HomeMy WebLinkAbout11 c500 site erosion control plan.pdfti�
�.
+�
0 [op ot curb
a.yg9o� pavement
0�
`_;
EXISTWG SPOT ELEVATIONS
EXISTING CONTOl1R LWES
PROPOSED SPOT ELEVATIONS
PROPOSED CONTOUR LMES
PROPOSED STORM SEWER PIPES
PROPOSED PRECAST CONCRETE
WLET (SEE SITEWORK
DETAILS)
BENCHMARKr MARION COUNTY BENCHMARK -PIKE 94
SEC 19-17-3� INDIANA STATE HIGHWAY COMM. STANDARD BRONZE PLATE,
STAMPED MAR G-24, SET IN TOP OF CONCRETE POST, 60' SOUTH OF
CENTERLINE OF 86TH STREET AND 93 SW OF U.S 421.
NAVD 88 = 860.10
�TBM�1
IRON PIN WITH CAP MARKED MILLER
ELEV.=898.36
12 � � j � �
EROSION CONTROL LEGEND: �N� � � � ' "
Eti- i i ��
/// i i ��
/ i i
TEMPORARY SILT FENCING % i i�
(SEE EROSION CONTROL y'¢�� � ��
DETAILS PAGE) � � �A � i i
FABRIC DROP WLET EROSION � J,�%�� \— j�
� PROTECTION (SEE EROSION /� q �
CONTROL DETAILS PAGE) /\ � ��� I I �
\ � �� / �
TEMPORARY TRIANGULAR SILI� DIKE \ �%' /� i�
(SEE EROSION CONTROL � ���� �
DETAILS PAGE) �� � ��� � � �
i %
EROSION CONTROL BLANKET � � �� /
(SEE EROSION CONTROL � � � % i
DETAILS PAGE) � � � �
/
\ /
/
� �� � VA
OwNER V �� ��� � EX_ BEEHNE INLET
106 MICHIGAN REALiY, LLC �� � V�� TC=898-09
10659 N. PENNSYLVANIA STREET, SUITE 100 T �� �� INV. 15'RCP 5=89654 ALL REQUIRED EXCAVATION IN THIS
INDIANAPOL15, INDIANA A � �� AREA SHALL BE DONE WITH CAUTION �
46280 �� INV- 12" RCP E=896-54 DUE TO AN EXISTING GREASE PIT
� A� INSTALL TEMPORARY NON-WOVEN AND THE UNKNOWN LOCATION 0�
�� POLYPROPLENE SACK �WLET TEMPORARY (LOW PROFlLE) EXISTMG SERVICE PIPES.
INSTALLA710N RESPONSIBILITY: � \ �� PROTECTION) W EXISTING CONCRETE WASHOUT DUMPSTER
VERSATILE CONSTRUCTION GROUP LLC � �� ��� STORM WLETS (SEE DETAIL, LINED WITH 4mll VISQUEEN LINER
PROJECT SUPERVISOR: MARC TWOREK � �A THIS PAGE� � (SEE DETAIL, THIS PAGE)
570 E TRACY RD. SUITE 610 \\ EX_ FLAT GRATE INLET � exist-
NEW WHITELAND, INDIANA � � �� TC=898.40 �� INSTALL STONE STABILIZING % a��h wa�k
46184 � � A�i� � � BASE UNDER DUMPSTER � � �on �
�� INV. SE 24" RCP=893.90 � AND PORT-O-LET ��� 1�
PHONE (317) 535-3579 � ��� �\� INV. NE 24" RCP=S94.00 ��� (NO JOB TRAILER WILL � f,�� V�
� ,i� � a ��� �� ee ReauiReo) I�� .
