HomeMy WebLinkAboutGrading and Drainage Plan.. Y GRADING PLAN NOTES 1. EXISTING UTILITY LOCATIONS ARE APPROXIMATE. THE CONTRACTOR SHALL DETERMINE AND FIELD VERIFY ALL HORIZONTAL AND VERTICAL LOCATIONS PRIOR TO COMMENCEMENT OF CONSTRUCTION. 2. TOPOGRAPHIC AND PLANIMETRIC INFORMATION FROM PHOTOGRAPHIC COMPILATION HAS BEEN PROVIDED BY OTHERS. THE ACCURACY HAS NOT BEEN CONFIRMED BY CRIPE ARCHITECTS + ENGINEERS. ANY DISCREPANCIES SHALL BE REPORTED TO THE ENGINEER OF RECORD. 3. ALL GRADES AT BOUNDARY SHALL MEET EXISTING GRADES. 4. RIM ELEVATION (RE) SHALL INDICATE THE ELEVATION THAT WATER WOULD ENTER THE GRATE FOR ALL CASTINGS. IF CASTING HAS SOLID LID, THE RE IS THE LID ELEVATION. 5. BUILDING PAD AREAS AND PAVED AREAS DESIGNATED FOR FILL SHALL BE CONSTRUCTED OF SUITABLE FILL MATERIAL AND COMPACTED PER SPECIFICATIONS. ALL FILL AREAS SHALL BE STRIPPED OF TOPSOIL PRIOR TO PLACEMENT OF FILL. 6. ANY EXCESS SOIL MATERIAL SHALL BE EXPORTED FROM THE SITE AFTER CONSTRUCTION IS COMPLETED. 7. TOPSOIL SHALL BE PLACED IN MOUNDING AREAS AND NONSTRUCTURAL FILL AREAS. UPON COMPLETION OF MASS EARTHWORK, TOPSOIL SHALL BE SPREAD TO A DEPTH OF FOUR TO SIX (4 TO 6) INCHES IN AREAS TO BE SEEDED SUCH AS STAGING AREA, GRASS AREAS, AND DISTURBED AREAS OUTSIDE OF BUILDING AND PARKING AREAS. 8. CONTRACTOR SHALL PRESERVE EXISTING TREES WHEREVER POSSIBLE. CLEARING LIMITS SHALL CONSIST OF ALL TREES WITHIN PAVED AREAS, UTILITY INSTALLATION LIMITS, AND CUT /FILL AREAS. 9. A GEOTECHNICAL REPORT HAS NOT BEEN PROVIDED FOR THIS PROJECT. CONTRACTOR TO PERFORM A SITE VISIT PRIOR TO PROJECT BID. THE ENGINEER HAS BASED RECOMMENDATIONS UPON NRCS MAPS AND GENERAL KNOWLEDGE OF SOILS CONDITIONS IN THE AREA. 10. 100 -YEAR FLOODPLAINS, FLOODWAY FRINGES AND FLOODWAYS DO NOT EXIST ON SITE 11. ANY DISCREPANCIES OR CONFLICTS WHICH BECOME APPARENT BEFORE OR DURING CONSTRUCTION SHALL BE BROUGHT TO THE ATTENTION OF THE ENGINEER OF RECORD IMMEDIATELY SO THAT CLARIFICATION OR REDESIGN MAY OCCUR. ao� FLOOD ROUTING FLOOD ROUTING WITH ALL INLETS CLOGGED: FLOOD ROUTING WILL STAGE TO APPROXIMATELY 779 AND FLOOD SWALES UNTIL DISCHARGES TO DRY DETENTION BASIN. 100 YR FLOOD ELEVATION IN BASIN= 774.03 DRAINAGE SUMMARY THE SITE IS MASTER PLANNED FOR A WATERSHED OF 24.6 ACRES ON -SITE AND 124.92 ACRES OFFSITE FROM THE NORTHWEST VIA A CULVERT UNDER HAZEL DELL ROAD AND A SWALE ALONG THE NORTH EDGE OF THE PROPERTY, THE STORMWATER DRAINS TO THE EAST AND NORTHEAST THROUGH A DRY DETENTION BASIN AND OUTLETS THROUGH AN 18" PIPE TO AN EXISTING INLET STRUCTURE IN AN EASEMENT ON THE WESTERN BOUNDARY LINE OF THE ASHMORE TRACE SUBDIVISION. THE PROPOSED IMPROVEMENTS FOR THIS VESTIBULE AND PARKING ADDITION ARE WITHIN THE CONSTRAINTS OF THE APPROVED