Loading...
HomeMy WebLinkAbout060-00 C114 Entrance Planz O F— Q z z O U O LL. L0 U F-- L1J W Ld LJ M R/W LINE 50' HALF OF RIGHT -OF -WAY 24' VARIES NEW PAVEMENT SAW CUT EDGE OF EXISTING PAVEMENT 3• TO FORM A NEAT JOINT STONE FT. MW SHOULDER SLOPE° /. .. _ PER E DITCH 6" •53 ST( ' /_" PER FT. NT — CENTERLINE OLD MERIDIAN STREET EXISTING PAVEMENT 1" H.A.C. SURFACE •11 OR •12 —3" H.A.C. BINDER 09 --8" 050 BASE OVER PREPARED SUBGRADE o PREPARED SUBGRADE PER INDIANA DEPARTMENT OF TRANSPORTATION SPECS SECTION No. 207 _SECTIQN ''A-A'-'-- LEGEND EXISTING PROPOSED MANHOLE • CURB INLET ■ BEEHIVE INLET FLOW ARROW CONTOUR SPOT ELEVATION 846.6 SWALE - ... -- UNDERDRAIN — — — — TOP OF CASTING T 846.0 TREE LINE -- -- - -- - 1 - - BURIED TELEPHONE LINE OVERHEAD ELECTRIC LINE X - - -- FENCE LINE POWER POLE TELEPHONE JUNCTION BOX DECIDUOUS TREE NEW PAVEMENT WITHIN R.O.W. OF OLD MERIDIAN STREET MANHOLE TO BE CONSTRUCTED "DON'T DIG BAND" 4► oe 1- 804 -382 -5544 CALL BEFORE YOU DIG GENERAL NOTES: 1. M. E. - indicates match existing spot elevation; contractor shall match existing grade at that point. See note 8 on this sheet for more information. 2. Where M.E. (match existing) is indicated on the construction plans, field observations should be made to assure positive drainage. 3. Excess dirt to be stockpiled in areas as designated by the developer. 4. Do not scale from these plans for survey field locations. 5. Check the benchmark with existing grades and existing topography before beginning construction. Any discrepancies must be reported to the engineer immediately. G. Before any eorthwork is performed, the contractor is responsible for locating all existing utilities within, or bordering, the project. 7. A preconstruction meeting should be conducted to establish construction limits to maintain the integrity of the project throughout the construction phases. T y a C3 3 C Q D D z Q z O C U.1 75 Z W S 0 J T OW C/) Q� W p.. U Z W O w V Z Q 1- Z W 7 o U) ILL z ui coo M T).�� c �n c a 5, cc» o- c � a> c CL m o CO�7o � N co o L mz CL L W m cY) c Cl- IL Cr DATE: MRCH 08, 2000 SCALE: 1" = 30' PROJECT NO. 111 -1150 SHEET NO. C114 1150ENT1.DGN