sEEOiNC iNFO: Y � �� � � A\
1. ALL DISTURBED AREAS SHALL BE �� � �� �� �� LOCATION LET � g�f �
PERMINATELY SEEDED PER EROSION � �� �� �� \
EX. INV. 15" RCP=896.50 \\ / �
CONTROL DETAILS PAGE C520 � �� �� en�� �
(aT No PowT ouRiNC coNSrRUCnoN � � �A �� a��'� ' '
SHALL ANY PART OF THE SITE REMAIN � �� A �� � �M�jS �� � p e*ii ��
UNDISTURBED FOR MORE THAN Tw0 � R � ac� � �
MONTHS THEREFORE NO TEMPORARY II � \ � \ pERAEROS��GUON ROLLDETAILS ONSTR�C�ON �oUMP�\O �� // `
seeoiNC sHn�� ee REOUiReo) � A � � � � � �� ���P � ,��� �
\
EX. FLAT GRATE INLET
TC= 900.34
INV_ SW 24' RCP=896.12
INV. NE 18° RCP=896.24
INV. SE 10° PVC=89624
NOTE:
NO EARTH DISTURBING ACTIVITY MAY
COMMENCE WITHOUT AN APPROVED
STORM WATER MANAGEMENT PERMIT
� � � TEMPORARY GR�CONSTRUCTION � � �i 'la- � �
� ENTRANCE (SEE E ON CONTROL 000 �� �
EROSION CONTROL NARRATIVE: � � V ` oera�s) A� � � � ' �� � ' �
V � ` � ' � C�
This project wlll conslst o( ronshucfion o( a new 11,8]5 s.(. s4ip center and 6,651 s.(. asphalt park'mg. � � �A � �
The pro�ect is lowtetl west o( lhe existing Morsh Store on tne northewt comer of IO6th Street antl � � � �� � �AA i� �
Michigan Road. The esfimated time (or completlon o( the construction project is 150 calendar days. �� � �� /
Soll dlsturoing octivffu wfll fnclude WSTALL TEMPORAR�S"dio � �% r � �� o �� 6
corrugated pvc PIP T0� A �� �� �o �/� ��N g0 � �
n.i�staii s�dt re��e pe�lmete� �o�t�oi a�d s��it ���iet p�ote�tto� BY-PASS CONSTRUC ION ,� � -� AP i
nRea aNO 1NRU Roc crt�cK � — p0 �� � V� S R E�E� � �� � j�
B.Install rock check dams, temporary bypass plpe, and temporary mnstrucGOn enhance DAM �TYPICAL� - �% �A AA � Q �
C. Remwal o( existing pavement and curb � � � �� � F� � / ��
D. Beqin site qmding and construcGOn of building paa �� � � � /Qe �� �� F\N�S /
E Begln construcPion of etorm pipes and Inlete behlnd building � ��� �� � �� _ /� 1 �
Elnstall se0lment barrters as sawers ond inlets are consWCted �� AA � � pA� � / � � �
G-Begln excavation ot detenUon area WSTALL EROSION CONTRO �� � %� / � Q
H_i„staiiauo� or �me� d�d�„s, sto.mreon enamee��, nq�aswld, a�d sto„e ru �� �A �o, i ��N �o
BLANKET PER EROSION
Jnstail Temporory 6" gmvel lot witn non-woven fobrlc untlenayment over new parking bt stone CONTROL DETAILS � �1��� ��EVPj �''� � �
�Begin coretrucPion of builtling �� � � p � � \ ���1 f �
K. co��o-��i,a� ar ���e� � � � � ��� �� F
L Construct porous asphaltic pwement ��� � � Oc��� � S�EP �� ��\
M.Removal o( stockpile and Mal grading o( qrass areas � / �� � � �� ��°��� 8/ / A� V ' '
N.Final seeding and Landscaping � ��� � �� �% � �� �
O.Removal of rock eheek dams, s➢t fenee, bypass plpe, and Inlet pmteclion � � � ��(�P�d �� /�
,,,
� �� / � -O �w�RL� � /
V � \\V G� \\ � � � � Pa P-°� `' � � N�E� 09 � �
EROSION CONTROL SEQUENCING: � \ ��� � � � � 9 � �
�i � � '"� ��'�� c9� ��� �� �R�P �, �q«.
