Loading...
HomeMy WebLinkAbout23 c810 curbing policy.pdfCity of ('a�xnel Conaete Curb Policy December 13, 2006 1) General A) The work subject to the requirements of this policy shall include the production, hauling/delivery, excavation for, placing installation, jointing, curing finishing, and o[her work necessary [o prepare foundations and soil subgrades, ins[all aggrega[e bases and i��stall concre[e curbing within property wilhin lhe corporate limits of the City of Cannal and exieting or proposed rig(rt-of-way. B) This policy shall be the basis for acceptance of the work by the City. Failure to adhere to lhe requirements of this policy may result in non-acceptance of the work or other remedies outlined in this palicy. C) Workmanahip, materials and quality of the work completed shall confonn to the 2006 Standard Specifcations ofthe Indiana Department of Transporiation (hereinafter reFerzed to as Standard SpecifioaUOns), except where deviations aze albwed or specified hereiq or variances aze granted. D) Where the minimum standards of any other govemmental agency having concurrentjurisdiction exceed lhese standards, the higher standards shall apply. E) If any plan or other note or apecification on the approved construction documente exceeds the minimum standards of this policy, the higher standards shall apply. F) Nothing con[ained herein shall be construed as prohibi[ing the design and construction of improvements meeting higher standazds, nor as discouraging peti[ione to appropciate goveming bodies for variances for altematives which can be supported by advances in technology and are approved by other agenciea with concu�rentjurisdiction. G) All work shall comply with the requirements of Section 105.03 of the Standard Spec�cations. H) For the purposes of this policy, where the term Engineer is used in this policy and the Standard Specifications, it shall mean: i) The Camiel City Engineer, staff of the Deparhnent of Engineecing, other personnel employed by the City of Carmel, or authorized agent(s) that may be retained to representthe CiTy of Carmel. ii) The Hamilton County Higl�way Engineer, staff of lhe Hamilton County Highway Department, other personnel employed by Hamilton County, or authorized agent(s) that may be retaineA to represent Hamilton County Highway, depending on the location of the work. n Authority of the Engineer overthe work shall be per Section 105.01 of the Standard SpecifioaUOns. .� Prior to oommenoing the work, the Contrao[or perfortning the work shall oontaot U�e Engineer to scl�edule a pre-constmctio�� meeting to review the Engineer's construction requiramen[s, ataffnotifica[ion raquiremants, requirad inspactions for certain stages of the work and to review the authority of the Engineer as it rela[es [o the work. City o£Carme] Concrete Curb Policy December 13, 2006 K) Under no oircumstanoes shall work subjeotto the standards established by this policy commence without obtaining approved construction drawings by the CiTy o£Carmel Depariment of Engineering. L) At the sole disoretion ofthe Eugiueer, the portions ofthis polioy related to inspections and testing of work subject to the requiremeMS of this policy outside ofthe righUOf-way shall be determined at the pre-construc[ion meeting. M) Dimensional and other standazds for concrete curb shall be in accordance with the City of Carmel Standard Details. N) Under no circumstances shall material other than Portland Cement Concrete meetingthe standards estabLished by this policy be utiGzed to construct concrete curbs within the corporate limits of the City of CarmeL. O) Under no circumstances shall exlmded Type curb be installed within the coiporate limits of the City of CanneL. 2) Foundation A) General i) This work shall wnsist of the conslruclion/preparation of the foundation in a000rdanoe with SeoGon 105.03 of lhe Standard Speoifioations. ii) The foundatiou shatl be prepared in accordance with Sectiou 605.03(a) ofthe Standard Specifications and the requirements of this policy. B) Excavation and Embankment i) Prior to beginning excavation a��d embankment operations, all necessary clearing grubbing scalping and topsoil stripping and subsequent bac�lli�g for removed items within the slope stake limits shatl be performed in a000rdance with Section 201.03 aud 201.04 of the Standazd SpeoiSoations. Al] topsoil, vegetation, roots, stumps, friable and deleterious material shall be completely removed within the limits of the slope stakes. ii) Excavations (1) After excavation operationc, all apoiigy uid yielding material that does not readily wmpac[ shall be removed from within the slope stake limits and the resulting void shall be refilled with suitable material and compacted in accordance with Section 203 of the Standard Spec�cations. (2) Any pronounced depressions witltin the sLope stake limits resulling after excava[iou operations shall be refilled with suitable material and compac[ed in accordmice with Section 203 of [he Standazd Specifica[ions. iii) Embankments (1) Embanktnents shall