MASTER PLAN. SITE ACREAGE : 24.6 ACRES OFFSITE ACREAGE : 124.92 ACRES ALLOWABLE RELEASE RATE (100YR) : 193.03 CFS ACTUAL RELEASE RATE (100YR) : 185.13 CFS VOLUME OF DETENTION REQUIRED : 4.39 ACRE -FT WITHOUT OFFSITE 7.77 ACRE -FT WITH OFFSITE VOLUME OF DETENTION PROVIDED : 9.13 ACRE -FT TO ELEVATION 774.22 N 0 25 50 100 12.5 37.5 75 SCALE: 1"=50' ZIP h c GRADING PLAN LEGEND 801 800.00 PROPOSED 1' CONTOUR PROPOSED GRADE A7 �, 19° 1% O{ c-:) N MEG MATCH EXISTING GRADE ^ H Q 7 775 - 9 PROPOSED 5' CONTOUR TC 800.501 PROPOSED TOP OF CURB E�f78.90 - -� o 0 o B 7 7 W 779.25 , EP 800.00 PROPOSED EDGE OF PAVEMENT L PROPOSED SWALE - 5 8' 0 1 PROPOSED SWALE TW 800.5 BW PROPOSED TOP OF WALL DRY DETENTION CROSS SECTION - - �Q_� _ _ - WITH SUB- SURFACE DRAIN 800.0 PROPOSED BOTTOM OF WALL Z� M M FFE= 800.00 FINISHED FLOOR ELEVATION A_A W GRADE BREAK LINE W RE= 778.15 RE= 777.80 RE= 779.05 RE= 778.10 704 703 RE= 800.00 RIM ELEVATION (TVPI�eI � - - CONSTRUCTION LIMITS LINE m _j RE= 778.10 RE= 778.10 GRADING PLAN NOTES 1. EXISTING UTILITY LOCATIONS ARE APPROXIMATE. THE CONTRACTOR SHALL DETERMINE AND FIELD VERIFY ALL HORIZONTAL AND VERTICAL LOCATIONS PRIOR TO COMMENCEMENT OF CONSTRUCTION. 2. TOPOGRAPHIC AND PLANIMETRIC INFORMATION FROM PHOTOGRAPHIC COMPILATION HAS BEEN PROVIDED BY OTHERS. THE ACCURACY HAS NOT BEEN CONFIRMED BY CRIPE ARCHITECTS + ENGINEERS. ANY DISCREPANCIES SHALL BE REPORTED TO THE ENGINEER OF RECORD. 3. ALL GRADES AT BOUNDARY SHALL MEET EXISTING GRADES. 4. RIM ELEVATION (RE) SHALL INDICATE THE ELEVATION THAT WATER WOULD ENTER THE GRATE FOR ALL CASTINGS. IF CASTING HAS SOLID LID, THE RE IS THE LID ELEVATION. 5. BUILDING PAD AREAS AND PAVED AREAS DESIGNATED FOR FILL SHALL BE CONSTRUCTED OF SUITABLE FILL MATERIAL AND COMPACTED PER SPECIFICATIONS. ALL FILL AREAS SHALL BE STRIPPED OF TOPSOIL PRIOR TO PLACEMENT OF FILL. 6. ANY EXCESS SOIL MATERIAL SHALL BE EXPORTED FROM THE SITE AFTER CONSTRUCTION IS COMPLETED. 7. TOPSOIL SHALL BE PLACED IN MOUNDING AREAS AND NONSTRUCTURAL FILL AREAS. UPON COMPLETION OF MASS EARTHWORK, TOPSOIL SHALL BE SPREAD TO A DEPTH OF FOUR TO SIX (4 TO 6) INCHES IN AREAS TO BE SEEDED SUCH AS STAGING AREA, GRASS AREAS, AND DISTURBED AREAS OUTSIDE OF BUILDING AND PARKING AREAS. 8. CONTRACTOR SHALL PRESERVE EXISTING TREES WHEREVER POSSIBLE. CLEARING LIMITS SHALL CONSIST OF ALL TREES WITHIN PAVED AREAS, UTILITY INSTALLATION LIMITS, AND CUT /FILL AREAS. 9. A GEOTECHNICAL REPORT HAS NOT BEEN PROVIDED FOR THIS PROJECT. CONTRACTOR TO PERFORM A SITE VISIT PRIOR TO PROJECT BID. THE ENGINEER HAS BASED RECOMMENDATIONS UPON NRCS MAPS AND GENERAL KNOWLEDGE OF SOILS CONDITIONS IN THE AREA. 10. 