A.Install s➢t fence perimeter control and slt inlet protectlon. � � �� �� � � � ,� � �� �� � � �c'��.A�- � �R, � a / �
BJnstall rock check dam ot existing ouHall pipe, the bwtion Is shown on the SWPPP plan sheel �A t� F
Glnstall temPOrary byPass p10e � �� �� � � � '9po �\ VA ���\S� p,EiEj' / \
DJnstall temporory wnstruction entrance_ � QA V '(P P�E
E Removal o! axlsHng pwemen6 � � � Z G�� �/� � 6R -��pN �
F_Commence site groding ond builtling pod construction. � ��� � � ��\ �y / QpRP��PBR�CSjP�'
G.Any disWrbed areas o( the slfe where constructlon acGvity has ceaeed Por more than 14 days � 6 ���� / , jEM Epl �N �E
shall be tempororlry seeded antl watered- � � 3 vAr -o � / 5 W�� pR�� (�6M� pP`�E�
n.iosmu an srorm �wers a�e r�ie� eanr�a e��id��q � �� � �� ���� � � �NSSP � NoN�S PR�MEN�� R��0�5
_ �ns[a�� INet/ounet proeeotlon at tne �ooaKons or a�� grate fn�ets and ae me enas or ai� e.posea � � ��� � � c�� oU � � �o �� pj O�y�J,6 pPV6 � pE
storm sewer Pipes. �� � ��� G AA NDER �AOVS �P�LAN
d_Exoa�ate aete�Go� a�eas � � ��� �� ��in� c�VA �n o��� � U PER �NS
K.Install under drains, Stortntech Chambers, AqmSwirl, and stone 811 � � � ��� �� � pF �R�O
Install Temporary 6" gmval bt with non-woven fobric undatloymant over new parking bl stone y� \ '�''- QR
J.Begin construcGOn of bulldmg � � ��� � �� ��� �%'� ���� � �
K Ftnalize pavement sub-grotle prapamtioa \ \\� _�l \\ y � p�� Z `
L Install base malerial as required for porous pavemenl �
�
�
M_Conshuc� all cmbs an0 sidawalk� � � ��� � �� 2��� Q ��A
N.COnstruct porous asphalEC pavement � � �� � ��� 3 �
0. Ramove stockpile and conshact and final re-grotle exisling swala_ � �� � U' �Q�A 'a� � ��A aQ? S( G
P. Removal of temporary rock check dam and bypass piping. � �� SJ �� �° �A
O.Carry wt tfnai seedmg and pionting � �� INSTALL EROSION CONTR� ZV� '
R. Remove silt fencinq only after all paving is mmplete and exposed surfaces are stabilired. �o�
� BLANKET ON FINAL GRADE � �� � ��� 90� �
\ \\\ PeR eROSioN coNTRO� oe�ai�s ,-- N�,��
�aoaa�a�a�,« � �� 0� \� V � � � ���� � � �
u�n��a��am.kamR..�A o�n.iAan�nnm�ro.kaiP.P;,P.m�y��Aan \ �AA cnrch aasw ceare � � o ��� � ���N`��S
"1GAfo�k+s�tryg�ldes "1GAB�keleeveteck�ppleteewltlilrnegelc:te,�dcib�mpue - � � P VA � GjVON
3"z4"Nllle,�gthbotromvelnfcrw,me,�ta 12GAeldewelle 1' REBpR FOR 9nG REMOVnL �� � �� �(e �V�%��� �''� � G����R�
R��eA dl'gtsPleHcllde 112PVCdrelnpl�g � � 6 $ \� � ��
CATCH BASI � IXPANSION RESTRAIM \ 3
R�st�ea't tpv' Neldeendoct 'IWOC�tehlghglceee,�emelMleh ' � 'O� ��A �
' 2'%2'�° RUBBER BLOCKS �� �� �
Optioue \ � � INSTALL TRIANGULAR SILT DIKE
. �� � ���t� �� � PER EROSION CONTROL DETAILS
,ocnaiaewaua sroxM viaE �-<-��, � � � SteS �� ; 999 I�
� cn eioo� d� c I I
POLYPROPLENE �� � �fS � %� \ II
Ceetue:2[Ig1Q2ewlvel,fcrtwo�lao��fo�rc�blcyardco�ta��ue y >�� FlLTER SACK (WOVEN) ` � (` ��
.:�r-: . ���,- INSTALL ROCK CHEC�C ` � BM#� �
DAM (SEE EROSION � II n�
nlm�:lo�: CONTROL DETAILS) � \ e — —