be constructed in accordance with Section 203 ofthe Standard Specifications. (2) All spongy and yieldiug material that does not readily oompaot shall be removed from within the slope siake limits prior to embankment operaGOns. Page 2 of 8 CiTy of Camie] Concrete C�rb Policy December 13, 2006 (3) My pronounced depressions within the slope stake limits resulting afier cleazing gubbing, scalping and topsoil removal shall be refilled with suitable material and compacted in accordance with Section 203 of the Sffindard Specificalions prior to embankment operations. (4) Prior to the construction of any embankment, the original ground surface within the ]imits of the slope stakes shall be leveled and the upper 6-inches shall be compac[ed in accordance with Section 203 of the Standazd Specifications. (5) Embankments shall be shaped to be well drained and shall be protected to preveM erosion. (6) Loose depth of each embankment lift, Fnal compacted depth, compaction method and compaction requirements shall be in accordance with Seclion 203 of the Standazd Specifications. C) Soil Subgrades i) Subgades shall be installed on foundations constructed in accordance with Section 2(A) and Section 2(B) of this policy and only after the installalion of all uUlities and subsurface drains indicated on the approved construction documents to be located under the paveanent are completed. Trench backfilling work of these installations shall be in accordance with the City of Carme] Trench Bac�lling specifications. ii) The subgrade shall be shaped to the required gade and sections, free from al] m[s, co�rugations, or o[her i�regularities. iii) The subgrade shall be uniformly prepazed, compacted and approved in accordance with Sections 207.02, 207.03 aud 207.04 of the Stmidard Specifications. iv) Subg�ades shall be inspected and approved by the Engineer before any aggregate base or concrete wrbs are constructed. A proofroll shall be conducted in accordance wi[h Section 203.26 of the Standazd Specifications. Unacceptable areas shall be co=recteA to the satisfaction of the Engineer before llie placement of any Aggregate Base or concrete curbing. v) At the discretion of the Engineer, Subgrade that hac satisfactorily passed a proofroll, but remains uncovered for a period of 14 calendar days prior to placing Aggregate Base or concrete curbing or is subject [o a measurable rain event prior to placing Aggregate Base or concrete curbing shall be subject to additional proof rotls prior to placemecrt of the Aggregate Base or concrete curbing. 3) AggregateBases A) General i) This work shall coneist of placing a compacted Aggregate Base on a prepazed soil subgrade in accordance with Section 105.03 of the Standard Specifications. CiTy of Cannel Concrete Curb Policy December 13, 2006 u) Aggegate Base materials shall be in accordance with Section 301.02 of the Sffindard Specifications. iii) The Aggegate Base material shall be obtained from a Certified Aggegate Producer in accordance with Section 917 of the Standard SpeciFcaiions. iv) The Aggegate Base material shall be handled and transported to, and on, the work site in a manner that minimizes segegatiou and moisWre loss. v) Aggegate Bases shall be constructed on approved soil snbgrades and to thicknesses equal or geater than those indicated on the approved construction documents. B) Temperature and Seasonal Limitations i) The Aggregate Base shall be placed in accordance with the temperature limitations of Section 301.04 ofthe Standard Specifications. ii) Frozen material shal] not be placed. iii) Aggegate Bases must be placed and pass proof roll prior to November 30 in order to allow paving in accordance with Section 4C(iv) of this policy. C) Preparatiou i) The prepazed soil subgade shall be free from objectionable or foreign materials atthe time of placement ii) The subgrade shall be subject to additional proof rolls in accordance with Section 203.26 of the Standard SpecificaGOns just prior to placing the Aggregate Base on the subgrade in a000rdanoe with Section 2C(v) of this policy. Unaccep[able areas shall be corcected to the satisfaction of the Engineer before any Aggregate Base is placed. D) Spreading and Finishing i) The Aggregate Base shall be spread in accordance with Section 301.05 of Uie Standard Specifications. ii) 11ie Aggregate Base shall be compacted in acwrdance with Section 301.06 of the Standard Specifications. iii) Concre[e curb shall be placeA over the Aggregate Base within 14 calendar days. Aggregate Bases that ]ay exposed for a period of time greazer than 14 calendar days or experience a measurable rain event prior to the placement of coucrete mub shall be subject to inspection aud acceptance by the Engineer. At the discretiou of the Engineer, additioual proof rolls may be required. 