Loading...
HomeMy WebLinkAboutStormwater Pollution Prevention PlanU 'm d � � H a p �o M v O v O t O c-, JI N M O / O J rn 7/U O / / W Y O / p / O a o E N Ipp D L O N N J M M co" x O O > W v Ol O) O x N O O D x �. _ EROSION CONTROL LEGEND TP - TP TREE /SHRUB PRESERVATION AND PROTECTION SF SILT FENCE BARRIER INSTALLATION CONSTRUCTION LIMITS PERMANENT SEEDING WITH TEMPORARY CONSTRUCTION INGREES /EGRESS EROSION CONTROL BLANKET DRIVE. ONCE CONSTRUCTION IS COMPLETE, (SC 150) CONTRACTOR SHALL REMOVE STONE, RESPREAD TOPSOIL, AND SEED ENTIRE AREA. . . PERMANENT SEEDING Q INSERT (BAG) INLET PROTECTION INSERT (BAG) CURB INLET PROTECTION WITH CURB FILTER CONCRETE END SECTION RIPRAP DETAIL (UPPER AND LOWER INV) GRAVEL DONUT INLET PROTECTION DETAIL CONTRACTOR STAGING AREA SHALL UTILIZE THE EXISTING ASPHALT AREA. CONTRACTOR SHALL REPAIR ALL DAMAGED ASPHALT WITHIN THE AREA UPON COMPLETION OF THE PROJECT AND SHALL MEET THE STANDARDS AS DICTATED ON DETAILS. ® RECYCLING DUMPSTER CONCRETE WASHOUT AREA CD CONSTRUCTION DUMPSTER ROCK CHECK DAM EROSION CONTROL PLAN NOTES 1. SEE SHEET C403 FOR SOILS MAP AND SOIL CHARACTERISTICS. 2. SEE SHEET C402 FOR EROSION CONTROL DETAILS. 3. SILT FENCE BARRIER TO BE INSTALLED PRIOR TO CONSTRUCTION. 4. EROSION CONTROL MEASURES TO BE MAINTAINED THROUGHOUT THE ENTIRE CONSTRUCTION PROCESS. 5. SEE EROSION CONTROL SPECIFICATIONS FOR ALL EROSION CONTROL MEASURES, SCHEDULES, AND SEQUENCES. 6. CONTRACTOR TO PROVIDE A STABLE TEMPORARY GRAVEL CONSTRUCTION ENTRANCE /EXIT CONDITION FROM THE CONSTRUCTION SITE TO KEEP MUD AND SEDIMENT OFF PUBLIC ROADS. 7. EROSION CONTROL MAINTENANCE - SITE TO BE INSPECTED AT LEAST ONCE A WEEK AND MAKE REPAIRS IMMEDIATELY AFTER PERIODS OF RAINFALL. 8. STORMWATER DISCHARGE WILL NOT ENTER THE GROUNDWATER FOR THIS PROJECT. 9. THE 100 YEAR FLOODPLAIN FLOODWAYS ARE PRESENT AND LABELED ON THIS SITE. 10. CONTRACTOR SHALL PROVIDE THE OFFICE OF CODE ENFORCEMENT OF THE CITY OF CARMEL WITH A NARRATIVE DESCRIBING THE CONSTRUCTION SEQUENCE, INCLUDING START DATES FOR EACH LAND DISTURBING ACTIVITY. 11. THE ACTUAL PERSON RESPONSIBLE FOR THE INSTALLATION AND MAINTENANCE OF THE EROSION CONTROL SHALL BE DETERMINED DURING THE BIDDING PROCESS. THE AWARD WINNING CONTRACTOR SHALL BE RESPONSIBLE FOR THE PROPER INSTALLATION AND MAINTENANCE OF ALL EROSION CONTROL MEASURES. ONCE DETERMINED, CRIPE SHALL COORDINATE WITH THE CITY. 12. ANY DISCREPANCIES OR CONFLICTS WHICH BECOME APPARENT BEFORE OR DURING CONSTRUCTION SHALL BE BROUGHT TO THE ATTENTION OF THE ENGINEER OF RECORD IMMEDIATELY SO THAT CLARIFICATION OR REDESIGN MAY OCCUR. SEDIMENT CONTROL CONTROL 3EOUEWCE AND IMPLEMENTA TION EROSION AND 3EDIM - ... 1. INSTALL CONSTRUCTION FENCING AND GATES AS ILLUSTRATED. 2. INSTALL SILT FENCING AS SHOWN (SEE DETAIL ON SHEET C402). DUST SHALL BE KEPT TO A MINIMUM BY UTILIZING SPRINKLING, CALCIUM CHLORIDE, VEGETATIVE COVER, SPRAY ON ADHESIVE OR OTHER APPROVED METHODS. 