
22. THE OWNER OR KITCHEN EQUIPMENT SUPPLIER MAY SUBSTITUTE EQUIPMENT OR THE EQUIPMENT MAY VARY
FROM WHAT IS SHOWN, THEREFORE, VERIFY ALL CRITICAL DIMENSIONS WITH THE OWNER PRIOR TO
CONSTRUCTION. FAILURE OF THE CONTRACTOR TO VERIFY THESE DIMENSIONS SHALL PLACE THE RESPONSIBILITY
FOR ANY SUBSEQUENT RELOCATION DIRECTLY UPON THE CONTRACTOR,
23. ALL WATER LINES SHALL BE RUN OVERHEAD U.O.N.
24. ALL WATER LINES SHALL BE FLUSHED PRIOR TO CONNECTING ANY FIXTURES OR EQUIPMENT.
25. PROVIDE ESCUTCHEON PLATES AND SILICONE SEALANT AT ALL UTILITY PENETRATIONS INTO WALLS, CEILINGS,
AND FLOORS. DO NOT USE CAULKS OR EXPANDING FOAMS FOR SEALANT.
26. CVPVC SCHEDULE 40 WASTE PIPE CAN BE SUBSTITUTED FOR BLACK IRON WASTE PIPE WHERE ALLOWED BY
LOCAL MUNICIPALITIES.
GENERAL NOTES I D
ARCHITECTURE
CONSTRUCTION MANAGEMENT
DEVELOPMENT
THE
D 7'�
DESIGN GROUP
1104 S. MITCHELL ST.
CADILLAC, MICHIGAN 49601
(231) 779 -4002
(231) 779 -4022 FAX
WT
DEVELOPMENT
CORPORATION
WT Deve ®iIn1Z rporation
10223 E. Cherry Bend Rd., Ste. A
Traverse City, Michigan, 49684
Contact: Bill Beckett, President
Phone: (231) 922 -9250
Fax: (231) 922.9257
PROJECT CONSULTANT
08��'
m
WAM0600064 0
STATE OF
10 0G�O000, ® ® ®_ 512811
� 8ou
02.11.14
Landlord Review
A04.09.14
WALL SIGN REVISIONS
A04,25.14
FOR PERMITS & BIDS
A05.06.14
TENANT SEPARATION
' 4 05.13.14
BLAZE REVISION
TOTAL
H.W.
WATER CLOSET
STORE NUMBER: 10
BLAZE PIZZA
Carmel Corners
Meijer Outlot'B'
12697 N. Pennsylvania St.
Carmel, IN 46032
FIXTURE
NO.
DRAIN
COLD WATER
HOT WATER
D.F.U.
TOTAL
D.F.U.
F.U.
C.W.
TOTAL
C.W.
F.U.
H.W.
TOTAL
H.W.
WATER CLOSET
2
4
8
2
4
URINAL
LAVATORY
2
1
2
2
4
2
4
HAND SINK
2
2
4
2
4
2
4
PREP SINK *
1
1
1
2
2
2
2
3- COMPARTMENT SINK * (GREASE WASTE)
1
1
1
3
3
3
3
HOSE BIBB/WATER FILTRATION UNIT
FLOOR DRAIN
8
2
16
--
--
-
DISHWASHER
1
2
2
-
-
2.25
2.25
FLOOR SINK
3
6
18
--
--
--
--
MOP SINK
1
3
3
2.25
2.25
2.25
2.25
TOTAL
-
-
47
19.25
17.50
PROBABLE DEMANDS/
AND PIPE SIZING
REQUIREMENTS:
COLD WATER:
19.25 FU = 15 GPM
DRAIN: GW
3 DFU
DRAIN: SAN
44 DFU
HOT WATER:
17.5 x 3/4 =13 GPM
USE 1 -112" CW SERVICE
USE 4" SANITARY (MIN)
USE 4" SANITARY (MIN)
USE 1 -1/ 4" HW SERVICE (MIN)
BASED ON 2009 IPC (COMBINATION DRAIN & VENT). *FIXTURE HAS INDIRECT WASTE TO FLOOR SINK
FIXTURE UNITS SCHEDULE I G
PLUMBING
SCHEDULES
P1.0
PROJECT NUMBER: 14106a