EROSION CONTROL LEGEND
TP - TP TREE /SHRUB PRESERVATION AND PROTECTION
SF SILT FENCE BARRIER INSTALLATION
CONSTRUCTION LIMITS
PERMANENT SEEDING WITH TEMPORARY CONSTRUCTION INGREES /EGRESS
EROSION CONTROL BLANKET DRIVE. ONCE CONSTRUCTION IS COMPLETE,
(SC 150) CONTRACTOR SHALL REMOVE STONE, RESPREAD
TOPSOIL, AND SEED ENTIRE AREA.
. . PERMANENT SEEDING
Q INSERT (BAG) INLET PROTECTION
INSERT (BAG) CURB INLET
PROTECTION WITH CURB FILTER
CONCRETE END SECTION RIPRAP
DETAIL (UPPER AND LOWER INV)
GRAVEL DONUT INLET
PROTECTION DETAIL
CONTRACTOR STAGING AREA SHALL UTILIZE
THE EXISTING ASPHALT AREA. CONTRACTOR
SHALL REPAIR ALL DAMAGED ASPHALT
WITHIN THE AREA UPON COMPLETION OF
THE PROJECT AND SHALL MEET THE
STANDARDS AS DICTATED ON DETAILS.
® RECYCLING DUMPSTER
CONCRETE WASHOUT AREA
CD CONSTRUCTION DUMPSTER
ROCK CHECK DAM
EROSION CONTROL PLAN NOTES
1. SEE SHEET C403 FOR SOILS MAP AND SOIL CHARACTERISTICS.
2. SEE SHEET C402 FOR EROSION CONTROL DETAILS.
3. SILT FENCE BARRIER TO BE INSTALLED PRIOR TO CONSTRUCTION.
4. EROSION CONTROL MEASURES TO BE MAINTAINED THROUGHOUT THE ENTIRE CONSTRUCTION PROCESS.
5. SEE EROSION CONTROL SPECIFICATIONS FOR ALL EROSION CONTROL MEASURES, SCHEDULES, AND
SEQUENCES.
6. CONTRACTOR TO PROVIDE A STABLE TEMPORARY GRAVEL CONSTRUCTION ENTRANCE /EXIT CONDITION FROM
THE CONSTRUCTION SITE TO KEEP MUD AND SEDIMENT OFF PUBLIC ROADS.
7. EROSION CONTROL MAINTENANCE - SITE TO BE INSPECTED AT LEAST ONCE A WEEK AND MAKE REPAIRS
IMMEDIATELY AFTER PERIODS OF RAINFALL.
8. STORMWATER DISCHARGE WILL NOT ENTER THE GROUNDWATER FOR THIS PROJECT.
9. THE 100 YEAR FLOODPLAIN FLOODWAYS ARE PRESENT AND LABELED ON THIS SITE.
10. CONTRACTOR SHALL PROVIDE THE OFFICE OF CODE ENFORCEMENT OF THE CITY OF CARMEL WITH A
NARRATIVE DESCRIBING THE CONSTRUCTION SEQUENCE, INCLUDING START DATES FOR EACH LAND
DISTURBING ACTIVITY.
11. THE ACTUAL PERSON RESPONSIBLE FOR THE INSTALLATION AND MAINTENANCE OF THE EROSION CONTROL
SHALL BE DETERMINED DURING THE BIDDING PROCESS. THE AWARD WINNING CONTRACTOR SHALL BE
RESPONSIBLE FOR THE PROPER INSTALLATION AND MAINTENANCE OF ALL EROSION CONTROL MEASURES.
ONCE DETERMINED, CRIPE SHALL COORDINATE WITH THE CITY.
12. ANY DISCREPANCIES OR CONFLICTS WHICH BECOME APPARENT BEFORE OR DURING CONSTRUCTION SHALL
BE BROUGHT TO THE ATTENTION OF THE ENGINEER OF RECORD IMMEDIATELY SO THAT CLARIFICATION OR
REDESIGN MAY OCCUR.
SEDIMENT CONTROL CONTROL 3EOUEWCE AND IMPLEMENTA TION
EROSION AND 3EDIM
- ...
1. INSTALL CONSTRUCTION FENCING AND GATES AS ILLUSTRATED.
2. INSTALL SILT FENCING AS SHOWN (SEE DETAIL ON SHEET C402). DUST SHALL BE KEPT TO A MINIMUM
BY UTILIZING SPRINKLING, CALCIUM CHLORIDE, VEGETATIVE COVER, SPRAY ON ADHESIVE OR OTHER
APPROVED METHODS.
3. IDENTIFY CONSTRUCTION STAGING, CONCRETE WASHOUT AREAS, MATERIAL STORAGE AND TOPSOIL
STOCKPILE AREAS. EACH AREA SHALL BE PROPERLY PROTECTED AND DELINEATED PRIOR TO
CONSTRUCTION.