100 -YEAR FLOODPLAINS, FLOODWAY FRINGES AND FLOODWAYS DO NOT EXIST ON SITE 11. ANY DISCREPANCIES OR CONFLICTS WHICH BECOME APPARENT BEFORE OR DURING CONSTRUCTION SHALL BE BROUGHT TO THE ATTENTION OF THE ENGINEER OF RECORD IMMEDIATELY SO THAT CLARIFICATION OR REDESIGN MAY OCCUR. ao� FLOOD ROUTING FLOOD ROUTING WITH ALL INLETS CLOGGED: FLOOD ROUTING WILL STAGE TO APPROXIMATELY 779 AND FLOOD SWALES UNTIL DISCHARGES TO DRY DETENTION BASIN. 100 YR FLOOD ELEVATION IN BASIN= 774.03 DRAINAGE SUMMARY THE SITE IS MASTER PLANNED FOR A WATERSHED OF 24.6 ACRES ON -SITE AND 124.92 ACRES OFFSITE FROM THE NORTHWEST VIA A CULVERT UNDER HAZEL DELL ROAD AND A SWALE ALONG THE NORTH EDGE OF THE PROPERTY, THE STORMWATER DRAINS TO THE EAST AND NORTHEAST THROUGH A DRY DETENTION BASIN AND OUTLETS THROUGH AN 18" PIPE TO AN EXISTING INLET STRUCTURE IN AN EASEMENT ON THE WESTERN BOUNDARY LINE OF THE ASHMORE TRACE SUBDIVISION. THE PROPOSED IMPROVEMENTS FOR THIS VESTIBULE AND PARKING ADDITION ARE WITHIN THE CONSTRAINTS OF THE APPROVED MASTER PLAN. SITE ACREAGE : 24.6 ACRES OFFSITE ACREAGE : 124.92 ACRES ALLOWABLE RELEASE RATE (100YR) : 193.03 CFS ACTUAL RELEASE RATE (100YR) : 185.13 CFS VOLUME OF DETENTION REQUIRED : 4.39 ACRE -FT WITHOUT OFFSITE 7.77 ACRE -FT WITH OFFSITE VOLUME OF DETENTION PROVIDED : 9.13 ACRE -FT TO ELEVATION 774.22 N 0 25 50 100 12.5 37.5 75 SCALE: 1"=50' ZIP h c LL, o 77 7 EP .778.4- 51- 7 77 O{ c-:) N g .. ^ H Q 7 775 - 9 776 , p Q '� E�f78.90 C7 B 7 7 W 779.25 , TW 779.2 ., y. , � , L ~�0 - 5 J7 25 SID MINIMUM E YARD / z�� Z Li o`0o w Q U Z� M M 709 708 ,• ° .• ..t-,.sw�x,• ..avx5...aKHfa ✓.+eafu rvYk.,3J' BW 774.50 706 705 §n - '° • •.1' .a a.,.w¢x :aAV C.c x.... <xi;F,,,rA1 ..w.4b.p7yt M L'ufJb'uX:1i &Ja.tPeM,ti €J^k.' Jt,wiy xiw ..f uN .. ., av'= '. _ vX41 [&:'... . ,. W m W RE= 778.15 RE= 777.80 RE= 779.05 RE= 778.10 704 703 U-) Q Q m J m _1 m _j RE= 778.10 RE= 778.10 /a 3 cu a F- W LLI o _c a D 820 O U N Q O N f1 O a = O U O O N a � O� N C � J GRADING PLAN NOTES 1. EXISTING UTILITY LOCATIONS ARE APPROXIMATE. THE CONTRACTOR SHALL DETERMINE AND FIELD VERIFY ALL HORIZONTAL AND VERTICAL LOCATIONS PRIOR TO COMMENCEMENT OF CONSTRUCTION. 2. TOPOGRAPHIC AND PLANIMETRIC INFORMATION FROM PHOTOGRAPHIC COMPILATION HAS BEEN PROVIDED BY OTHERS. THE ACCURACY HAS NOT BEEN CONFIRMED BY CRIPE ARCHITECTS + ENGINEERS. ANY DISCREPANCIES SHALL BE REPORTED TO THE ENGINEER OF RECORD. 3. ALL GRADES AT BOUNDARY SHALL MEET EXISTING GRADES. 4. RIM ELEVATION (RE) SHALL INDICATE THE ELEVATION THAT WATER WOULD ENTER THE GRATE FOR ALL CASTINGS. IF CASTING HAS SOLID LID, THE RE IS THE LID ELEVATION. 5. BUILDING PAD AREAS AND PAVED AREAS DESIGNATED FOR FILL SHALL BE CONSTRUCTED OF SUITABLE FILL MATERIAL AND COMPACTED PER SPECIFICATIONS. ALL FILL AREAS SHALL BE STRIPPED OF TOPSOIL PRIOR TO PLACEMENT OF FILL. 6. ANY EXCESS SOIL MATERIAL SHALL BE EXPORTED FROM THE SITE AFTER CONSTRUCTION IS COMPLETED. 