4) Concrete Curb A) General i) This work shall consist of placing concrete curbing on prepazed soil subgrades or Aggregate Bases in accordance with Section 105.03 of the Standard Specifications. ii) Concrete curb shall be consfructed on prepared soil subgrades or Aggregate Page 4 of 8 CiTy of Cannel Concrete Curb Policy December 13, 2006 Bases to the dimensional standards of the applicable City of Cam�el Standazd Details or in accordance with the curbing details of the approved construction documenis. iii) Materials used in the production of the concrete for the curbing shal! be in accordance with Section 605A2 of the Standazd Specifications. High early strength admixtures may be ulilized bul shall not be considered in waiving any requiremeMS of this policy. Freeze protection admixtures shall not be utilized under any circumstances. iv) Equipment utilized for concrete curbing installation work, including butnot limited to producGon, hauling/delivery, placing, installation, jointing c�ring finishing and miscetlaneous/ancillary activiTy sha1L be in accordance with Section 508 ofthe Standard Specifications. v) Concrete prod�ction, mixing and hauling/delivery shall be in accordance with Section 502.10 ofthe Standazd Specifications. vi) Installation of the concrete curbing indicated on the approved construction documents shall be completed in the same paving season. B) Preparation i) The soil subgrade or Aggregate Base shall be subject to additional proo£rolls in accordance with Section 203.26 of the Standard Specifications just prior to placing the HMA courses in accordance with Section 2C(v) and 3D(iii) of this policy. Unacceptable azeas shall be co�rected to lhe satisfaction ofthe Engineer before placement of any concrete curbing. ii) All displaceme`A or rutting of the soil subgrade or Aggregate Base shall be repaired prior to placing concrete wrbing. C) Weather and Seasona! Limifations i) Concrete curbing shall only be placed in accordance with Section 502.11 of the Staudard S ecificatious with the exce ion that lacement o erations shall P P� P P not begin until the ambient temperature is 50°F aud rising. Plaoement operations shall be discontinued when the ambient temperature is descending and is 50°F or below. Atthe discretion of the Engineer, concrete may be placed at ambienttemperaWres less than noted above provided that placement, jointing, finishing and curing operations confomi to Sections 502.11 and 702.11 of the Standard Specifications. ii) No mi#ure shall be placed on a frozen subgrade or Aggregate Base. iii) Under no circumstances shall concrete curb be placed between December 15 and March 30. iv) If a soil subgrade or Aggregate Base over which concrete curb is to placed, is pLaced and approved by the City prior to November 3Q placement of the concrete carb will be allowed up to December 15, pmvided that the ambient and soil subgrade or Aggregate Base surFace temperature complies with the requiremeMS of Section 4C(i) of this policy and the paviiig contractor pay for Ciry of Carmel Conorete Curb Polioy December 13, 2006 the services of a full time construc[ion inspector and who shall ac[ as an authorized agent ofthe Eugineer. The Engineer ehall selut the construction inspector. v) If the ambient and soil subgade or Aggregaze Base surface temperature complies with the requiremeuts of Section 4C(i) of this policy between April 1 and Apri] 15, concrete curb shall be allowed to be placed on an approved soil subgrade or Aggegate Base provided that the paving contractor pay forthe services of a full time construction inspec[or and who shall act as an authorized agentofthe Engineer. The Engineer shall selectthe construction inspector. vi) The Engineer reserves the ri�t to suspend all concrete curb placement operations if, in the opinion of the Engineer, that prevailing weather conditions and/or the wndition of the Subgrade and/or the Aggegate Base may result in substandard concrete curb placeanent, curing and finishing. D) Placement i) Concrete ourb shall be plaoed iu acoordauoe with Seotion 502.09, 50212 aud 605.04(c) and 605.04(d) of the Standard Speci£cations. ii) Curb machines may be utilized iu accordance with Section 605.04(c) and 605.04(h) of the Standard Specifications provided that [he equipmeM conforms to the requiremecrts of Section 508 of the Standazd Speci£cations. iii) Formwork shall comply with the reqnirements of Section 605.04(b) of the Standard Specifications. iv) Fomis shall be removed iii accordance with Sec[ion 502.16 and 605.04(b) of the Sta��dard SpeciScations. E) Joinls i) Joints shall confomi to the req�irements of Section 503 and 605.04(e) of the Standard Specifications. ii) Joints shall be installed at intervals of 10-feet or less; 5-foot or less along radii. Joints in i`Aegral curb and sidewalks shall be located atthe same ]ocation u thejoints in the adjoiiiing sidewalk Soints may be sawed or tooled to a minimum dep[h of %z-inch. iii) Preformed expansionjoints shall be placed at intervals of 50-feet or less, at all castiugs, the beginning and end of all cwb rehuns, the end of each days work and where abutting exis[ing cons[ruction_ In addition to these requiremen[s, expansion joiuts in iMegral curb and sidewalks shall be located at the same ]ocation as