WOVEN POLYPROPLENE SACK ge �eme
� /j= =A
�°�� ������� �RNTERIOR OF DUMPSTER G�CX BASIN GRAiE �� � �G� ��� �� ��� ���
TO BE IJNED WITH 4mil. INSTALL TEMPORARY 1S�1Ia. g9� m0 �� /�
vI50VEEN uNER. corrugated pvc PIPE T0� � II � �� �
� � ��
POLYPROP�NE BY-PASS GONSTRUCTION � � �
c ��" �� a°OT AREA AND THRU ROCK C CK � � �� �Q'� � ��� � � / ��i
� � � . ovEar,.ow onM (rrP�cn�) � � � i Cj�� � � � � ��� �
� �� � i
SrORM PIPE � �� � �II ��
POLYPROPLENE � � � O �� �� �� �
Modd FL2 FL? FL4 FLfi-LP FLfi FLoSL FL8-LP FL8 FL8SL FLLO FL10SL y ','� ," y FlLTER SAGN (NON-WOVEN) � � �� VA II �
cpaoi�ro�ra� z a a e e e s a a ic m .� ..,,.° _.... .� e"� �� / j���� � �
(n��,a,voged€n� a5 aa si a� ee si si �rz r aa si NON WOVEN POLYPROPLENE SACK �� � -- � �� �� �� �
(�Sldeloadinghdght _ _ _ _ 3� _ _ qq _ G5 _
(� Irvolw ha�t 41 S 60 A5 64 b0 59 "16 "12 80 80
(D)IOtalcedepih 3fi 42 S1 9fi fifi �2 9fi Y2 80 "1` 88
mi�imwia�e �rz �z �rz �z �rz vz ;z �rz �2 r �z
Ilddze2+aoh) 3dz41 3fiz4] 3fi 58 3fi 58 3fi 58 3hx58 3bs58 3fir58 3fi 58 3fiz58 3fix58
Sldedoce W x H _ _ - 30z�M 30Xi0 - 3U3M 30r30 - 30z30 -
AIl dimeoeiooe aze io iuchee
* Aveilable with two eitle doore or ttvo 36x47 aa� lide
-LP = low pr�file
SL=eleot
1. RECESSEO CURB MLET CATCH BlSWS MUST BE
BLOCKEO WHEN OSING FILTER FNBRIC INLEf SNCKS.
SRE OF FlOER FPBRIC INIET SACKS TO BE
DEfERMMED BY MANUFACTURER.
\ \� II
NON—WOVEN POLYPROPLENE �SACI( qEfAIL
SCALE: NO SCALE �
��
POST TEMPORARY "NO-
CONSTRUCTION TRAFFlC
ALLOWED" SIGNS
`�
�
/ �
� � �NG�/
�' � � �
/ % �� ��
�� / / / � ��
/ /
�� / /
i i
� �
_/
SITE EROSION CONTROL PLAN
SCALE 1"= 20.0'
W
v
�
a o
�
o a °
� N w
N
o � v
n v
� �
o, o
3 3 �
a v o
o "
_ o
> �
� �
`o
� � o �
N
�A � ` "
� v ma o
°w
Q �
0
E
VERSATTLE
CONSTRUCTION
GROUP, LLC.
Sm e�i r��y aooa. s�¢a sio
o J6181
Gk ]IZS1535]9 �FOx_ 309&d5B1
a
� � 0
� � �
� �� �
3 � �
^` 'L� �
W �
� � �
�
�
Job No.: Date Stamped�.
13039 9/30/13
Drown By Checked By Scale:
caw tab 1"= 20A'
CAD RLE.
CV13039\c500 clte erasion conlrol plan.dwg
���ii �A%l� _•"'"
�� �� � �� j�� ��� �� KIIOWVY�IbAfOlb�11� CERTIFIED BY:
� ��
\ \ �� �/ �� THIS DRAWING IS THE PROPERTY OF
� � V // / �� UTILIiY DISCL/UMER veRSnn�E coNSTRUCTioN cROUP ��c
� V O 11 AND IS NOT TO BE USED F012 ANY
� j�� II EXISTMG UNDERGROUND INSTALLATIONS SUCH AS WATER MAWS, GAS oTHER PURPOSE THAN THE PFOJECT
/�� II MAMS, SEWERS, TELEPHONE LINES, AND BURIED STRUCTURES IN DESCRIBED HEREIN.
� % �� IL � THE VICINItt OF THE WORK TO BE DONE HEREUNDER ARE INDICATED
� �� �� /� -- ON THE DRAWINGS ONLY TO THE EXTENT SUCH WFORMATION HAS �� nnc�.
1 � j� ��� /� � BEEN MADE AVAILABLE TO OR DISCOVERED BY THE SURVEYOR IN �\
� �� �� � EX. INV. 27"RCP=890.58 PREPARING THIS DRAWING. THERE IS NO GUARAMEE AS TO THE ����
�� � ACCURACY OR COMPLETENESS OF SUCH INFORMATION, AND ALL
\
�� � /��` RESPONSIBILITY FOR ACCURACY AND COMPLETENESS THEREOF IS
�/ F �, / �EX. INV. 15"RCP=893.18 EXPRESSLY DISCL4IMED.