3. IDENTIFY CONSTRUCTION STAGING, CONCRETE WASHOUT AREAS, MATERIAL STORAGE AND TOPSOIL STOCKPILE AREAS. EACH AREA SHALL BE PROPERLY PROTECTED AND DELINEATED PRIOR TO CONSTRUCTION. 4. THE CONTACT INFORMATION FOR THE PERSON WITH ONSITE RESPONSIBILITIES MUST BE POSTED. 5. IDEM AND CITY OF CARMEL MUST BE NOTIFIED WITHIN 48 HOURS OF COMMENCING CONSTRUCTION. 6. CONTACT INDIANA UNDERGROUND PLANNED PROTECTION SYSTEMS, INC. ( "INDIANA 811 ") FOR UNDERGROUND UTILITY LOCATIONS. (1- 800 -382- 5544). 7. BEFORE OPENING UP THE SITE, FIRST EVALUATE, MARK AND PROTECT IMPORTANT TREES AND ASSOCIATED ROOT ZONES, UNIQUE AREAS TO BE PRESERVED (I.E. WETLANDS), OR EXISTING VEGETATION SUITABLE FOR USE AS FILTER STRIPS (ESPECIALLY IN PERIMETER AREAS). 8. FIRST, STRIP AND STOCKPILE ANY EXISTING TOPSOIL ON -SITE. 9. BEGIN MASS EARTHWORK FOR IMPROVEMENTS FOR PRELIMINARY GRADING. SEE "GENERAL SEEDING AND SURFACE STABILIZATION PROCEDURES" FOR TEMPORARY SEEDING GUIDELINES ON THIS SHEET. 10. REPAIR ANY SILT FENCING IF DAMAGED. IF SILT IS 1/3 HEIGHT OF FABRIC, REMOVE SILT AND REPLACE TO ORIGINAL CONDITION. SEE DETAIL ON SHEET C402. 11. IMMEDIATELY AFTER GRADING, APPLY SURFACE STABILIZATION PRACTICES ON ALL GRADED AREAS, USING PERMANENT MEASURES IN ACCORDANCE WITH THE EROSION CONTROL PLAN. HOWEVER, IF WEATHER DELAYS PERMANENT STABILIZATION, TEMPORARY SEEDING AND /OR MULCHING MAY BE NECESSARY AS A PROVISIONAL MEASURE. ALSO STABILIZE (USING TEMPORARY SEEDING /MULCHING OR OTHER SUITABLE MEANS) ANY DISTURBED AREA WHERE ACTIVE CONSTRUCTION WILL NOT TAKE PLACE FOR 15 WORKING DAYS. 12. AFTER CONSTRUCTION AND FINAL GRADING, PERMANENTLY STABILIZE ALL DISTURBED AREAS. ALSO REMOVE TEMPORARY RUNOFF CONTROL STRUCTURES, ANY UNSTABLE SEDIMENT AROUND THEM, AND STABILIZE THOSE AREAS WITH PERMANENT SEEDING AND EROSION CONTROL BLANKET IF NECESSARY. 13. MAINTAIN ALL EROSION AND SEDIMENT CONTROL PRACTICES UNTIL ALL DISTURBED AREAS ARE PERMANENTLY STABILIZED. N 0 25 50 100 12.5 37.5 75 SCALE: 1"=50' �r k-,.4rro.,4 .:j w i .0',"j 4, w O E C14 > �� o I o '� N C Q fl � z m C oo< a W o _ U + 3 w z z Q N 0 ^ U 0- Q t clof z`t� CL Q0w Q M M C w z O E E CD N Q .cj T > z o C-) co C ................. .... ft, =D � U LLJ C) J = W Z 0 Q co D z z CD U z 0 3, :I SIDE YARD W i5 I BUILDING HEIGHT _ _ _ ,- - _ - .•� - `• : ` - ' _ 4 _ . - • T .�� ._ . *�- - - ._... _� � 7T 77A . V .: z7s ...... z_ ._ _..., .. ^-'L+C-' �..- '•.:rte._- .- :.�.� ., O � v �' _. - �_ ..,p,L.. L ,.. .. -. Tim MINIMUM SIDE YARD` i U 6 �� `•' ...... £' mbsYSSr' w+:. ia.. w.ut.4dAt #tle.W,eMPoTttt..Yd^nr„�` yL�i ,w .�a3,.wr,x&s Q N I WF.......nx:.s. .., .fi ».�::. ....�.:✓::,F ,u uh>si,x:.k: r.4i. £..�:x;,]rro 33 . clt pp� O N O / 8 0 0 a �+ &-e 5i c L a S 1. INSTALL CONSTRUCTION FENCING AND GATES AS ILLUSTRATED. 