the expansionjoints in the adjoining sidewalk. F) Finishing and Curing i) The concrete curb shall be finished and cured in accordance with Seaion 502.14, 502.15, 504 and 605.04(� of the Standard Specifications. ii) Curing compound shall be applied to all exposed surFaces on slip-£ormed Page 6 of 8 CiTy of Carme] Concrete C�rb Policy December 13, 2006 concrete curb. For £ortned concrete curb, curing compound shall be applied to all exposed surFaces including sides after any fortns are removed. iii) The concrete curb shall be allowed to cure for a minimum of 5-days prior to commencing bac�lling operations adjacentto the concrete curbing. G) Ba�lliug i) The spaces adjacent to the concrete curb shall be bac�lled in accorda�ce with Section 605.04(g) of the Standard Speci£cations only after the concrete curbing is inspec[ed and accepted by the Engineer in accordance with Sec[ion 5 of this policy. ii) Backfilling operations shall be completed prior to opening the azea to regulaz construction tr� c. 5) InspecGons A) All materials fumished and each part or detail of the work will be subjec[ to inspec[io�� per Section 105.10 of the S[andard SpeciScatio��s for the pu�pose of ascertaining lhat the work is in substantial conformance with this policy and the approved construction documents. B) The Contrac[or shatl notify the Engineer a minimum of 48-hours in advance of commencing any work subject to Uie standards established by this policy. C) The Contrac[or shatl schedule proafrolls with the Engineer a minimum of 48- hours in advance of such proofrolls. D) The Contrac[or and Enginaer will conduct an inspection of the naw coucrata curbing for any damage, includiug freeziug or random cracks. The inspec[iou and all necessary repairs shall be completed prior to bac�lling operations. E Sam lin and testin of materials e ui ment or construc[ion work ma be ) P B B , 9 P Y required at the expense of the Contractor a[ the discretion of the Engineer for the pu�pose of ascertaining that the work is in substaMial conformance with thie policy and the approved construction documents. Sampling and testing shall confocm to the requireme`rts of the sections of the Standard Specifications applicable to the portion of the work suspected to be non-compliant or as direc[ed by the Engineer. F) Where the Engineer determines that is necessary to confirm wmpliance with standards of quality orthickness, concrete curb shall be cored and tested at the expense of the CoMractoc The average thicknesses of the curb must equal or exceed the minimum prescribed by the approved construction documents. G) Such inspections shall not be constmed to relieve the developers' engineers or contractors in any way from their obligations and responsibilities under their conlracts. Specifically, inspection by the Engineer, or by retained engineers or testing agencies, shall not require them to assume responsibilities for the approved construction doc�ments, for any misinteipretation of the approved construction documenis by the contractors during conshvction, or for the means and methods of construction, nor for safety on thejob site. CiTy of Cazmel Concrete Curb Policy December 13, 2006 H) W ork identified to not meet the requirements of this policy or the approved construction docume�rts, u��acceptable work, whether the result of poor worlmianship, use of defective materials, damage through carelessness, or any other oause found to exist prior to the fival aooeptauoe ofthe work, shall be removed immediately and replaced in an acceptable manner at the CoMractor's expense. I) If the Contractor fails to comply forthwith with any order made under the provisions of this subsection, the Engineer will have authority to cause unacceptable work to be remedied or removed and replaced; to cause unauthorized work to be removed; and to deduct the costs from any monies due or to become due. .� Work done coMrary to instructions provided by the Engineer shall be considered unacceptable and snbject to immediate removal and replacement iu accordance with the instructions provided by the Engineer. 6) Accepta��ce A) Before acceptance of the concrete curb, the Engineer shaLl detennine if the improvements are in substaMial compliance with this policy (except for any variances granted) and the approved construction doc�ments. B) The Engineer may, ai his sole discretion, accept work that is not in confomiance with this policy provided that the work is bonded for a period greater than three ears. The En ineer shall establish [he ex[ended bondin re uirement. Y B B 9 Page 8 of 8 � � 0 � N 0 � 3 a` `o � N a � � v � _ VERSATTLE CONSTRUCTION GROUP, LLC. sm ea< r��y aooa, s�¢a sm J618< Gk� ]I251535]9 �FOx_ 31]9&]SB1 � � � �H � � a° � ~ � � � � � � � ?� C� C,� U Job No.: � Oate Stamped�. 13039 9/30/13 Drown By: Checked By Scale: caw � tab CAD FlLE. GV13039\�10 arbing poliq.dwg CERTIFIED BY: THIS DRAWING IS THE PROPERTY OF VEFSATILE CONSrRUCTION GFOUP LLC AND IS NOT TO BE USED FOF ANY OTHER PURPOSE THAN THE PFOJECT DESCRIBED HEREIN. me C810