4. THE CONTACT INFORMATION FOR THE PERSON WITH ONSITE RESPONSIBILITIES MUST BE POSTED.
5. IDEM AND CITY OF CARMEL MUST BE NOTIFIED WITHIN 48 HOURS OF COMMENCING CONSTRUCTION.
6. CONTACT INDIANA UNDERGROUND PLANNED PROTECTION SYSTEMS, INC. ( "INDIANA 811 ") FOR
UNDERGROUND UTILITY LOCATIONS. (1- 800 -382- 5544).
7. BEFORE OPENING UP THE SITE, FIRST EVALUATE, MARK AND PROTECT IMPORTANT TREES AND ASSOCIATED
ROOT ZONES, UNIQUE AREAS TO BE PRESERVED (I.E. WETLANDS), OR EXISTING VEGETATION SUITABLE
FOR USE AS FILTER STRIPS (ESPECIALLY IN PERIMETER AREAS).
8. FIRST, STRIP AND STOCKPILE ANY EXISTING TOPSOIL ON -SITE.
9. BEGIN MASS EARTHWORK FOR IMPROVEMENTS FOR PRELIMINARY GRADING. SEE "GENERAL SEEDING AND
SURFACE STABILIZATION PROCEDURES" FOR TEMPORARY SEEDING GUIDELINES ON THIS SHEET.
10. REPAIR ANY SILT FENCING IF DAMAGED. IF SILT IS 1/3 HEIGHT OF FABRIC, REMOVE SILT AND REPLACE
TO ORIGINAL CONDITION. SEE DETAIL ON SHEET C402.
11. IMMEDIATELY AFTER GRADING, APPLY SURFACE STABILIZATION PRACTICES ON ALL GRADED AREAS, USING
PERMANENT MEASURES IN ACCORDANCE WITH THE EROSION CONTROL PLAN. HOWEVER, IF WEATHER
DELAYS PERMANENT STABILIZATION, TEMPORARY SEEDING AND /OR MULCHING MAY BE NECESSARY AS A
PROVISIONAL MEASURE. ALSO STABILIZE (USING TEMPORARY SEEDING /MULCHING OR OTHER SUITABLE
MEANS) ANY DISTURBED AREA WHERE ACTIVE CONSTRUCTION WILL NOT TAKE PLACE FOR 15 WORKING
DAYS.
12. AFTER CONSTRUCTION AND FINAL GRADING, PERMANENTLY STABILIZE ALL DISTURBED AREAS. ALSO
REMOVE TEMPORARY RUNOFF CONTROL STRUCTURES, ANY UNSTABLE SEDIMENT AROUND THEM, AND
STABILIZE THOSE AREAS WITH PERMANENT SEEDING AND EROSION CONTROL BLANKET IF NECESSARY.
13. MAINTAIN ALL EROSION AND SEDIMENT CONTROL PRACTICES UNTIL ALL DISTURBED AREAS ARE
PERMANENTLY STABILIZED.
N
0 25 50 100
12.5 37.5 75
SCALE: 1"=50'
�r
k-,.4rro.,4
.:j
w i
.0',"j
4,
w O
E C14
> ��
o I o '� N
C Q fl
� z
m
C oo< a
W o _ U
+ 3 w z z Q
N 0 ^ U
0- Q
t clof z`t�
CL Q0w
Q M
M
C
w
z
O
E
E
CD
N
Q
.cj
T
>
z
o
C-)
co
C
.................
.... ft,
=D
�
U
LLJ
C)
J
= W Z
0
Q
co
D
z
z
CD
U
z
0
3, :I
SIDE YARD W i5 I
BUILDING HEIGHT
_
_
_
,- - _
- .•� -
`• : ` - '
_
4
_
.
-
•
T .��
._ . *�-
- -
._... _�
�
7T 77A
.
V
.: z7s
...... z_
._
_..., .. ^-'L+C-' �..- '•.:rte._- .- :.�.� .,
O
�
v
�' _. - �_ ..,p,L..
L
,.. .. -.
Tim
MINIMUM SIDE YARD`
i U
6
�� `•'
......
£'
mbsYSSr' w+:. ia.. w.ut.4dAt #tle.W,eMPoTttt..Yd^nr„�` yL�i ,w .�a3,.wr,x&s
Q N
I
WF.......nx:.s. .., .fi ».�::. ....�.:✓::,F ,u uh>si,x:.k: r.4i. £..�:x;,]rro
33
.
clt
pp�
O
N
O
/ 8
0 0
a �+
&-e
5i
c L
a S
1. INSTALL CONSTRUCTION FENCING AND GATES AS ILLUSTRATED.
2. INSTALL SILT FENCING AS SHOWN (SEE DETAIL ON SHEET C402). DUST SHALL BE KEPT TO A MINIMUM
BY UTILIZING SPRINKLING, CALCIUM CHLORIDE, VEGETATIVE COVER, SPRAY ON ADHESIVE OR OTHER
APPROVED METHODS.