2. INSTALL SILT FENCING AS SHOWN (SEE DETAIL ON SHEET C402). DUST SHALL BE KEPT TO A MINIMUM BY UTILIZING SPRINKLING, CALCIUM CHLORIDE, VEGETATIVE COVER, SPRAY ON ADHESIVE OR OTHER APPROVED METHODS. 3. IDENTIFY CONSTRUCTION STAGING, CONCRETE WASHOUT AREAS, MATERIAL STORAGE AND TOPSOIL STOCKPILE AREAS. EACH AREA SHALL BE PROPERLY PROTECTED AND DELINEATED PRIOR TO CONSTRUCTION. 4. THE CONTACT INFORMATION FOR THE PERSON WITH ONSITE RESPONSIBILITIES MUST BE POSTED. 5. IDEM AND CITY OF CARMEL MUST BE NOTIFIED WITHIN 48 HOURS OF COMMENCING CONSTRUCTION. 6. CONTACT INDIANA UNDERGROUND PLANNED PROTECTION SYSTEMS, INC. ( "INDIANA 811 ") FOR UNDERGROUND UTILITY LOCATIONS. (1- 800 -382- 5544). 7. BEFORE OPENING UP THE SITE, FIRST EVALUATE, MARK AND PROTECT IMPORTANT TREES AND ASSOCIATED ROOT ZONES, UNIQUE AREAS TO BE PRESERVED (I.E. WETLANDS), OR EXISTING VEGETATION SUITABLE FOR USE AS FILTER STRIPS (ESPECIALLY IN PERIMETER AREAS). 8. FIRST, STRIP AND STOCKPILE ANY EXISTING TOPSOIL ON -SITE. 9. BEGIN MASS EARTHWORK FOR IMPROVEMENTS FOR PRELIMINARY GRADING. SEE "GENERAL SEEDING AND SURFACE STABILIZATION PROCEDURES" FOR TEMPORARY SEEDING GUIDELINES ON THIS SHEET. 10. REPAIR ANY SILT FENCING IF DAMAGED. IF SILT IS 1/3 HEIGHT OF FABRIC, REMOVE SILT AND REPLACE TO ORIGINAL CONDITION. SEE DETAIL ON SHEET C402. 11. IMMEDIATELY AFTER GRADING, APPLY SURFACE STABILIZATION PRACTICES ON ALL GRADED AREAS, USING PERMANENT MEASURES IN ACCORDANCE WITH THE EROSION CONTROL PLAN. HOWEVER, IF WEATHER DELAYS PERMANENT STABILIZATION, TEMPORARY SEEDING AND /OR MULCHING MAY BE NECESSARY AS A PROVISIONAL MEASURE. ALSO STABILIZE (USING TEMPORARY SEEDING /MULCHING OR OTHER SUITABLE MEANS) ANY DISTURBED AREA WHERE ACTIVE CONSTRUCTION WILL NOT TAKE PLACE FOR 15 WORKING DAYS. 12. AFTER CONSTRUCTION AND FINAL GRADING, PERMANENTLY STABILIZE ALL DISTURBED AREAS. ALSO REMOVE TEMPORARY RUNOFF CONTROL STRUCTURES, ANY UNSTABLE SEDIMENT AROUND THEM, AND STABILIZE THOSE AREAS WITH PERMANENT SEEDING AND EROSION CONTROL BLANKET IF NECESSARY. 13. MAINTAIN ALL EROSION AND SEDIMENT CONTROL PRACTICES UNTIL ALL DISTURBED AREAS ARE PERMANENTLY STABILIZED. N 0 25 50 100 12.5 37.5 75 SCALE: 1"=50' �r k-,.4rro.,4 .:j w i .0',"j 4, w O E C14 > �� o I o '� N C Q fl � z m C oo< a W o _ U + 3 w z z Q N 0 ^ U 0- Q t clof z`t� CL Q0w Q M M Dla L C w z O E E CD N Q .cj T > z o C-) co C — LL- =D � U LLJ C) J = W Z 0 Q co D z z CD U Dla L Z _O J O. �I W Q ! O i iv Keyplan �Z V♦ ■� Z L Uj — J W A� W Uj U .o Drawing Number: C401 ►I r O _N Iq 6 N o d' O Y L a M � M � O c0 d' NZ �U C w O E E N Q .cj 3 _O .N •> a Q U J = W Z 0 F- W co D U Uj ti 0 in Z _O J O. �I W Q ! O i iv Keyplan �Z V♦ ■� Z L Uj — J W A� W Uj U .o Drawing Number: C401 ►I r O _N Iq 6 N o d' O Y L a M � M � O c0 d' NZ �U