Loading...
HomeMy WebLinkAboutFloor Plan New Worki � z � H ❑ EXISTING PLATFORM /- 3 O❑ - ------ I- - -- ------ - I- � 7— I) I , H I ' I I I I 3 ;]F E I H � -- - - -- - - - - -❑ - - - - - --- --- /\ - - - - - - ' I ❑ o 0 0 I I I I I � SCI SORS Fi 2 RAMP UP +24" 108 � s +0" UPS ROOM 5 108E 0 LOADING DOCK +I 103 EXISTING H. R. -� A?8 108C ° C108DT ELECTRICCBAL ROOM ; +24" 2 I 1n s 107 z ° s �O Q:, O w 2 5" 4' -p" im� A -8 CORRIDOR 1088 LE 1161 CRAC 1 FE UNIT F1 48' -2" I Li --I=- 11 O CRAC � UNIT O I CRAC UNIT I I -- CRAC ~ PDU UNIT z o > > Al ❑ Q :5 < �w I PDU ET' B1 O v� Q � L' - CRAC fl UNIT I I � I =�- CRAC UNIT i CRAC UNIT I CRAC UNIT +18" RAMP +24" 111 DOWN 22' -3" ' I 8 g 10 77'47Y" PDU A2 CO -LO 108 PDU B2 I,— 100 FE i s F3 \ -A A-5 CORRIDOR 18' -0" 108A INSTALL NEW GLASS FRAME TO MATCH EXISTING. SEE ELEVATION A /A -8. 2 PDU A3 PDU 33 FA 102 44" 5 2 5 s 109 s I r\ 27'-l"± UPS ROOM 6 1 88G 5 -C2 I CORRIDOR 108H r. 2 m K i 0 I I II 7' -5Y" 2 5" I m FE 1 r1 I �1 I 1 O -- � -- RAMP -- — - - - - -- DOWN H.R. "' I d- 5 �- 1I. 4'410" 0 I i� N +0" KEYED NOTES: (THIS DRAWING OO PATCH, PRIME AND PAINT TO MATCH ADJACENT CONSTRUCTION. 02 NEW CONCRETE SLAB LEVEL WITH EXISTING FLOOR, SEE PLAN BIDDING AND AND DETAILS ON A -7. - 03 INFILL EXISTING WALL WITH BLOCK TO MATCH EXISTING WALL Q12 CONSTRUCTION. PRIME AND PAINT OUTSIDE TO MATCH EXISTING ADDENDUM 1 CONDITIONS. 04 INFILL EXISTING WALL WITH BLOCK TO MATCH EXISTING WALL CONSTRUCTION WHERE EXHAUST LOUVER WAS REMOVED. PRIME AND ELECTRICAL AND PAINT BOTH SIDES OF WALL TO MATCH EXISTING CONDITIONS. ONEW HOUSEKEEPING PAD - COORDINATE LOCATION WITH DIVISION 16. Q4 SEE DETAIL ON DRAWING A -7. OWHET E EXISTING DOOR WAS REMOVED, INFILL OPENING TO MATCH EXISTING CONSTRUCTION. PRIME AND PAINT BOTH SIDES OF WALL TO MATCH ADJACENT CONSTRUCTION. OEXISTING CONCRETE PAD TO REMAIN. 08 PATCH, PRIME AND PAINT EXISTING WALLS TO MATCH ADJACENT CONSTRUCTION. COORDINATE WITH DIVISION 15 & 16. OLINTEL L1 - W8x18 W /Ya x11Y2° BOT. PL. (GALV.). BRG. PL.Y2'x7 x7 EACH END. PROVIDE MIN. 16" DEEP x16 "x12" SOLID MASONRY BEARING PAD AT BRG. PL. PROVIDE (2) % "x8" LONG ANCHOR BOLTS W /3" HOOK l SYMBOLS: I C - aNID)CATES SIGNAGE SEE DETAIL 1/A -5. 0 S • FE - INDICATES FIRE EXTINGUISHER. — X❑ - INDICATES WALL TYPE. SEE DRAWING A -5. - INDICATES DOOR TYPE. SEE DRAWING A -5. -- - - - - - -❑B, FA4 1 i O. � LB I ip d- S� p r/j�fa1 l� a'w d �® ` l D0/e�� iray1, /o (:/ vJ I❑ ❑I ❑ ° +24 RAMP 1 O 101 0 39' -3y" DOWN ±0» 5 °s 2' -11 Lo _ 1 MULLION ( ORK PT.) I , 11 12) FLOOR PLAN — NEW WORK SCALE: 1/8" = 1' -0" KEY PLAN 0 BUILDING NORTH N W= a Wm m o O N r- i r r O CC 'j 0 :NT CD T 0 °cnn0- u- j 4ftj• v SEAL .% ) ..'61s ,S.` •r iy CS. C •• e 1.r 606 s • • € '0 E OF dry ! eta o +O ciA I� 1 O W o°� w DU U O !y Ir' NO. DATE REVISION o 11-21 -13 BIDDING AND CONSTRUCTION Q12 -11-13 ADDENDUM 1 GENERAL ARCH. AND ELECTRICAL Q2 -12 -14 ADDENDUM 2 Q4 -29 -14 DATA ROOM DOOR CHANGE PROJECT NUMBER: 20120149.2 PROJECT DATE: 2 -15 -13 DRAWN BY: RWR CHECKED BY: GEJ SCALE: AS NOTED DRAWING TITLE FLOOR PLAN NEW WORK DRAWING NUMBER A -2