3. IDENTIFY CONSTRUCTION STAGING, CONCRETE WASHOUT AREAS, MATERIAL STORAGE AND TOPSOIL
STOCKPILE AREAS. EACH AREA SHALL BE PROPERLY PROTECTED AND DELINEATED PRIOR TO
CONSTRUCTION.
4. THE CONTACT INFORMATION FOR THE PERSON WITH ONSITE RESPONSIBILITIES MUST BE POSTED.
5. IDEM AND CITY OF CARMEL MUST BE NOTIFIED WITHIN 48 HOURS OF COMMENCING CONSTRUCTION.
6. CONTACT INDIANA UNDERGROUND PLANNED PROTECTION SYSTEMS, INC. ( "INDIANA 811 ") FOR
UNDERGROUND UTILITY LOCATIONS. (1- 800 -382- 5544).
7. BEFORE OPENING UP THE SITE, FIRST EVALUATE, MARK AND PROTECT IMPORTANT TREES AND ASSOCIATED
ROOT ZONES, UNIQUE AREAS TO BE PRESERVED (I.E. WETLANDS), OR EXISTING VEGETATION SUITABLE
FOR USE AS FILTER STRIPS (ESPECIALLY IN PERIMETER AREAS).
8. FIRST, STRIP AND STOCKPILE ANY EXISTING TOPSOIL ON -SITE.
9. BEGIN MASS EARTHWORK FOR IMPROVEMENTS FOR PRELIMINARY GRADING. SEE "GENERAL SEEDING AND
SURFACE STABILIZATION PROCEDURES" FOR TEMPORARY SEEDING GUIDELINES ON THIS SHEET.
10. REPAIR ANY SILT FENCING IF DAMAGED. IF SILT IS 1/3 HEIGHT OF FABRIC, REMOVE SILT AND REPLACE
TO ORIGINAL CONDITION. SEE DETAIL ON SHEET C402.
11. IMMEDIATELY AFTER GRADING, APPLY SURFACE STABILIZATION PRACTICES ON ALL GRADED AREAS, USING
PERMANENT MEASURES IN ACCORDANCE WITH THE EROSION CONTROL PLAN. HOWEVER, IF WEATHER
DELAYS PERMANENT STABILIZATION, TEMPORARY SEEDING AND /OR MULCHING MAY BE NECESSARY AS A
PROVISIONAL MEASURE. ALSO STABILIZE (USING TEMPORARY SEEDING /MULCHING OR OTHER SUITABLE
MEANS) ANY DISTURBED AREA WHERE ACTIVE CONSTRUCTION WILL NOT TAKE PLACE FOR 15 WORKING
DAYS.
12. AFTER CONSTRUCTION AND FINAL GRADING, PERMANENTLY STABILIZE ALL DISTURBED AREAS. ALSO
REMOVE TEMPORARY RUNOFF CONTROL STRUCTURES, ANY UNSTABLE SEDIMENT AROUND THEM, AND
STABILIZE THOSE AREAS WITH PERMANENT SEEDING AND EROSION CONTROL BLANKET IF NECESSARY.
13. MAINTAIN ALL EROSION AND SEDIMENT CONTROL PRACTICES UNTIL ALL DISTURBED AREAS ARE
PERMANENTLY STABILIZED.
N
0 25 50 100
12.5 37.5 75
SCALE: 1"=50'
�r
k-,.4rro.,4
.:j
w i
.0',"j
4,
w O
E C14
> ��
o I o '� N
C Q fl
� z
m
C oo< a
W o _ U
+ 3 w z z Q
N 0 ^ U
0- Q
t clof z`t�
CL Q0w
Q M
M
Dla
L
C
w
z
O
E
E
CD
N
Q
.cj
T
>
z
o
C-)
co
C
—
LL-
=D
�
U
LLJ
C)
J
= W Z
0
Q
co
D
z
z
CD
U
Dla
L
Z
_O
J
O.
�I
W
Q !
O
i
iv
Keyplan
�Z
V♦
■� Z
L
Uj
— J
W
A�
W
Uj
U
.o
Drawing Number:
C401
►I
r
O
_N
Iq
6 N
o d'
O
Y
L
a
M
� M
� O
c0
d'
NZ
�U
C
w
O
E
E
N
Q
.cj
3
_O
.N
•>
a
Q
U
J
= W Z
0
F- W
co
D
U
Uj
ti 0 in
Z
_O
J
O.
�I
W
Q !
O
i
iv
Keyplan
�Z
V♦
■� Z
L
Uj
— J
W
A�
W
Uj
U
.o
Drawing Number:
C401
►I
r
O
_N
Iq
6 N
o d'
O
Y
L
a
M
� M
� O
c0
d'
NZ
�U