7. TOPSOIL SHALL BE PLACED IN MOUNDING AREAS AND NONSTRUCTURAL FILL AREAS. UPON COMPLETION OF MASS EARTHWORK, TOPSOIL SHALL BE SPREAD TO A DEPTH OF FOUR TO SIX (4 TO 6) INCHES IN AREAS TO BE SEEDED SUCH AS STAGING AREA, GRASS AREAS, AND DISTURBED AREAS OUTSIDE OF BUILDING AND PARKING AREAS. 8. CONTRACTOR SHALL PRESERVE EXISTING TREES WHEREVER POSSIBLE. CLEARING LIMITS SHALL CONSIST OF ALL TREES WITHIN PAVED AREAS, UTILITY INSTALLATION LIMITS, AND CUT /FILL AREAS. 9. A GEOTECHNICAL REPORT HAS NOT BEEN PROVIDED FOR THIS PROJECT. CONTRACTOR TO PERFORM A SITE VISIT PRIOR TO PROJECT BID. THE ENGINEER HAS BASED RECOMMENDATIONS UPON NRCS MAPS AND GENERAL KNOWLEDGE OF SOILS CONDITIONS IN THE AREA. 10. 100 -YEAR FLOODPLAINS, FLOODWAY FRINGES AND FLOODWAYS DO NOT EXIST ON SITE 11. ANY DISCREPANCIES OR CONFLICTS WHICH BECOME APPARENT BEFORE OR DURING CONSTRUCTION SHALL BE BROUGHT TO THE ATTENTION OF THE ENGINEER OF RECORD IMMEDIATELY SO THAT CLARIFICATION OR REDESIGN MAY OCCUR. ao� FLOOD ROUTING FLOOD ROUTING WITH ALL INLETS CLOGGED: FLOOD ROUTING WILL STAGE TO APPROXIMATELY 779 AND FLOOD SWALES UNTIL DISCHARGES TO DRY DETENTION BASIN. 100 YR FLOOD ELEVATION IN BASIN= 774.03 DRAINAGE SUMMARY THE SITE IS MASTER PLANNED FOR A WATERSHED OF 24.6 ACRES ON -SITE AND 124.92 ACRES OFFSITE FROM THE NORTHWEST VIA A CULVERT UNDER HAZEL DELL ROAD AND A SWALE ALONG THE NORTH EDGE OF THE PROPERTY, THE STORMWATER DRAINS TO THE EAST AND NORTHEAST THROUGH A DRY DETENTION BASIN AND OUTLETS THROUGH AN 18" PIPE TO AN EXISTING INLET STRUCTURE IN AN EASEMENT ON THE WESTERN BOUNDARY LINE OF THE ASHMORE TRACE SUBDIVISION. THE PROPOSED IMPROVEMENTS FOR THIS VESTIBULE AND PARKING ADDITION ARE WITHIN THE CONSTRAINTS OF THE APPROVED MASTER PLAN. SITE ACREAGE : 24.6 ACRES OFFSITE ACREAGE : 124.92 ACRES ALLOWABLE RELEASE RATE (100YR) : 193.03 CFS ACTUAL RELEASE RATE (100YR) : 185.13 CFS VOLUME OF DETENTION REQUIRED : 4.39 ACRE -FT WITHOUT OFFSITE 7.77 ACRE -FT WITH OFFSITE VOLUME OF DETENTION PROVIDED : 9.13 ACRE -FT TO ELEVATION 774.22 N 0 25 50 100 12.5 37.5 75 SCALE: 1"=50' ZIP h Dla L E O Z c LL, o z O O{ c-:) N W C ^ H Q U) 0 p Q '� Wrop_-v C7 • - + >>wzxUd > ~ N < �. L ~�0 Z °° ¢� t z�� Z Li o`0o w Q a _ Z� M M Dla L E O Z c = z a. O W U) Q Q C7 _ O F- Z Z °° oz�o� V W Z - J Z� N m W w O U-) Q Q m J m _1 m _j �t�zz 3 cu a F- W LLI o _c a D O U Dla L E O Z Z c = a. O W U) Q M a. _ O �L v Z Z N Q V W Z - J Z� N m W to Q Wz Q m J m _1 m _j Q �n 3 cu a F- W LLI o _c a D Z a. W M a. Z Z � Q V W Z - J Z� N m W - U o o_ Keyplan Drawing Number: C301A ►1 r O N 6 N O L a M � M O CO NZ Lo